Loading...
HomeMy WebLinkAbout2014-054 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 14-54 AUTHORIZING PROFESSIONAL ENGINEERING SERVICES TO PREPARE AMENDMENT TO WELLHEAD PROTECTION PLAN - PART II WHEREAS, The City Council is required by the Minnesota Department of Health to prepare an amendment to the Wellhead Protection Plan; WHEREAS, The City has received a proposal from WSB & Associates, Inc. to prepare Part II of the required amendment to the Wellhead Protection Plan; NOW, THEREFORE BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes, Minnesota, that an amendment to the City's Wellhead Protection Plan - Part II is authorized to be performed by WSB & Associates, Inc at a cost of $19,499. Adopted by the Council of the City of Lino Lakes this 9th day of June, 2014. The motion for the adoption of the foregoing resolution was introduced by Council Member Roeser and was duly seconded by Council Member Rafferty and upon vote being taken thereon, the following voted in favor thereof: Roeser, Rafferty, Reinert The following voted against same: none (Absent - Stoesz, Kusterman) Jeff Reine ' , ay e r ATTEST: CITY COUNCIL AGENDA ITEM 6B STAFF ORIGINATOR: Michael Grochala MEETING DATE: June 9, 2014 TOPIC: Consider Resolution No. 14-54, Authorizing Professional Services to Prepare Amendment to Wellhead Protection Plan VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting City Council approval to authorize WSB and Associates to prepare the Wellhead Protection Plan Part II Amendment. BACKGROUND In accordance with state law the City is required to amend its Wellhead Protection Plan. The goal of the plan amendment is to prevent human -caused contaminants from entering the water supply wells and to protect all who use the water supply from adverse health effects associated with groundwater contamination. The amendment is broken down into Part I and Part II. Part I was authorized by the City Council in December of 2012 and included the following items: • Delineations of the Wellhead Protection Area (WHPA) • Delineations of the Drinking Water Supply Management Area (DWSMA) • Well and aquifer vulnerability assessments The Part I study has been completed and staff is preparing to initiate the Part II component of the amendment. Part II is required to be completed by March 10, 2015. WSB has submitted a proposal to complete the Part II amendment in the amount of $19,499. Funding for the plan amendment is proposed to come from the City's Trunk Utility Fund. RECOMMENDATION Staff is recommending that the City Council adopt Resolution 14-54 authorizing WSB & Associates, Inc. to provide professional engineering services for the Wellhead Protection Plan Amendment Part II. ATTACHMENTS 1. Proposal from WSB & Associates, Inc. dated May 23, 2014. WSB ASEN MEM ASCOCItIteS, Inr engineering • planning • environmental. construction May 23, 2014 Michael Grochala Community Development Director City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 Re: Proposal to Provide Professional Engineering Services for the Wellhead Protection Plan Part 2 Amendment City of Lino Lakes, MN Dear Mr. Grochala: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 WSB & Associates, Inc. (WSB) is pleased to present this proposal to the City of Lino Lakes (City) to provide professional engineering services as they relate to the City's Wellhead Protection Plan (WHPP) Part 2 Amendment. The preparation of the City's WHPP is a requirement of Minnesota Rules 4720.5100 to 4720.5590. WSB's overall goal is to help Lino Lakes compose a source water protection plan that is both useful to the City and meets the requirements of MN Rules as interpreted by the Minnesota Department of Health (MDH). Specific objectives include: • Meet the required parameters as outlined in MDH Part 2 scoping letter, specifically to complete an inventory of the pertinent potential contaminant sources within the approved Drinking Water Source Management Area (DWSMA) and develop a management plan to address potential contaminant sources and associated reporting requirements. ■ Develop Source Water Protection Plan that is useful to Lino Lakes, and not merely the completion of a mandated task The goal of the WHPP is to prevent human -caused contaminants from entering the water supply wells and to protect all who use the water supply from adverse health effects associated with groundwater contamination. A meeting was held with the MDH for the development of Part 2 of the WHPP. At that meeting the MDH introduced the contact persons and discussed requirements to complete the WHPP. The City has until March 10. 