HomeMy WebLinkAbout10/14/1993 Council Minutes1
1
1
SPECIAL COUNCIL MEETING OCTOBER 14, 1993
WITH THE HUGO CITY COUNCIL
CITY OF LINO LAKES
COUNCIL MINUTES
DATE : October 14, 1993
TIME STARTED : 7:00 P.M.
TIME ENDED : 8:55 P.M.
MEMBERS PRESENT: Reinert, Neal, Kuether, Elliott, Bergeson
MEMBERS ABSENT None
Hugo City Council members present: Bernard Brunotte, Debra
Barnes, and Francis Miron. Hugo City Administrator, Bob Museus
was also present. Lino Lakes staff members present: City
Administrator, Randy Schumacher, City Engineer, Darrell Schneider
and Clerk -Treasurer Marilyn Anderson.
The purpose of the meeting was to discuss matters of mutual
interest to both cities.
Elmcrest (24th Avenue) Bridge Replacement - Mr. Museus explained
that plans have been completed for the replacement of the bridge
over Hardwood Creek and the surveys have also been completed.
The permits need to be renewed. Easement documents are being
drafted and must be executed. The estimated cost of replacement
is $137,873.00. Both the City of Lino Lakes and the City of Hugo
would be responsible for $31,650.00 of the costs.
Mr. Schumacher explained that this project has been under
consideration for several years and will be completed as soon as
MnDOT can budget for its share of the reconstruction costs. The
City of Hugo has budgeted its portion of the costs for payable
1994.
I35E/Main Street Interchange - Mr. Schneider used a map to show
the present zoning in the area. He noted that an Interchange
Study was completed on this area which includes an analysis of
the soil conditions. Mr. Schneider will see that the City of
Hugo gets a copy of this study.
Council Member Barnes asked if the City of Lino Lakes is
considering a buffer on the eastern boundary with the City of
PAGE 1
SPECIAL COUNCIL MEETING OCTOBER 14, 1993
WITH THE HUGO CITY COUNCIL
Hugo. She also asked if the City of Hugo had been notified of
the City of Lino Lakes plans. Mayor Reinert explained that this
is part of the reason for the meeting. He also said that once
the Centerville annexation matter is finalized, he hoped that the
City of Centerville would join the City of Hugo and the City of
Lino Lakes to discuss a master plan for the entire area so that
the development in the area would be compatible for all three (3)
municipalities. Each city would benefit.
Council Member Bergeson asked if the City of Hugo has made any
plans for the area. Council Member Barnes said no but the City
of Hugo would like to be involved. She explained that she would
like to see the entire process be "up front" and invite the Hugo
citizens to be a part of the process.
Mr. Schneider continued his presentation by explaining that the
wetlands in the area will make development difficult. He noted
that Lino Lakes is developing a plan for construction of a state
aid road and for utilities in the area. At this time there may
not be a market for the area. Council Member Miron asked if the
freeway had an impact in servicing the area east of the freeway.
Mr. Schneider explained that it is an obstruction, however the
City does plan to have a water tower and wells on the east side
of the freeway in the future. He noted that these systems can be
interconnected with the system in Hugo and/or Centerville. Mr.
Schneider explained that Lino Lakes currently has a system
interconnected with the City of Shoreview.
Mr. Schumacher suggested that both City Councils consider
appointing a committee that would study any significant issues
arising in the "corridor" surrounding I35E. Council Member
Kuether suggested drawing the perimeter of this corridor and when
anything significant is proposed for the corridor, both City
Councils would meet to discuss the matter.
Mayor Reinert suggested that a "master plan" be prepared for the
corridor. Council Member Miron noted that the critical part of
expanding sewer and water services is the cost. He suggested
that since the two (2) municipalities border each other, it may
be in the best interest of both municipalities to share both the
benefits and costs in projects. Council Miron said it seemed
ridiculous to build a water tower in that area and not serve
beyond the Lino Lakes boundary. Mr. Schneider explained that it
would be less expensive to build a million gallon tower rather
than two (2) 500,000 gallon towers and share the use based on an
agreement. Council Member Miron said that the City of Hugo would
be interested in development proposed for east of I35E and that
entire corridor.
PAGE 2
1
1
1
SPECIAL COUNCIL MEETING OCTOBER 14, 1993
WITH THE HUGO CITY COUNCIL
Council Member Bergeson asked if the City of Hugo had any long
range plans for servicing the western portion of Hugo with
utilities. Mr. Museus explained that the City of Hugo is
currently updating their comprehensive land use plan and this
will be a good time to talk about that. area.
Mr. Schumacher noted that there are some cooperative planning
grants available. The grants would fund approximately 75% of the
cost of the planning. A proposal would have to be drafted to
apply for the grant. Mr. Schumacher explained that some
municipalities are taking action to coordinate plans. The grants
will stand on merit rather than legislative involvement. Mr.
Schumacher will have Consulting Planner, Al Brixius look into
this matter. Mr. Schumacher and Mr. Museus will put together a
background memorandum on where to go with this matter. Mr.
Schneider noted several important elements to be included in a
proposal: separate sewer districts, drainage concerns,
Clearwater Creek, Elmcrest Avenue improvement. Mr. Museus noted
that currently the zoning in Hugo along the Lino Lakes border is
Agricultural. He also noted that only a small corridor following
the interceptor is serviced with utilities and there are about
800 hookups.
I35E - 80th Street Interchange - It was noted that Representative
Rod Grams is supporting an interchange at this location. The
idea is that this area will become a business center. An
interchange will require the support of Anoka and Washington
Counties and both the City of Hugo and the City of Lino Lakes.
