HomeMy WebLinkAbout2014-001 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 14-01
VARIANCE FROM SHORELAND OVERLAY DISTRICT FOR
MARSHAN MEADOWS SECOND ADDITION
WHEREAS, a request has been submitted to the City for the approval of a variance from the
Shoreland Overlay District for Marshan Meadows Second Addition, said property legally
described to -wit:
Lot 2, Block 1, Marshan Meadows Second Addition; and
WHEREAS, the Shoreland Overlay District references a front setback of 30 feet which was
consistent with the underlying zoning district; however, when the R-2 zoning ordinance was
amended in 2012 to 25 feet, the Shoreland Overlay District was not properly amended to reflect
the change in the front setback, and
WHEREAS, review and approvals of variances are governed by state statutes and City
ordinances, and
WHEREAS, the Lino Lakes City Council makes the following Findings of Fact:
a. The variance shall be in harmony with the general purposes and intent of the ordinance.
The intent of the Shoreland Overlay District in regards to structural setbacks from public street
right of way is to be consistent with the underlying zoning ordinance. The variance would allow
a 25 foot setback from the public street right of way which is consistent with the R-2, Two Family
zoning district.
b. The variance shall be consistent with the comprehensive plan.
The variance is consistent with the comprehensive plan. The land is guided for Low Density
Sewered Residential development and single family homes are allowed.
c. There shall be practical difficulties in complying with the ordinance. "Practical difficulties," as
used in connection with the granting of a variance, means that the property owner proposes to
use the property in a reasonable manner not permitted by the ordinance. Economic
considerations alone do not constitute practical difficulties. Practical difficulties include, but are
not limited to, inadequate access to direct sunlight for solar energy systems.
The property owner proposes to use the property in a reasonable manner not permitted by the
ordinance. The construction of a single family home in a residential neighborhood is using the
property in a reasonable manner. The practical difficulty of the Shoreland Overlay District 30
foot front setback requirement is not consistent with the underlying R-2, Two Family Residential
Zoning District 25 foot front setback requirement.
1
d. The plight of the landowner shall be due to circumstances unique to the property not created
by the landowner.
The plight of the landowner is due to circumstances unique to the property not created by the
landowner. The Shoreland Overlay District ordinance should have been amended when the
Zoning Ordinance was amended in 2012 to reflect setback consistency with the underlying
zoning district.
e. The variance shall not alter the essential character of the locality.
The variance shall not alter the essential character of the locality. The construction of a single
family home in a residential neighborhood is consistent with the essential character of the
locality. The R-2 Two Family District allows for a 25 foot front setback.
f. A variance shall not be granted for any use that is not allowed under the ordinance for property
in the zoning district where the subject site is located.
Single family homes are permitted uses in the R-2, Two Family zoning district.
g. In accordance with MN Stat. 462.357, Subp. 6, variances shall be granted for earth sheltered
construction as defined in MN Stat. 216C.06, Subd. 14, when in harmony with the zoning
ordinance
Not applicable.
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes
hereby approves a variance from the Shoreland Overlay District for Marshan Meadows Second
Addition, subject to the following conditions:
1. The Variance Resolution, Final Plat and Development Contract shall be recorded with
Anoka County.
2. A building permit for construction of a single family home shall be submitted and
approved by the City.
3. A grading and drainage plan shall be submitted to the City Engineer and Rice Creek
Watershed District for review and approval.
