HomeMy WebLinkAbout03-02-2015 Council PacketWORK SESSION AGENDA
CITY OF LINO LAKES
Monday, March 2, 2015
CITY COUNCIL WORK SESSION
Community Room (not televised)
6:00 P.M.
1. Fire Station Bid Alternates — Apparatus Bay Doors
2. Fire Facility Financing (Springsted)
2a. Miss Lino Lakes Ambassador Program
3. Recycling Update — Marty Asleson (from Feb. W.S.)
4. Tree Planting Program
5. Met Council Density Calculation Formula
6. Memorial for U.S. Military Service Members
7. Advisory Board Applicants
8. Council Member Updates
9. Monthly Progress Report
10. Review March 10 Meeting Agenda
Adjourn
WS — Item #1
WORK SESSION STAFF REPORT
Work Session Item No. 1
Date: March 2, 2015
To: City Council
From: Michael Grochala
Re: Fire Station Bid Alternates — Apparatus Bay Doors
Background
On February 23, 2015 the City Council awarded the construction contract for the Lino
Lakes Fire Station to Jorgenson Construction in the amount of $3,847,100.00. The award
included bid alternates 1 through 4.
Bid alternate 5 was a deduct in the amount of $15,800 for installation of high speed
coiling doors instead of the four -fold doors included in the base bid. During
consideration of the award the council requested further review and discussion of the
high speed coiling doors at the March 2, 2015 work session. Quinn Hutson, CNH
Architects, has prepared a memorandum comparing the alternative door systems. Mr.
Hutson will be present at the meeting to discuss.
Requested Council Direction
Staff is requesting council direction regarding acceptance of bid alternate no. 5.
Attachments
1. CNH Architects Memo, dated February 24, 2015
7300 WEST 147TH STREET SUITE 504 APPLE VALLEY, MN 55124-7580 (952) 431-4433
MEMORANDUM:
PROJECT:
CNH NO:
DATE:
TO:
SUBJECT:
Lino Lakes Fire Station
14045
February 24, 2015
City of Lino Lakes - Mayor and City Council
Alternate #5 Background Information
027
The following is a summary of the information related to review of Alternate #5 High Speed Coiling
Doors instead of Four -Fold Doors for City Council consideration for the Lino Lakes Fire Station
project. CNH Architects has provided additional review and information for use by the City Council
in considering this item.
Alternate #5 is a deduct to provide high speed coiling doors at the apparatus bays instead of four -fold
doors indicated in the base bid. The four -fold door system was designed originally as the only
approach for this project but the high-speed coiling doors were added as requested during the bidding
process as an alternate for consideration by Council.
Operation:
Both doors systems provide the operational benefits that are important for a fire station, quick
opening and closing allowing for faster response time and less risk of fire apparatus hitting the door
in the urgency of leaving the building on a call. Slower opening sectional overhead doors are much
more likely to be hit damaging the door and apparatus. While four -fold doors are easier to operate
manually in the case of a power failure than high speed coiling, this is not an issue for this facility
since the doors will be connected to the emergency backup generator.
Maintenance:
In our opinion, the maintenance on both door types should be very low. We have installed five four-
fold doors at the Roseville Fire Station and they have been very pleased with their operation for the
past 18 months of operation. We have also installed high-speed coiling doors at an auto dealership (a
common use of this door type) and the record for low -maintenance operation is very good as well.
CNH Architects is also aware of concerns that the Eagan Fire Department has had with the four -fold
doors that were installed at their Fire Safety Center where they have had a lot of adjustments and
several maintenance issues. It is hard to determine how representative the Eagan project is as the
doors were specified incorrectly by that projects design firm, disassembled totally twice for factory
painting, reassembled each time and then reinstalled. There are over 20 fire stations in the Twin
Cities that have four -fold door installations while high-speed coiling doors have not been installed
locally in any fire stations. They have however been installed in dozens of other uses locally include
many auto dealerships as noted earlier as well as fire stations in other parts of the country.