Council Member Miron asked how this interchange would benefit
Lino Lakes. Mr. Schneider explained that the area is very
important and will be included in the MUSA. Council Member Miron
said that this interchange will be very important to Hugo to
relieve the traffic in the downtown area. Mr. Museus noted that
this interchange probably will not be developed within the next
10 years. In the interim the downtown area of Hugo could become
a "mess". Channeling some of the traffic north of Hugo to I35E
would be a benefit to Hugo. Mayor Reinert explained that if this
is something that the City of Hugo is interested in, the City of
Lino Lakes would be supportive. Mr. Schneider noted that this
interchange is included in Anoka County's long range plans.
Mr. Schneider referred to the Clearwater Creek drainage area and
noted that it probably included 40 to 50 square miles. He
referred to a map showing the 100 year high water mark. Mr.
Schneider explained that if utilities are to be extended into
this area, the high water table would have a significant impact.
PAGE 3
SPECIAL COUNCIL MEETING
WITH THE HUGO CITY COUNCIL
OCTOBER 14, 1993
Mr. Schneider updated the Hugo City Council on the progress of
construction for the Construction Labors Union building on Main
Street and Elmcrest Avenue.
Elmcrest Avenue (24th Avenue) - Mr. Schumacher noted that this
street has been a maintenance problem for both Lino Lakes and
Hugo for many years. He gave a brief background of recent action
in this area. Plans and specifications were completed to upgrade
the street and Anoka County and Washington County were asked to
participate in the project. Both counties refused. The City of
Lino Lakes and the City of Hugo adopted a resolution requesting
preparation of a feasibility report and the report was completed
by SEH. At this time no hearings on the improvement have been
held in Lino Lakes and there are no plans to hold a public
hearing. Because of soil conditions, the improvement will be
very expensive.
Mr. Museus said that it is his understanding that the City of
Hugo "stepped back" because of the expense. He suggested that a
master plan be prepared for Clearwater Creek and the improvement
of Elmcrest Avenue. Mr. Museus explained that at this time the
development on this street is not creating a need for further
improvement. However, if the intersection at I35E and 80th
Street is realized, Elmcrest Avenue will be heavily used.
Mr. Schumacher explained that one advantage of waiting to begin
this improvement is that the population in the City of Hugo will
reach 5,000 and the city will be able to use state aid funding.
Mr. Museus explained that the City of Hugo will hit 5,000
population in 1993. The City would have to have an official
census taken to be eligible for state aid funding and then a
state aid road system would have to be prepared.
Shared Services - It was noted that the City of Hugo contracts
with Washington County for police protection at a cost of
approximately $250,000.00 per year. Four (4) officers are
assigned to Hugo and the contract provides for almost 24 hour
coverage. It was noted that Lino Lakes has its own police
department and the current budget is approximately $700,000.00.
Mr. Schumacher explained that Lino Lakes is part of the
Centennial Fire District and this is working very well. Council
Member Barnes asked how the district operated. It was explained
that each municipality has its own fire station and each
municipality pays the district an amount based on population and
area. It was noted that there will be a need in the future for
another station close to the Hugo boundary and that shared
services from the station could be a possibility.
PAGE 4
1
1
1
SPECIAL COUNCIL MEETING OCTOBER 14, 1993
WITH THE HUGO CITY COUNCIL
Mayor Reinert asked if the City of Hugo was happy with the police
protection. It was noted that there is not enough patrol and
that the costs are escalating. There is additional backup if it
is needed.
Council Member Barnes noted that the fire protection facilities
in the City of Hugo need upgrading as well as the city hall. She
noted that the next step appeared to be where to locate these
facilities. If a fire station is located near to the Lino Lakes
boundary, this service could be shared.
Council Member Elliott said that she liked the idea that both
city councils get together every few months to share common
interests.
Council Member Barnes asked if Lino Lakes had many gravel roads.
It was explained that there were very few and the City is trying
to prioritized them so that a program for upgrading them can
begin. Mr. Schumacher explained that when developers build a
city street, the developer is required to escrow funds for the
first seal coating of that street. He noted that this
requirement does help the budget.
Council Member Barnes asked about the city park system. Council
Member Elliott explained that developers are required to give the
city land or a cash donation based on a formula developed by the
Park Board. This has provided limited funding for the
development of new parks and the upgrading of equipment for older
parks. The Friends of the Parks Foundation recently incorporated
and will be assisting in park improvements. The Park Board has
prepared an extensive comprehensive park plan in which all park
needs are outlined from mini parks to athletic complexes. The
Park Board is also considering a referendum to upgrade older
parks and acquire lands for a recreational complex.
Mayor Reinert noted that the City of Lino Lakes is working with
Anoka County to complete a GIS plan. A significant investment is
being made in computer hardware and software. Mr. Schneider
explained the program and its significance to the City.
Council Member Miron felt this had been a beneficial meeting and
hoped another would soon follow. Mr. Schumacher and Mr. Museus
will meet to prepare a grant proposal and create a master plan.
Another meeting was planned for after the first of the year.
The meeting ended at 8:55 P.M.
PAGE 5
SPECIAL COUNCIL MEETING
WITH THE HUGO CITY COUNCIL
OCTOBER 14, 1993
These minutes were considered, corrected and approved at the
April 11, 1994 regular Council meeting.
( -rhi J'h_.4-eJv? y
.Anderson,
Clerk -Treasurer
Vernon F. Reinert,
Mayor
Mr. Museus noted that because of the wetlands, the entire area
would need a considerable amount of investigation. He noted that
there would be no benefit to zone for a particular use if it
cannot be developed.
PAGE 6
1