Adopted by the Council of the City of Lino Lakes this 2 7 day of Jan , 2014.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Stoesz and was duly seconded by Council Member Kusterman and upon
vote being taken thereon, the following voted in favor thereof:
Stoesz, Kusterman, Rafferty, Roeser, Reinert
The following voted against same:
none
2
Jeff Rei e ayor
ATTEST:
CITY COUNCIL
AGENDA ITEM 6A
STAFF ORIGINATOR: Katie Larsen, City Planner
MEETING DATE: January 27, 2014
TOPIC: Marshan Meadows Second Addition
i. Consider Resolution No. 14-01 Approving Variance from
Shoreland Overlay District
ii. Consider Resolution No. 14-02 Approving the Preliminary
and Final Plat for Marshan Meadows Second Addition
iii. Consider Resolution No. 14-03 Approving Development
Agreement, Marshan Meadows Second Addition
VOTE REQUIRED: 3/5
L-- INTRODUCTION
Staff is requesting City Council consideration of a Variance, Preliminary & Final Plat and
Development Agreement as they relate to Marshan Meadows Second Addition.
Complete Application Date:
November 15, 2013
60 -Day Review Deadline:
January 11, 2014
120 -Day Review Deadline:
March 12, 2014
Environmental Board Meeting:
None
Park Board Meeting:
None
Planning & Zoning Board Meeting:
December 11, 2013
City Council Meeting:
January 27, 2014
BACKGROUND
The applicant has submitted a Land Use Application for preliminary and final plat for Marshan
Meadows Second Addition. This a two (2) lot residential subdivision located at 7332
Stagecoach Trail (Lot 1, Block 1, Marshan Meadows).
1
Marshan Meadows is a residential subdivision platted in 2006. A preliminary and final plat for
Marshan Meadows Second Addition proposing to subdivide the same Lot 1, Block 1, Marshan
Meadows into two (2) residential lots was submitted in 2007 by Bruggeman Properties. The City
Council approved the preliminary plat (Resolution No. 08-07) and final plat (Resolution No. 08-
08); however, the final plat was not recorded and has since expired.
The residential home on Lot 1, Block 1, Marshan Meadows (7332 Stagecoach Trail) was
constructed in 2010. With approval of this new plat, the existing home will become Lot 1, Block
1, Marshan Meadows Second Addition and Lot 2, Block 1, Marshan Meadows Second Addition
will be sold for the purpose of constructing a single family home.
The following staff report is based on the Plan Set dated December 13, 2013 prepared by EG
Rud & Sons, Inc.
Proposed Marshan Meadows Second Addition
Lot 1, Block 1
97,349 s.f.
31,469 s.f.
39,819 s.f.
Lot 2, Block 1
67,888 s.f.
20,116 s.f.
27,400 s.f.
*Upland is equivalent to buildable land as defined by the City Ordinance.
Zoning and Land Use
R-2, Two Family Residential
Shoreland Overlay District
Floodplain
Wetlands
Residential
Low Density Sewered Residential
(1.6 to 3.9 units per acre)
lA = 2008-2015
Flat with saturated deciduous
shrubland and wetlands
Conformity with the Comprehensive Plan and Zoning Code
The preliminary plat and final plat have been reviewed for compliance with the comprehensive
plan, zoning and subdivision ordinance The subdivision is not considered premature, is
consistent with the comprehensive plan and meets the performance standards of the subdivision
and zoning ordinance.
2
Public Land Dedication
The City will require payment in lieu of land dedication for purposes of public land dedication.
Since park dedication fees were paid for the existing lot at the time Marshan Meadows was
platted, fees will only be required for the newly created lot (Lot 2).
1 lot x $2,500 payment in lieu =
TOTAL $2,500
Landscaping
One (1) boulevard tree shall be required on Lot 2, Block 1.
Shoreland Management Overlay District
Land located within 1,000 feet from the ordinary high water level of a public water is subject to
the Shoreland Management Overlay District. The proposed subdivision abuts Marshan Lake
which is classified as a Natural Environment Lake.
The Shoreland Overlay District regulates lot area, lot width and impervious surface. The
proposed subdivision meets those criteria. The Shoreland Overlay also regulates structure
setbacks. A 150 foot setback from the ordinary high water level (OHWL) is required for all
principal and accessory structures. This includes decks, patios and sheds. This setback extends
into Lot 2 which limits the buildable area of that lot.