2015 to complete Part 2 of the WHPP. Project Approach/Scope of Services Part 2 of a WHPP describes how the results of the Part 1 can be applied to best protect a community's water supply. A successful Part 2 WHPP process is developed through integration and comprehensive analysis of a variety of different types of data. There are four data elements that make up a WHPP — Physical Environment, Land Use, Water Quantity, and Water Quality. All of these can be explained in terms of air, earth, and water. In the perspective of a St. Cloud • Minneapolis • St. Paul Equal Opportunity Employer wsbeng.com K 1020 9-130,AdmmtDocs{Pw t 2ILTR PROP-Lmn Lakes-ff f1PP: 05 23 J4.doc May 23, 2014 Page 2 WHPP, air is climate which determines both water use and aquifer recharge. Earth is a combination of rock, sediment, and soil. Each of these affects Lino Lakes' water supply, either by storing and transmitting the water as an aquifer or by inhibiting flow as a confining layer. Part 1 of the WHPP addressed this subject. Earth is important in a WHPP as it determines how much water is available, where it comes from and how vulnerable groundwater is to contamination from the surface. Finally, Water is the reason for this whole process. The WHPP addresses supply sustainability, mid -scale demand trends, potential quality issues, and comprehensive risk mitigation measures. Part 2 addresses water by combining the Air and Earth subjects (above) with land use, taking inventory of potential contamination sites, surface waters, and evaluating available water supplies in terms of quantity and quality. Once the above data elements are collected and interpreted, impacts of changes in land and water use can be assessed. This will allow issues, problems, and opportunities to be identified and included in the WHPP. Among the issues and problems is a Potential Contaminant Source Inventory (PCSI), which is explicitly identified by the MDH. Another item that the MDH calls out as a separate item is identifying an alternate water supply as part of a Water Emergency and Conservation Plan. This is actually both an issue and opportunity that the Part 2 WHPP will address. Other issues and opportunities that may be included in this WHPP are changes in zoning or land use, well rehabilitation, possible cooperation/collaboration with other water producers, and conflicts with surface water management. Since the Part 2 WHPP establishes action items, there must be a way to measure the effectiveness of these items. Each action item will include a description of how the item will be analyzed and the results fed back to keep the goal relevant. Doing this makes the plan dynamic and more valuable in the long run. A report will be prepared to satisfy the IvIDH reporting requirements for Part 2 of the WHPP. The report and associated GIS files will be delivered in an electronic format on compact disks, per MDH scoping decision. Two CD copies of the draft report and two of the final report will be presented to the City. The Wellhead Protection Rules require that the results of Part 2 of the WHPP to be presented to the public at a public hearing. This proposal includes presenting the results of this work at one public hearing. Work Plan To complete the Part 2 WHPP, we propose to complete the following tasks: Task 1— Data Elements & Assessments During this phase, we will compile the data necessary to complete the WHPP. This includes all of the required elements of the Plan as identified by the MDH in addition to reviewing the WHPP Part 1. During this phase, land use/zoning, and potential contaminant source maps will be completed. Data tables and existing maps will be assembled to complete MDH requirements. The following elements need to be completed: • Physical Environment • Land Use • Water Quantity • Water Quality Task 2 Impact of Changes to Public Water Supply Wells The purpose of this task is to determine whether new potential sources of contamination may be introduced in the future and to identify future actions for addressing these anticipated sources. Expected changes to the physical environment, land use, or ground water will be described that may impact the aquifers serving the City's municipal wells. Kr1070. -/30Ad nDocsTart 25.77?PROP-Lim Lakes-07fPP2 05 23 iJ.dx May 23, 2014 Page 3 Task 3 —Identify Issues Problems & Opportunities The purpose of this task is to define the nature and magnitude of contaminant source management issues within the DWSMA. This task includes obtaining PCSI data from the State and County and compiling the data and conducting preliminary location verification. In addition, this task includes