Energy Efficiency:
The four -fold door and high-speed coiling doors have been compared for their thermal values. Four-
fold doors have a typical U -value of 0.45 for a door based on an insulated door panel and 1"
P:\PROJECTS\2014\14045\4 - BIDDING\ALTERNATE #5 RECOMMENDATIONS.DOCX
insulated glass. High-speed coiling doors being considered for this project have a U -value of 1.20
for an uninsulated door with double pane glazing. Neither U -value is exceptional, but the four -fold
door is almost three times better than the high-speed coiling door. The energy efficiency benefits of
high-speed coiling doors are based on the amount of heat lost during the open period which is greatly
reduced due to the high speed of the opening process. Doing additional research an article
addressing this was found in the February, 2015, issue of Construction Specifier magazine just
published this month. This article documents a study done on energy efficiency of high-speed
coiling doors as compared to sectional doors. The conclusion of the study is highlighted in the table
at left indicating that the energy
conservation breakpoint between high-
speed coiling doors and conventional
doors is at an operation of 55 cycles
per day. Since the fire station is
anticipated to only have a very small
fraction of that many daily cylces, the
U -value is much more important than
speed for energy conservation
resulting in the four -fold door being a
better energy efficiency choice for a
fire station. Conversely, for the more
common installation at auto dealership
service reception doors where cycles
are more commonly in the 100+ cycles
per day, the high-speed coiling door
would be the best energy performer.
30000
} ▪ 15,000
c
� 20,000
7, mow
1• 5,000
3
t
43 5000
Annual Energy Consumption in Chicago for a r R8' Door
(Facility Heated Only)
0
20 40 60 80 100 120 140 160 180 200
Number of Cycles Per Day
—High Performance Door ,Conventional Door • Breakeven at 55 Cycles per Day
Based on the test conditions, a high-speed door becomes more energy efficient
versus a conventional door after 55 cycles.
Visual Impact:
Aesthetically, the high-speed coiling doors differ in two ways from the four -fold doors specified in
the original design. First, the window pattern in the high-speed coiling door is different as each
section of door is 9" or 10" tall (depending on manufacturer) with about a 6" to 7" glass strip
centered in the panel. The four -fold door designed for this project has two large glass windows in
each of its four panels resulting in a different look and a higher percentage of glass providing more
visibility of the apparatus inside the station. Secondly, the four -fold door opens horizontally stacking
inside the building at each side of the door opening. The door panels when open are protected by 6"
steel bollards.
The high-speed coiling door rolls up into a 3 foot deep by 3 foot tall box at the head of the door.
This box sticks up into the window opening designed to be over the doors. If this door style is
selected we would raise the sill of the windows at the three coiling doors in order to appropriately
address this change. The following page shows renderings of the front of the fire station with each
type of door for your review.
P:\PROJECTS\2014\14045\4 - BIDDING\ALTERNATE 45 RECOMMENDATIONS.DOCX
NB
'!'I lUf�Il' 11
Four -Fold Apparatus Bay Door Rendering — Base Bid
High -Speed Coiling Apparatus Bay Door Rendering — Alternate #5
Manufacturer:
CNH Architects specified multiple manufactures for the apparatus bay doors of both styles as is
required under public bidding rules as well as to provide competition and lower costs. We discussed
the four -fold door and high-speed coiling door bidder results with Jorgenson Construction, the
successful general contractor for this project to determine which manufacturers were the low bidders
for each of the two door types.
There were two specified four -fold door manufacturers, Electric Power Door of Hibbing and Door
Engineering of Mankato. Door Engineering is the door manufacturer to be provided by the low
bidder under the base bid for four -fold doors. This is the same manufacturer as we have used in the
past at the Roseville Fire Station.
Similarly, there were two specified high-speed coiling door manufacturers, Hormann Flexon
manufactured in Pennsylvania and Rytec out of Wisconsin. The low bid contractor for high-speed
coiling doors bid using Hormann Flexon as did most of the overhead door contractors bidding. This
P:\PROJECTS\2014\14045\4 - BIDDING\ALTERNATE #5 RECOMMENDATIONS.DOCX
is the manufacturer of the doors we have used in the past at auto dealerships. As you know, on a
public project such as this hand-picking individual manufacturers is not allowed so we need to
evaluate this based on the low bids provided. Further reviewing bid results it was indicated that the
lowest cost price for four -fold doors was actually lower than the Rytec high-speed coiling door price
provided by the subcontractor bidding that door system. If Hormann Flexon doors were not bid,
Alternate #5 would have been a cost add instead of a deduct.
