Loading...
HomeMy WebLinkAbout2014-131 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 14-131 RESOLUTION APPROVING COMPREHENSIVE PLAN AMENDMENTS TO CHAPTER 3: LAND USE PLAN AND CHAPTER 7: SANITARY SEWER PLAN, BIRCH STREET AND CENTERVILLE ROAD WHEREAS, the City of Lino Lakes is proposing to amend the City's 2030 Comprehensive Plan to allow for the potential future development of a fire station and other community facilities including a recreation complex; and WHEREAS, pursuant to Minnesota State Statute 473, the City must allow adjacent governments, affected special districts, and affected school districts up to 60 days to review the comprehensive plan amendment; and WHEREAS, the City Council may waive the adjacent review and comment period for a minor plan amendment if all of the following are met: 1. The amendment involves a site of 40 acres or less; 2. The amendment does not change the community's growth forecasts for 2010-2030 or the TAZ allocations; and 3. The amendment is either: a. More than one quarter (1/4) of a mile from an adjacent jurisdiction, or b. Beyond the distance or area which the community's adopted ordinances require notice to adjacent or affected property owners, whichever distance is less; and WHEREAS, the criteria for which the City Council may waive adjacent review and comment period for a minor plan amendment is met; and WHEREAS, in accordance with Minnesota State Statute 462.355, Subd. 2 the City must hold one public hearing before the planning agency; and WHEREAS, the Planning Commission held a public hearing on October 8, 2014 and recommended the City Council approve and adopt the amendments to the City's 2030 Comprehensive Plan and authorize the distribution to the Metropolitan Council for review and approval; and WHEREAS, the City Council reviewed and considered the reports, documents, testimony, and other materials presented; and NOW, THEREFORE BE IT RESOLVED by the City Council of The City of Lino Lakes hereby approves the following amendments to Chapter 3, Land Use Plan: 1. Re -guide the property located at PID: 26-31-22-31-0004, P1D: 26-31-22-31-0003, and a portion of PID: 26-31-22-33-0002 from Park/Open Space to Civic/Institutional land use. 2. Page 3-12 — Figure 3-2: Full Build Out Future Land Use Map has been modified to show the proposed land use change for the identified parcels from Park/Open Space to Civic/Institutional. 3. Page 3-13 — Figure 3-3: 2030 Future Land Use Map has been modified to show the 1 proposed land use change for the identified parcels from Park/Open Space to Civic/Institutional. 4. Page 3-14 — Table 3-3: 2030 Future Land Use Acreages has been updated to reflect the reduction in Gross Acres of Park & Open Space by 28 acres, and an addition in Gross Acres of Civic/Institutional by 28 acres. 