describing the water and land use issues and problems and opportunities related to the aquifers serving the water supply wells and the DWSMA. Task 4 — Develop Goals, Objectives, Plan & Evaluation This task consists of establishing goals for present and future water and land use to provide a framework for determining plan objectives and related action items. In addition, observations will be made about vulnerability and mitigation within multiple contexts, such as City plans/budget and MDH requirements, to determine the source water protection measures best suited for Lino Lakes. These measures will then be reviewed and presented as an outline of action items which can be prioritized. Evaluation strategies will be devised to determine the effectiveness of the actions taken on each item. Task 5 — Letter Submittals WSB will submit the plan to the LGUs and the MDH. We will also notify the LGUs of plan approval and prepare the public hearing notice. Task 6 — Meetings During the course of this project, informal meetings will be held between WSB, the City, and possibly the MDH to provide progress updates to the City and MDH personnel. The meetings will be held at the City of Lino Lakes offices, with the option of conducting them via telephone. WSB will also attend meetings with MDH and conduct the required public hearing. The draft report will be updated to respond to comments made during the review process and by City and MDH staff. Proposed Fee WSB proposes to complete the above scope of services on an hourly basis in accordance with our 2014 billing rate schedule for an estimated fee of $19,499. Please refer to the attached spreadsheet for an estimate of hours by task. Schedule WSB can begin work immediately and can meet MDH's deadline. Completion of the final plan will require a 60 day review period followed by a public hearing before the plan can be submitted to MDH for their review and approval. MDH may accept a draft copy at the start of the 60 day review period. which accelerates the schedule and may provide draft comments so that the final plan that is submitted is quickly approved. This represents our total understanding of the project and proposed scope of services. If you are in agreement with the scope of services, please have the City block of this letter signed and return a copy to WSB. Our receipt of an executed copy will be WSB's authorization to proceed. Should the City request additional services outside of the above scope of services, we will work with you to establish a revised scope and fee. Please contact me at your convenience 763-287-8520 if you have any questions or concerns relating to this proposal as presented. We appreciate the opportunity to assist you and your staff with completion of the Wellhead Protection Plan Part 2. A:102029 430.4MtiniDneslPart 231.71? PROP -Lino Lakes -OWN'? 05 23 13.drx May 23, 2014 Page 4 Sincerely, WSB & Associates, Inc. Jason Wedel, PE City Engineer Enclosure ACCEPTED BY: City of Lino Lakes Name Title Date A:102029-130Adnln'1kuNart "ZTR PROP -Lino Lakes417IPP. 05 23 14.d Estimate of Cost WSBProfessional of Lino Lakes, Minnesota Professional Services to Complete Wellhead Protection Plan Update Part 2 ti Total Labor Cost 0 4 N r•-•0 EA $ 830.00 1 $ 1,132.00 1 0 0 WcD fA $ 784.00 $ 4,440.001 0 0 CO 69 0 0 (34 MCOD 63 o 0 D) a) eR 0 0 CO ED in 49 $ 566.00 1 1 $ 255.00 1 $ 168.00 0 0 1� COCD iH 0 0 1,-1. to 0 0 <D ) fA 0 0 N 0 E9 $ 468.00 $ 468.00 $ 234.00 0 0 D) O) '7 FA Estimated Hours Tti N O p r= m o N m CO .N— CO CO M N r .— N CS'V N a A M 0 $ 243.00 GIS Specialist Bryan Pittman 0 0 CO v9 0 0 e» Geologist c o m n m Tr 0 aa ° 69 0 co rn s» "o".. a Breanne Rothstein I 32 N .):- rn $ 4,116.00 Project Manager Leslee Storlie 24 87.00 $ 5,742.00 Principal Jason Wedel r` $ 147.00 $ 1,029.00 Description 1Data Collection Complete Maps and Required Data Tables 1Response to Impact of Changes Obtain Potential Contaminant Source Data from State/County Compile Data Conduct Preliminary Location Verification Identify Other Issues Problems & Opportunities 'Prepare Report on Findings and Recommendations 1 t 0 c Consider Comments by LGUs 1 Consider Comments by MDH 'Submit Pian to LGUs Public Hearing Notice Submit Plan to MDH Notice to LGUs of Plan Approval o+ c 'Ti). m 2 N o) C o m in Internal Coordination Draft Review with MDH Planner Draft Review with City Public Hearing and Review 'Total Hours Hourly Billing Rate Total WSB Direct Labor Costs u) N co z r N r ' r N r e+i N epi el ri V ri a N V M R a r vi N mi eh La R 6 r tG N W r) eD V eD N ca Ing\Pert 21WHPP Pad 2 Budget W M:1 W alar W eslewelerl W ellhead Proledio