Conclusion:
There are many competing aspects to the determination of which door to select — aesthetically we
prefer the four -fold door while economically there is a reasonable savings for the high-speed coiling
door. Energy conservation is also better on the four -fold door as the opening cycles anticipated for
the fire station does not approach the 55 cycles necessary to achieve best performance in a high-
speed coiling door. Consequently, CNH Architects is looking for direction from City Council and
Staff on which approach is preferred for this project.
I will be at the City Council Workshop and City Council Meeting to answer any questions you may
have regarding this door option.
Respectfully Submitted,
Quinn S Hutson, AIA, LEED AP
Principal
CNH Architects, Inc.
P:\PROJECTS\2014\14045\4 - BIDDING\ALTERNATE #5 RECOMMENDATIONS.DOCX
WS — Item #2
WORK SESSION STAFF REPORT
Work Session Item No. 2
Date: March 2, 2015
To: City Council
From: Michael Grochala
Re: Fire Station Financing
Background
At the February 23, 2015 work session Terri Heaton, Spingsted Inc., provided an
overview of the two financing methods being proposed for the construction of the Lino
Lakes Fire Station. Based on their evaluation Springsted is recommending the use of
Lease/Revenue bonds to finance the building construction and internal road
improvements. Abatement bonds will be used for construction of the external road and
utility improvements. The amount of this bond will be offset in part by funding from the
trunk utility area and unit fund.
Mikaela Huot from Springsted Inc., will be present at the work session to review the
abatement bond process. A public hearing, as required by law, is being noticed for the
March 23, 2013 City Council meeting.
Requested Council Direction
None required. Staff and Springsted representative will be available to address council
questions.
Attachments
None.
11.4 C. V4 on z a.
From: Ray Culp
Sent: Wednesday, February 25, 2015 3:20 PM
To: Dave Roeser
Subject: Miss Lino Lakes Ambassador Program
Dave,
We spoke at the Miss Lino Lakes Ambassador pancake breakfast this last weekend. Our discussion was
mainly focused on the float the young women ride on during parade events.
I have completed a preliminary short presentation concerning the float (with a brief description of the
program) and was wondering if I might be able to give the presentation at the next working board
meeting.
I know it is only February but summer, or the parade season, is right around the corner. I would like to
have the float as complete as possible for the beginning of this season. Our community, and the
ambassadors, will be well represented by the recommended float upgrades and refresh.
I hope that the city council will approve the plan, please let me know if there is any additional work I can
do to do to help make this happen.
I appreciate your help concerning this matter.
Thanks,
Ray
This electronic message including any attachments ("Message") may contain information that is
privileged, confidential and/or exempt from disclosure under trade secret and other applicable
law. If you are not the intended recipient, notify the sender immediately, permanently delete
all copies of this Message, and be aware that examination, use, dissemination, duplication or
disclosure of this Message is strictly prohibited.
<City Council Presentation (3).pptx>
2
WS — Item #3
WORK SESSION STAFF REPORT
Work Session Item No. 3
Date: March 2, 2015
To: City Council
From: Marty Asleson
Re: Recycling Funding
Background
In 1989, the Minnesota Legislature adopted comprehensive waste reduction and recycling
legislation based on the recommendations of the Governor's Select Committee on
Recycling and the Environment (SCORE). SCORE is part of Minnesota's Waste
Management Act and provides counties with a funding source to develop waste
reduction, recycling and solid waste management programs. Ambitious goals for
recycling and waste reduction were set for Minnesota counties and have typically been
met, if not exceeded.
The dollars that the City receives from SCORE is an annual apportionment. There are no
guarantees this funding will always be there. It has been a "carrot" to promote and
increase recycling at the City level.
The City has available in 2015 $41, 900 basic SCORE funding and another $39,764 of
enhancement funding for a total recycling grant of $81,674.
As we spend money during the year, the money is coded to the recycling account. The
account is reimbursed at the time we request SCORE funds (two times a year).
Money that we collect from a recycling event is revenue placed into the general fund.
Any money that we collect is deducted from the SCORE dollars reimbursement approved
by the County.
Freimuth Enterprises runs our monthly recycling days. This is set up similar to the
Blaine monthly recycling days. The company collects money for the materials. The City
gets credit for the tonnage that is recycled that day. Prices for monthly recycling day is
advertized at least bimonthly.