It is also important to note the permitted front setback in the R-2, Two Family Residential
District is 25 feet. The zoning ordinance was amended in 2012 (Ord. 03-12) which decreased the
front setback from 30 feet to 25 feet.
Variance
The Shoreland Overlay District references a front setback of 30 feet which was consistent with
the underlying zoning district; however, when the R-2 zoning ordinance was amended in 2012 to
25 feet, the Shoreland Overlay District was not amended to reflect the change in the front
setback. A variance is required from the Shoreland Overlay District to correct the oversight.
Criteria and Findings of Fact. No variance shall be granted unless it meets all the criteria of
Section 2, Subd. 4.A.1.(a-g). The City shall make findings regarding compliance with these
criteria.
a. The variance shall be in harmony with the general purposes and intent of the ordinance.
The intent of the Shoreland Overlay District in regards to structural setbacks from public street
right of way is to be consistent with the underlying zoning ordinance. The variance would allow
a 25 foot setback from the public street right of way which is consistent with the R-2, Two Family
zoning district.
3
b. The variance shall be consistent with the comprehensive plan.
The variance is consistent with the comprehensive plan. The land is guided for Low Density
Sewered Residential development and single family homes are allowed.
c. There shall be practical difficulties in complying with the ordinance. "Practical difficulties," as
used in connection with the granting of a variance, means that the property owner proposes to
use the property in a reasonable manner not permitted by the ordinance. Economic
considerations alone do not constitute practical difficulties. Practical difficulties include, but are
not limited to, inadequate access to direct sunlight for solar energy systems.
The property owner proposes to use the property in a reasonable manner not permitted by the
ordinance. The construction of a single family home in a residential neighborhood is using the
property in a reasonable manner. The practical difficulty of the Shoreland Overlay District 30
foot front setback requirement is not consistent with the underlying R-2, Two Family Residential
Zoning District 25 foot front setback requirement.
d. The plight of the landowner shall be due to circumstances unique to the property not created
by the landowner.
The plight of the landowner is due to circumstances unique to the property not created by the
landowner. The Shoreland Overlay District ordinance should have been amended when the
Zoning Ordinance was amended in 2012 to reflect setback consistency with the underlying
zoning district.
e. The variance shall not alter the essential character of the locality.
The variance shall not alter the essential character of the locality. The construction of a single
family home in a residential neighborhood is consistent with the essential character of the
locality. The R-2 Two Family District allows for a 25 foot front setback.
f. A variance shall not be granted for any use that is not allowed under the ordinance for property
in the zoning district where the subject site is located.
Single family homes are permitted uses in the R-2, Two Family zoning district.
g. In accordance with MN Stat. 462.357, Subp. 6, variances shall be granted for earth sheltered
construction as defined in MN Stat. 216C.06, Subd. 14, when in harmony with the zoning
ordinance.
Not applicable.
4
Development Contract
The City's subdivision ordinance and conditions of approval require the execution of a
development agreement between the Developer and the City of Lino Lakes. The City Engineer
has drafted the attached Development Contract.
RECOMMENDATION
The variance, preliminary plat and final plat for Marshan Meadows Second Addition meet the
requirements of the comprehensive plan, subdivision and zoning ordinance and Shoreland
Overlay District. The Planning & Zoning Board held a public hearing on December 11, 2013 and
made recommendation to the City Council for approval.
Staff is recommending approval of the following items with conditions as listed per resolution:
1. Resolution No. 14-01 Approving Variance from Shoreland Overlay District
2. Resolution No. 14-02 Approving the Preliminary and Final Plat for Marshan Meadows
Second Addition
3. Resolution No. 14-03 Approving Development Agreement, Marshan Meadows Second
Addition
ATTACHMENTS
1. Resolution No. 14-01
2. Resolution No. 14-02
3. Preliminary Plat & Final Plat-Marshan Meadows Second Addition
4. Resolution No. 14-03
5. Development Contract
5