5. Page 3-19 — Parks and Open Space will be modified to reflect the updated gross acres of Park and Open Space to 3,425 acres, or 16.1 % of the city's total land area, and the gross acreage of Civic/Institution to 496 acres, or 2.3%; and BE IT FURTHER RESOLVED by the City Council of The City of Lino Lakes hereby approves the following amendments to Chapter 7, Sanitary Sewer Plan: 1. Provide sanitary sewer service from District No. 1 as opposed to District No. 4 as currently guided subject to review and approval by the Metropolitan Council as required by Minnesota Statute 473.858. 2. Page 7-4 — Figure 7-2: Sanitary Sewer District Map has been modified to reallocate the identified parcels in Sanitary Sewer District 1F instead of 4B. 3. Page 7-6 — Figure 7-3: Future Sanitary Sewer System with Full Build out Future Land Use Map has been modified to show the identified parcels reflecting a Public/Semi- Public land use as opposed to Park & Open Space. 4. Page 7-9 — Forecasts by Sewer Districts: Sewer District 1, first paragraph, last sentence has been modified as follows: a. There are about 779 developable acres in District 1 currently designated as low density sewered residential, 82 acres designated as medium density residential, 21 acres designated as mixed use -residential, 12 acres designated mixed use - commercial, 7 acres designated commercial, and 28 acres designated Civic/Institutional. 5. Page 7-10 — Forecasts by Sewer Districts: Sewer District 1, Last paragraph, last sentence has been added as follows: a. Approximately 39 acres of low density residential will probably not be developed by 2030. 6. Page 7-10 — Forecasts by Sewer Districts: Sewer District 4, first paragraph, fourth sentence has been modified as follows: a. District 4 contains approximately 558 developable acres designated as low density residential, 48 acres medium density, 9 acres high density, and 20 acres mixed use residential. 7. Page 7-13 — Table 7-3: Summary of Projected Flows — 2015 has been modified to include the reallocated Civic/Institutional sanitary sewer flows in Sub -District 1F as follows: Sub -Dist. Average Daily Flow Peaking Factor Peak Flow Residential Non- Residential Total 1F 0.114 0.006 0.120 3.900 0.468 Sub -Total 0.652 0.012 0.664 3.300 2.191 Total 6.733 2 8. Page 7-14 - Table 7-4: Summary of Projected Flows - 2020 has been modified to include the reallocated Civic/Institutional sanitary sewer flows in Sub -District 1F as follows: Sub -Dist. Averagee Daily Flow Peaking Factor Peak Flow Residential Non- Residential Total 1F 0.114 0.010 0.124 3.900 0.484 Sub -Total 0.652 0.016 0.668 3.300 2.204 Total 0.090 0.000 0.090 4.000 7.412 9. Page 7-15 - Table 7-5: Summary of Projected Flows - 2025 has been modified to include the reallocated Civic/Institutional sanitary sewer flows in Sub -District 1F as follows: Sub -Dist. Average Daily Flow Peaking Factor Peak Flow Residential Non- Residential Total 1F 0.128 0.010 0.138 3.900 0.538 Sub -Total 0.709 0.016 0.725 3.300 2.393 Total 0.090 0.000 0.090 4.000 8.466 10. Page 7-16 - Table 7-6: Summary of Projected Flows - 2030 has been modified to include the reallocated Civic/Institutional sanitary sewer flows in Sub -District 1F as follows: Sub -Dist. Average Daily Flow Peaking