There are some things that we recycle at the monthly and yearly recycle days that
Freimuth Enterprises traditionally does not provide service for. Paper shredding is one of
them. Mattresses and old furniture were items that mostly went to the landfill in the past.
Since we obtained a container to collect them in, this container will be at recycling days.
We have been collecting $5.00 for each mattress and piece of furniture. The disposal
recycling fee is about $15 for each mattress once the mattress reaches a recycling
destination. There is also a disposal fee for old furniture at the recycling facility. We get
charged for this and pay Freimuth Enterprises for transporting it to the plant. The money
we collect for mattresses and furniture is taken off SCORE request, money we pay to
have it recycled is received back through SCORE. In 2014 we collected $1,332.85.
As a policy we have routinely charged a small amount from residents to recycle some
materials like furniture and mattresses. We are subsidizing most of the cost with SCORE
dollars. If SCORE dollars were decreased or became unavailable, we would have to
charge the full amount to recycle these materials.
There are some items we take for free. We take tires for free because right now mosquito
control will take our tires for free. If we didn't have a free pick up from mosquito
control, we would have to pay to have the tires recycled. We would collect money for
tires at that time because this is not a SCORE eligible material. It is classified as a
"problem" material. We take steel for free because it generates revenue (taken off of
SCORE). We take batteries for free because we have an agency that comes takes them
for free. We take household items for free because we have someone to take household
items from our recycling site. Sometimes we have to pay a vendor to take materials like
household items (truck and time). That part is SCORE eligible. We take small engine
materials for free because we have a Lino Lakes resident that takes the small engine
equipment to train unemployed, unskilled people in small engine repair.
Requested Council Direction
Staff is requesting City Council direction regarding the current policy of charging
nominal fee for drop off of mattresses and furniture.
Attachments
None.
WS — Item #4
WORK SESSION STAFF REPORT
Work Session Item No. 4
Date: March 2, 2015
To: City Council
From: Marty Asleson
Re: Reforestation /EAB
Background
The City Council has requested a discussion about reforestation in light of the Emerald
Ash Borer threat.
Council member Roeser forwarded a brochure describing a program that Minneapolis
offers their residents. The program offers residents a tree for their private property at a
$25 match to a $95 tree obtained from the Twin City Tree Trust. The City of
Minneapolis subsidizes the residents $70 for these trees. The City of St Louis Park also
runs a similar program but the residents are required to pay a $35 administrative fee.
The City of Lino Lakes could do this program but would need to provide funding in the
budget to facilitate it.
Other sources of trees available to residents:
• Council member Roeser has interest in providing trees from acorns.
• The Anoka Conservation District has a tree sale each year. We have this on our
web page right now with order forms. The Conservation District will try to get us
their tree sale information earlier in the year so we can get it in our newsletter.
• The DNR has tree seedlings available each year. We have provided thousands of
these seedlings to residents on Earth Day and Arbor Day each year.
Requested Council Direction
Staff is requesting Council direction regarding the supply of new trees to residents
Attachments
1. Minneapolis Brochure
Get ready to order a tree to plant
on your MinneapoUs property this spring.
Starting Marren 23, the City of Minneapolis
is offering more than 1,000 five- to eight -foot trees
for only $25 each.
Trees are available for Minneapolis property owners
including residents, businesses and nonprofits.
Choose from several varieties and sizes of trees,
including fruit trees.
First-come, first-served — order early for best
selection. Limit one tree per property, maximum
three properties.
You'll pick up your tree May 16, 17, 18 or 19 at the
Minneapolis impound Lot.
www.tr f r o r
Mark your calendar now.
order your tree starting 8 a.m., March 23.
Pick it Hp May 16, 17, 18 or 19.
WS— Item #5
WORK SESSION STAFF REPORT
Work Session Item No. 5
Date: March 2, 2015
To: City Council
From: Michael Grochala
Re: Metropolitan Council Residential Density Formula
Background
At the February 17, 2015 City Council Strategic Planning Workshop, the Council raised
residential development density as a future concern. During the discussion the question
of how residential density is calculated was raised. The Council specifically suggested
that stormwater management ponds should be excluded from the net area of a parcel.
The Council requested the topic be placed on the work session for discussion.
Density Overview
The City's Comprehensive Plan includes a Land Use Plan. The Land Use Plan provides a
guide for managing future development and growth by determining future land uses,
development intensity, and areas for environmental protection. The City contains
approximately 21,267 acres. Of that area 9,900 acres (46%) is comprised of open water,
parks/open space, and wetlands and will remain undeveloped. Residential uses account for
approximately 34 percent of the total 2030 net developed land area. Mixed use areas, which
allow for both residential and commercial development, account for an additional 4.3 percent
of net land area. Each residential land use designation establishes a net density range as
follows:
Land Use
Net Density (units
per acre)
2030 Net Developed
Acres
% of Total Area*
Low Density
1.6 to 3.9
3,388
27.1
Medium
Density
4.0 to 5.9
581
4.7
High Density
6.0 to 10
162
1.3
Mixed Use
Varies**
536
4.3
*Total Acres = 12,480 (excluding wetlands & open water areas)
** Mixed use typical 8-15 units/acre. Legacy = 10-24/acre, Hardwood Creek 3.0-
4.5 units per acre
In order to ensure that regional sewer infrastructure investments are used cost-effectively, the
Met council requires a minimum average net density of three to five dwelling units per acre
1
for sewered areas of the city. The 2030 Land Use Plan guides new sewered residential
development at an average density of 3.01 units per net acre.
Density Definitions
The Lino Lakes Zoning Ordinance contains the following definitions:
DENSITY. The number of families, individuals, dwelling units, or housing structures per unit
of land. In this Ordinance, net density shall mean number of dwelling units per acre of
buildable land. Gross density shall mean number of units per acre of the total subject
property.
BUILDABLE LAND, CONTIGUOUS. Land area occurring within the property lines of a
parcel or lot excluding wetlands and/or water bodies.
In summary net density as defined in the zoning ordinance is the number of units divided
by the gross land area minus wetlands and waterbodies.
The City's definitions are different than the definition used by Metropolitan Council.
The Metropolitan Council calculates net density by taking the total land area and
excluding wetlands and waterbodies, public parks and open spaces, arterial road rights-
of-way, and any other area that is protected or removed from development by local
ordinances. Examples of areas that may be protected by local ordinances include steep
slopes and flood plains.
The "net" density calculation allows for the development site area to be adjusted to
account for unique physical characteristics of the property. Essentially these are limiting
characteristics of the land rather than requirements related to the design of the site. For
example, right of way for an arterial road is excluded from the calculation because it is
needed for purposes other than the specific development it abuts. Internal streets,
however, are necessary for the development of the site, and are not excluded.
Staff uses Metropolitan Council's definition for the purpose of meeting residential
density requirements. Generally the Metropolitan Council's definition is more permissive
in its exclusions than the City's zoning ordinance and results in a higher calculated "net"
density for reporting purposes.
Metropolitan Council has been fairly clear that stormwater ponds are not excluded from
buildable land. However, there may be cases where this is appropriate to do so. For
example, regional ponds that are being constructed to serve multiple properties or ponds
constructed as water features within a development. A case could be made that given
different soil characteristics throughout the city ponding can have greater impact on
density from site to site.
Our initial research identified a couple of communities that have density definitions that
exclude storm ponds.
2
Plymouth:
Density: The number of dwelling units divided by the acreage of a site, excluding
areas of wetlands and required wetland buffer strips, areas below the 100 year flood
elevation, areas below the ordinary high water level of lakes and streams, areas
below the high water level of ponds, and areas of right-of-way for arterial roadways.
For planned unit developments, the acreage of a site shall also exclude conservation
easement areas.
Rochester: While not subject to Met Council requirements the City of Rochester
has developed a site capacity calculation that determines net density. The formula
excludes arterial road right-of-way, stormwater detention areas, park/open space
and natural resource areas.
To illustrate the change in density by removing ponds we have developed the tables
below using two active projects in Lino Lakes.