Factor Peak Flow Residential Non- Residential Total IF 0.128 0.010 0.138 3.900 0.538 Sub -Total 0.732 0.016 0.748 3.300 2.468 Total 0.090 0.000 0.090 4.000 9.117 11. Page 7-17 - Table 7-7: Summary of Projected Flows - Ultimate Development has been modified to include the reallocated Civic/Institutional and Low Density Residential sanitary sewer flows in Sub -District 1F as follows: Sub -Dist. Average Daily Flow Peaking Factor Peak Flow Residential Non- Residential Total 1F 0.204 0.010 0.214 3.800 0.813 Sub -Total 1.286 0.040 1.326 3.000 3.978 4B 0.090 0.000 0.090 4.000 0.360 Sub -Total 0.420 0.012 0.432 3.500 1.512 Total 20.704 3 12. Page 7-22 — Table 7-9: Capacity Analysis — Existing Sewer System — District 1 has been modified as follows: Facility Name/Location Service Area (Sub- Districts) Future Flow Existing Capacity (MGD) Remarks Avg. (MGD) Peak Factor Peak (MGD) Lift Station #5 (Pumps to LS 1) 1F 0.214 3.800 0.813 0.432 May Require Upgrade, See Note 2 Lift Station #1 1D, 1F, & 1 G 0.495 3.400 1.683 1.267 May Require Upgrade, See Note 2 12" Trunk Sewer, Country Lakes Drive 1D, 1F, 1G & about 70 homes in 1B 0.514 3.400 1.748 1.080 May Require Upgrade, See Note 2 21" Trunk Sewer at Lift Station L69 1B, 1D, 1F, 1G, & 1H 0.937 3.200 2.998 3.240 Adequate Capacity MCES Lift Station L69 All of District 1 1.326 3.000 3.978 3.970 At Capacity; See Note 2 13. Page 7-24 — Existing Sanitary Sewer System Capacity Analysis: Sewer District 1, first paragraph, second sentence has been revised to the following: a. The current capacity of Lift Station L69 is 3.97 MGD which is equal to the projected ultimate flow of 3.97 MGD. 14. Page 7-25 — Existing Sanitary Sewer System Capacity Analysis: Sewer District 4, first paragraph, sixth sentence has been revised to the following: a. The capacity available to Lino Lakes in the White Bear Township sewer is approximately 2.33 MGD, which exceeds the projected ultimate flow of 1.512 MGD from District 4. 15. Page 7-30 — Figure 7-5: Future Sanitary Sewer System with Utility Staging Map has been modified to show the identified parcels from Planned Service Area (Post 2030) to Planned Service Area (2010-2020). 16. Page 7-31 — Figure 7-6: Future Trunk Sanitary Sewer System has been modified to show the identified parcels from Sanitary Sewer District 4B to 1F. BE IT FURTHER RESOLVED, the adoption of the amendments to the City's Comprehensive Plan is subject to review and approval by the Metropolitan Council. Adopted by the Council of the City of Lino Lakes this 10th day of November, 2014. 4 The motion for the adoption of the foregoing resolution was introduced by Council Member Kusterman and was duly seconded by Council Member Roeser and upon vote being taken thereon, the followin voted in favor thereof: Kusterman, Roeser, Rafferty,gStoesz, Reinert The following voted against same: none ATTEST: Julia e Bartell, Cit Cler L., IE Figure 3-2: Full Build Out Future Land Use Map • oo LL� • U • •• • • • • : Robinson Ot i mntutY Tt RONDEA(I SKF 80th S 1 • • • IW •z :m