NorthPointe
Gross Densi
Net Including Ponds
Net Excluding Ponds
Gross Area acres
Wetland
0
9.66
9.66
Conservation Easements
0
0.68
0.68
Arterial ROW
0
0.26
0.26
Park Dedication
0
5.04
5.04
Storm Ponds
0
0.00
2.80
met Area (acres)
94.09
78.45
57.03
# of Units
315
315
315
Gross Density (units/acre)
3.35
3.35
35
Net Density (units/acre)
3.35
4.02
4.16
Mattamy Project
Gross Density
Net Including Ponds
Net Excluding Ponds
Gross Area (acres) A
372
372.00
372.00
Wetland
0
25.23
25.23
Conservation Easements
0
0.00
0.00
Arterial ROW
0
3.92
3.92
Park Dedication
0
55.11
55.11
Storm Ponds
0
0.00
57.03
Net Area (acres)
372
287.74
230.71
# of Units
876
876
876
Gross Density (units/acre)
2.35
2.35
2.35
Net Density (units/acre) ,
2.35
3.04
3.80
As shown, the net density in NorthPointe would increase from 4.02 to 4.16 by excluding
storm ponds. The net density of the Mattamy project would increase from 3.04 to 3.8
units per acre. The density calculation has no physical impact on the site development.
3
Neither the gross acres nor the number of units have changed as a result of the net density
definition.
Requested Council Direction
Staff is requesting concern direction on whether to develop new density definitions. At a
minimum the existing zoning ordinance definition should be revised to reflect exclusions
currently provided by Met Council.
If the City Council wishes to incorporate the exclusion of storm ponds, staff would
recommend additional research on density definitions and evaluation of possible impacts.
Attachments
None.
4
WS — Item #6
WORK SESSION STAFF REPORT
Work Session Item No. 6
Date: March 2, 2015
To: City Council
From: Jeff Karlson
Re: Memorial for U.S. Military Service Members
Background
Mayor Reinert was contacted by local Lino Lakes Lions Club members about placing a
memorial for U.S. Military Service members somewhere in Lino Lakes.
The mayor would like discussion on how the City can help with this effort.
WS — Item 7
WORK SESSION STAFF REPORT
Work Session Item No. 7
Date: March 2, 2015
To: City Council
From: Lisa Hogstad-Osterhues
Re: Annual Board Appointments
Background
Attached is an outline of new applicants for each board or committee with openings.
- Park Board — 1 seat, 1 new applicant
- P&Z — 1 seat, 1 new applicant (Term expires Dec. 31, 2016 — Charles Evan
resigned from his term)
- EDAC — 2 seats, 0 applicants — reposted
Applicants are both new to the process and have not been interviewed previously.
Requested Council Direction
The council should determine the application review process:
1. If new applicants are to be interviewed and date/time to set up interviews.
Attachments
List of new applicants
(applications will be provided to council previous to the interview date)
WS — Item 7 Attachment
New Advisory Board Applicants
Park Board
1. Clark Gooder
EDAC
1.
2.
Planning & Zoning
1. Matt Kassner (Term expires Dec. 31, 2016 — Charles Evan resigned from his term)
Park Board —1 seat, 1 new applicant
P&Z —1 seat, 1 new applicant
EDAC — 2 seats, 0 applicants
Item #9
Monthly Progress Report
March 2, 2015
Item
Last Action Taken
Staff
Status
Digital Scanning Project
12/08/14 — Council adopted 2015 budget, Jeff
which includes one PT scanner operator
We're down to one scanner as
of February 3
Labor Negotiations
Police Officers, AFSCME, and 49er's are
settled for 2015.
Jeff
Mediation is scheduled with
the Sergeants on March 10.
White Bear Lake Restoration
Assn. v. Dept. of Natural
Resources (DNR)
The WBL Restoration Assn. & WBL
Homeowners' Assn. reached a settlement
agreement with the DNR that imposes a
three-year stay on the lawsuit so funds
can be appropriated for a Northeast Metro
Project. This involves a construction
project to connect Northeast cities to the
St. Paul Regional Water Service. Lino
Lakes is one of seven cities included in
the second phase of the project.
Jeff
Hugo hosted a NE Metro
Water Summit on Jan. 29 to
discuss the settlement
agreement. The other cities
named in Phase 2 of the
project are Centerville, Circle
Pines, Columbus, Forest
Lakes, Hugo, and Lexington.
Legacy Grant Funding
1/22/15 — Staff met with Met Council and
Anoka Co. Parks officials to discuss the
qualifications for Legacy Grant funds for
certain park and trail projects in Lino
Lakes
Rick
Staff prepared a report for the
Council
CFRA vs. Lino Lakes
10/27/14 — CFD Fire Relief Assn.
appealed district court's decision to
dismiss Assn's petition for a writ of
mandamus
Jeff
Arguments will be heard in
the Court of Appeals on
March 26
Joint Council/Board Meeting
Joint meeting will be held Monday,
March 16 at 6:30 p.m.
Julie
Set agenda
11 kNip
4N1 NIARiPtt-
Ltb
774,R, F •
kNippt
L K
NIPPEL,MY
WAR I
DUINc B
WORLD
�r� NAVYtVNE rT
RE U WAR 11
RAYMOND
J
NAVyMALSOM
1956 - 19b0
KNIPPEL
(BORNE
Ar
AY-DEN;CE
�9
11
6RL�E E �
3 196$
Noy REs i E:NI
E-
196 SERV
PHILIIP
AV��REFN1
N
1960 Y
1956
•
ARNO F
ARMY AIR,y CORP
�FNNING
WORLD WAR II
BERNARD J NOLAN
NAVY
WORLD WAR II
STEVEN L GREENE
NAVY
VIETNAM
KENNETH W GREENE
NAVY
VIETNAM
•
OSCAR JOHNSON
ARMY
WORLD WAR 1
HARRY JOHNSON
ARMY
WORLD WAR I
LOWELL JOHNSON
ARMY
1961 - 1962
C
HA RolEery
Lino Lakes Fire Station
Lino Lakes City Council
Workshop
Apparatus Door Options
March 2, 2015
Lino Lakes Fire Station
CNH
� Agenda r
Lino Lakes Fire Station
Alternate 5 — High Speed Coiling Doors
Successful Manufacturers & Cost
Energy Efficiency
Image — Four -fold Door
Image — High-speed Coiling Door
Project Timeline
Questions
Lino Lakes Fire Station
Civiv
ARCHlT�io :Apparatus Bay Door Options
Alternate #5
Base Bid
Four -Fold Door
Door Engineering, MN
No Cost Change
Alternate #5
High Speed Coiling
Hormann Flexon, PA
15,800 Deduct*
*(Rytec coiling door bid was higher than lowest four -fold bid)
Lino Lakes Fire Station
CNN
`"� Apparatus Bay Door - Energy Efficiency
Alternate #5
Energy Efficiency — Door Closed
Four -Fold Door
High Speed Coiling Door
U -Value
0.45
1.20
Four -fold door almost more efficient at closed
position
Lino Lakes Fire Station
CNN
`"� Apparatus Bay Door - Energy Efficiency
Alternate #5
Energy Efficiency Based on Speed
High Speed Coiling Door benefit > 55 cycles/day
0.000
25,000
0
▪ 7:0.000
O
} 15.440
S+A
▪ 10,004
C
RI 5,000
a
0
Annual Energy Consumption in Chicago for a 8' x8' Door
(Facility Heated Only)
9rn2kes.wt PS 35 Cytics p
Slav
0 20 40 50 80 100 120 140 160 180 200
Number sof Cycles Per Day
—High Performance Door —Conventional Door • Breakeven at 55 Cycles Per Day
Lino Lakes Fire Station
Alternate #5
• Large glass panel pattern at door
• Full window above doors
• Aesthetic benefits
• Better energy efficiency
Lino Lakes Fire Station
CII1jL,
4Rem, High Speed Coiling Door Image
Alternate #5
• Smaller glass panel pattern at door
• Reduced window above doors
• Initial cost savings
• Less energy efficient
Lino Lakes Fire Station
Alternate #5
aratus Ba Door Selection
Four -Fold
Door
,, 111'1 ■�!i ®RHS' ■ i r r z ig !!
1111 tiiI� H-) ,
8111 1111 IIP "IL in
High -Speed
Coiling Door
Lino Lakes Fire Station
CNN
ARCylA Construction Mileposts
Contract for Signature
Timeline
3/2
Notice to Proceed �3/7
Pre -Construction Conference 3/15
Construction Start 4/15 weather
Substantial Completion 12/4/2015
Lino Lakes Fire Station
Public Sector Advisors
Springsted
((ES PRESENTATION TO
The City of Lino Lakes
Tax Abatement for the Road
Improvements near Fire
Station
March 2, 2015
PRESENTER:
Mikaela R. Huot, Vice President
Public Sector Advisors QI Springsted
Projects to be Funded
• Fire Station using Lease Revenue Bonds
• Fire Station No. 2 Road, Sanitary and Water Main
Improvements using Abatement Bonds
— Estimated Costs $850,000
— Estimated Bond Par Amount of $895,000
• Subject to final structure and availability of trunk utility fund
contribution amounts
Public Sector Advisors
Springsted
Why Abatement Bonds?