Ic .N Io Lois La GEORGE WATCH LAKE PELT IE R LAKE Apollo Dr Elm St 1 1 • • 1 !3M WWrfd 1AKF r.._.. • • • • •• • • County Rd J MARSHAN LAKE • • • • • • • • • CENTER VI.LE LAKE RICE LAKE RESHANAU LAKE % av,xsom Rd 62nd St CEDAR LAKE Woodridge Cd Ash St OTTER LAKE Full Build Out Future Land Use Map City of Lino Lakes 2030 Comprehensive Plan I. • Municipal Boundary - Industrial Permanent Rural I. Civic/Institutional Low Density Sewered Residential Manufactured Home Park Medium Density Residential Park & Open Space High Density Residential Private Airfield 4,000 0 4,000 Commercial Right -of -Way Mixed Use Open Water Feet CIT OF LNO1 KES • • • • Sept 26, 2014 Prepared By: WSB & Associates K:tO2029-8001GI StM epstFig3-2_FutureLandUceMap.mxd Figure 3-3: 2030 Future Land Use Map • 8 • • • c • o • U : Robinson Ot" 1 mnturd Tr : IW -z I= •N 1 Apollo Dr 0. c ■ RC)NDEAI: LAKE Lilac St GEORGE WATCH LAKE Elm St MARs=tArti 1 AKE PEL1IER AKF 1 1 • • L••_••_.•_••_••_•.I •••7 • m m ; • 80th St E • 1 1 CENTERVILLF LAKE i City of Centerville i a 1 • w ••_. RICE LAKE 1••_••_• � RESHANAU e�' • u 1 LAKE • �I.._••_•._••_•! I m 0- G m 1 Birch St 2 1• • �� • g 1 m 1 ■i -- r "•• 1IMI L7WIPd P . • '•._•i a HawtNsom Rd 1 Qt rLa 1• X• . o �m CO a Q • 5 1 re !o r • I f e, . m 62nd St G CEDAR AMELIA ^' 1 3 ^ _.._ LAKE LAKE : Woodridge 1 I 1 • • ?a Ash St - OTTER 1 • ' LAKE •▪ ••_•••••._••_••_•••._••••••_••r:iirtty•RdJ_••••_••_••_••_••••_••_•._••••_.••.•••._••_•••.••••r 2030 Future Land Use Map City of Lino Lakes 2030 Comprehensive Plan I: Municipal Boundary _ Industrial Permanent Rural _ Civic/Institutional Urban Reserve _ Manufactured Home Park Low Density Sewered Residential Park & Open Space Medium Density Residential Private Airfield N High Density Residential Right -of -Way 4,000 0 4,000 Commercial Open Water liNMI Feet Mixed Use C 1 T OF LINOL KES Sept 26, 2014 Prepared By: WSB & Associates K:02029-800\GIS1Maps\Fig3-3_2030FutureLandU•eMap. m xd Figure 3-4: Utility Staging Map II: IA Nam l• II 1 1 f mil ! 1 • • 1 1 toy 1 1 1 1- -I c1 i 1 1 ..r_7 1 1 I IJ 1 1 L_�- 1_I .••ri ;L + Ke%St I_ ; +,� 1 Lois La �� ' 0.• 1 80th St E Robinson Or d • 1 �_r� 35W d mntUd Tt ��$ ° • 1 "-moi ��" � � � 1 �1 m 1 1 mi, I = a i • r Lilac St . 1 1 I IW i t GEORGE ,"r 1 IQ I Ce WATCH 1 1 I Im I I 1 tAKE `1 1 1 o 1 1 1 Apollo Dr i I 1 O. ) IElm St v �r.................1 RiceSr fee1 '" ChaimofTakescENTERvn LE 1 ::,� . ftp _ 9 16 RegionallPark Reserve LAKE : City of a Centerville j Ha\yJ`orn Rd 1. ca 6 a o tx <y 1 t 1 62nd St 1 1 O rL1t:Li1__ • O� �oriL J 1 ' ♦ '__1 t4li __-11 r A� 1 mi 1 1 G�Fr �► a �.-1aa lAxF AAKIL F �! F � � ��.'.NI AKF 1 1 ` °#"1 r.sm::.,.„$ %,.rre 1 S j 1 1 ` / IAKF II 1 S.mi i s" 1 ....•�.