• GO Special Assessment Bonds require assessments -
none are anticipated
• Abatement Bonds are General Obligation backed
which provides the lowest bond interest rates
Public Sector Advisors
Springsted
Abatement
What is it? How Does it work?
• Economic development tool
• All properties identified pay taxes just like every other
property
• Created by Resolution
• Benefiting properties are identified and city tax rate
applied to the tax capacity is the maximum annual
levy allowed to be pledged to the bonds
• Fixed levy for the term of the bonds
Public Sector Advisors
Springsted
Tax Abatement Basics
• Defined in Minnesota Statutes 469.1812 to 469.1815
(as amended)
• NOT an actual abatement of taxes
• Permits levy of taxes for application toward
development purposes
• Adopted by resolution at a noticed meeting (does not
require property owner consent)
• Abatement resolution indicates terms: amount, length,
public benefit, etc.
Public Sector Advisors
Springsted
Tax Abatement Eligible Costs
• Improvements to private property
• Finance or provide public infrastructure
• Acquire or construct public facilities
• If bonds are issued, eligible costs only include
— public improvements that benefit the property,
— acquisition and conveyance of land or other property,
— reimbursements to the property owner for the cost of
improvements made to their property, or
— costs of issuance
Public Sector Advisors
Springsted
Tax Abatement Constraints
• No back-to-back abatements
— Eight years must pass before a new abatement may begin
on the same parcel
• Cannot be applied within TIF districts, but can be
used after TIF decertification
• Maximum duration of 15 years if three participants
(City, County & SD), 20 years if two or fewer
— Expect City only participation
Public Sector Advisors
Springsted
Tax Abatement Constraints
• If Tax Abatement Bonds issued - principal may not
exceed the estimated sum of total abatements
• Maximum aggregate annual abatement for any taxing
entity is the greater of:
- 10% of the net tax capacity or $200,000
• Maximum parcel abatement is subdivision's tax rate
times net tax capacity of parcel
Public Sector Advisors
Springsted
Tax Abatement —Project Examples
• Infrastructure Improvements
— New Interchange
— Highway Improvements
— New Frontage Road
— Public and private improvements for Development
• Construction of Community Center/Senior Center
• Construction of Recreational Facility
Public Sector Advisors
Springsted
Abatement Revenue Assumptions
• Maximum principal amount of bonds cannot exceed
estimated sum of abatements
• Identified properties to include in abatement:
— Residential properties that `benefit' from project
— Combination owner -occupied and rental
— Not currently within Tax Increment Financing District or
Tax Abatement
Public Sector Advisors
Springsted
Abatement Revenues
• Current taxable market values (existing)
• Approximately $12M of residential property value
— Final abatement analysis and identification in process
• Estimated total abatement revenues equal to debt
service principal ($895,000)
• Annual revenues between $55,000-$74,000
• 10-15 Year Term (commencing in 2016)
— Subject to final review and feasibility
Public Sector Advisors
Springsted
Proposed Tax Abatement Area
Public Sector Advisors
Stoneybrook
Abatement Area
12
Springsted
Schedule of Events —Next Steps
February 9, 2015
• City staff/Springsted working meeting
— Define boundaries
— Review sources and uses
February 23, 2015
• City Council Study Session
March 2, 2015
• City Council Meeting to discuss abatement
Public Sector Advisors
Springsted
Abatement Calendar
March 10, 2015
• Publication of notice of public hearing
March 23, 2015
• Public hearing to approve abatement
• Authorize sale of bonds
April 27, 2015
• Sale of bonds
End of May
• Settlement of bonds, receipt of bond proceeds
Public Sector Advisors 14 la Springsted
Thank you for the opportunity to assist you with this very
important project.
Public Sector Advisors 15 Springsted