•./a. an..e naa awns.wJ• i J r� County Rd J Utility Staging Map City of Lino Lakes 2030 Comprehensive Plan in in1 Stage 1A Planned Service Area (2008 - 2015) I • . • Municipal Boundary 4.. Stage 1B Planned Service Area (2015 - 2020) 1 Stage 2A Planned Service Area (2020 - 2025) Stage 2B Planned Service Area (2025 - 2030) N 1 Stage 3 Planned Service Area (Post 2030) - ` No Service Area 4,000 0 4,000 Feet MCES Interceptors Regional Park Reserve NW Wetlands Waterbodies Right -of -Way CI T 0 F KES Sept 26, 2014 Prepared By: WSB & Associates K'\02029-800\GI S\M aps\Fig3-4_UtilityStaging. mxd Figure 7-2: Sanitary Sewer District Map 1 2J 21 Robinson Dc ',dud Tt r•1 w IS 2E Lilac St Apollo Dr 2F Elm St 2A 2B Ke/13t Lois La 2C RONDEAU LAKE GEORGE WA TCN hE _..1=.._l._.._.1 MOUND TRAIL INTERCONNECTION WITH CENTERVILLE CENTERVILLE LAKE i• City of Q LAMOTTE DRIVE :Centerville N SUNSET AVE INTERCONNECTION INTERCONNECTION WITH CENTERVILLE ir —1 WITH BLAINE PEELTIER LAKE 5B 5C 90th St E 3B 2H RICE i BALDWIN ;AKE ' • .. _•111• •• LAKE H • neva 5A Otter Lake Rd 1F Birch St HaMnr`om Rd N 1B fp 62nd St G 3A 0 U U e� La COUNTY'ROAD J 1E INTERCONNECTION WITH SHOREVIEW County Rd J Sanitary Sewer District Map City of Lino Lakes 2030 Comprehensive Plan N 4,000 0 4,000 Feet =Sanitary Sewer Districts =Sanitary Sewer Sub -Districts Not In Ultimate Service Area CITY OF LINO_ KES Sept 26, 2014 Prepared By: WSB & Associates K. \02029-800\GI S\M aps\Fig7-2_S a n its rySewer D istn GM a p. m x tl Figure 7-3: Future Sanitary Sewer System with Full Build Out Future Land Use Map t_••_••_••_••_••_••_••••_••_••_••_••:••_••_••_.._•• 1 • ■ 5■ I0 • •■ ■ ■ • e -i 7 ■ ■ . 11•1111 II ■ ■ II Alm .... .. iii ■ IRobinson Tq. 1 ■ ■ 1 ■ ■ i' • ■ Iw ■ z or!. •m■ !i. • .co • AApollo Dr • I Elm St 1 ■ ■ I ■ ■ l o■ 81 /•\ • 1 • ♦ ••••I Kepi St Lois La ■ ■ ■ ■ ■ ■ I 1 • � ■ ■ 80th St LS*11 Lilac St z • GEORGE WATCH LAKE PELF/ER LAKE L\ MARSHAN LAKE N LS# 4 MOUND TRAIL ■ ■ • 1 ■ ■ 1 ■ ■ • • ■ MCES LINO LAKES RELIEF INTERCEPTOR I INTERCONNECTION • WITH CENTERVILLE CENTERVILLE LAKE is SUNSET AVE INTERCONNECTION WITH BLAINE S# 2 RICE LAKE LAMOTTE DRIVE INTERCONNECTION WITH CENTERVILLE 1 RESHANAU MCES FORCEMAIN 83-61 •...•t/* • City of Centerville • 76-51 I rc i MCES INTERCEPTOR a I • c U• • • • L#51••••_••_••_4\ •• ■ ■ uI ■ •�• • f,Mi ;w7, jAKF • •_ •• a K O LS# 53e: rre - Woodridge MCES FORCEMAIN 91-06 COUNTY ROAD J INTERCONNECTION WITHpm=SHOREVIEW C� rity Rd J • �' CEDAR LAKE ■ ■ ■ di ■ •A -t. IF rur FUTURE INTERCONNECTION Future Sanitary Sewer System with Full Build Out Future Land Use Map City of Lino Lakes 2030 Comprehensive Plan 1 • • Municipal Boundary Permanent Rural N Low Density Sewered Residential Medium Density Residential High Density Residential 1.1 Commercial Mixed Use 4,000 0 4,000 Feet - Industrial Civic/Institutional Manufactured Home Park Park 8 Open Space Private Airfield Right -of -Way Open Water FUTURE SANITARY SEWER SYSTEM • to FORCEMAIN • • 1 GRAVITY EXISTING TRUNK SYSTEM •� • FORCEMAIN GRAVITY MCES INTERCEPTOR GRAVITY Sept 26, 2014 Prepared By: WSB & Associates K:52029-800\GIS\Maps\Fig7-3_FutureSanitaryFutureLandUseMap.mvd Figure 7-5: Future Sanitary Sewer System with Utility Staging Map M■ s.as...R....t^-. .aa •aa ..a. uauma P.R...aa ice• tta. w as. soma ss. r- ss Ppm. APO • E ■ . • II■ ■ IPII Ak1110 1 ■ o ■ • A i • U -r-r.11f10-*.r-•---'�� As---- 1 1• O. I`• o• 1 1 • • x q • m 1 1 1X -M-6-,11-11••-•-10-111 13. ■ I � ■ :Robinson O� ■ sigma, • ■ ■ ■ ■ ■ ■ ■ ■ 80th St E 111 Ke% Lois La LS#x,11 0"./` / St • tud Lilac St 1 : ■ II IZ• a) ■ jQ• It r 1 wa■ y 1 I= �■ If IFA Apollo Dr 1 I • i Elm St ,�LS#f6 ■ I ■ Q N r • a R 16■ M . *' LS# 4SUNSETA E INTERCONNECTION T J■ d WITH BLAINE a ` : I .LS :; RICE ▪ ■ . _ LAKE PE' HE GEORGE WATCH LAKE MARSHAN !AKE MOUND TRAIL INTERCONNECTION WITH CENTERVIL E 111•••=.••••1•1111111111•111111111 CENTERV2.LE. LAKE LAMOTTE DRIVE INTERCONNECTION - WITH CENTERVILLE" Kr� **-• :afi y# �� //(4/7 City of enterville !; 1 ya¢ a LS# 5 F•.-. WW1=• MEM •.. �'•\ it ' •=__ LS# 1 Birch St 8ALV v AJ � 4VF I � Wood riiiged I 1 �`� cd SLS#3 • Ir._. 0, I d =° • LS# 53 i Navvem Rd MCES - L69 �df it 82nd St r 1COUNTY'ROAD J INTERCONNECTION WITH SHOREyIEW .N. n Js = = = a 1 1 • 1 1 1 • p I 0 `y II= _ ■ ■ I ■ ( • S 1 • EVA , .AMELIA r AKE ■i�j'f r•• -A' or - I AKE tl ■ N a • an PIMP •:a. PALO aa..a... Future Sanitary Sewer System with Utility Staging Map City of Lino Lakes 2030 Comprehensive Plan Stage 1A Planned Service Area (2008 - 2015) Stage 1B Planned Service Area (2015 - 2020) - A Stage 2A Planned Service Area (2020 - 2025) 1 - Stage 3 Planned Service Area (Post 2030) Stage 2B Planned Service Area (2025 - 2030) 1 4 No Service Area 4,000 0 4,000 Feet limmeam 1•\ II ■ II i A 9 GJ a• DP FUTURE SANITARY SEWER SYSTEM • — FORCEMAIN ■ • I GRAVITY EXISTING TRUNK SYSTEM ••. • FORCEMAIN •z_ GRAVITY MCES INTERCEPTOR GRAVITY 0 Ot !cH 0 1 aKE 1a •1 i•a a I T Y'. 0 F LNOL KES Sept 26, 2014 Prepared By: WSB &Associates K:102029-800\GIS\Maps \Fig7-5 Future Sanitary SewerStaging.mxd Figure 7-6: Future Trunk Sanitary Sewer System /ei••_•._.._.•_•._•._.._•._r._.•_.•_••_••_.•_••_••_••_••_•._••_•a.••_•••..... • N ▪ 6 2J- U tLL ■■■■ cti • 10" ■ 1 1 12" 1 ▪ J lb. ■12"■Xl•1274i 2A.. 21 - Robinson Or ■ 10" '" 1 • t • i a' t 1 „;r: O•n tud LL' "•\ 2E{ Lilac St I▪ tu ▪ d IQ 1= •N: ■ a10" 4JFM 1 ■ vt 1 1 •• • • ■■12� St Lois La ■ ■ ■ ■ IV 2C• ■ 5C• ■ ■ ■ ■ ■ ■ ■■■ ■16•••tt• V^ k 1 el • 1 5• B• 1 GEORGE WATCH LAKE sl O i.a A-6"=FM-1 3B \Apollo Dr • , LL Elm St 2F °` CLS# 6 v • 1 a 2G N v 1 8 LS# 4 SUNSET AVE /INTERCONNECTION WITH BLAINE _••_•• r.••_••_•11 i LAMOTTE DRIVE INTERCONNECTION WITH CENTERVILLE CENTERVLLLE. LAKE i M 2H LS# 2 • 3F: 1 1 ■ ■ ■ MCESIL'INO:LAKES RELIEF INTERCEPTOR ■ City of entervi11e MCES FORCEMAIN 83-61 LS# 7 3A LS# 5 ■• ,.• F • LS# 53 1A Woodridge 0 s N f MCES - L69 c•, • 62nd St ! 1 �� 3 COUNTY ROAD J INTERCONNECTION MCES FORCEMAIN WITH SHOREVIEW 1 Couny Rd J sr -os •I®tr=t�t■6FRile ot•• B 1E Future Trunk Sanitary Sewer System City of Lino Lakes 2030 Comprehensive Plan LIFT STATIONS • LINO LAKES WITH STATION NUMBERS A MCES • NORTH OAKS ® FUTURE LINO LAKES LIFT STATION N 4,000 0 4,000 Feet 4 IFM EXISTING TRUNK SYSTEM • mo. FORCEMAIN 10" GRAVITY 12" GRAVITY ••. 15" GRAVITY 18" GRAVITY 21" GRAVITY ttttttttttt_ 24" GRAVITY • • 4E FUTURE'INTERCONNECTION WITH•WHI_TE„BEAR,T.OWNSHIPM�•_ FUTURE SANITARY SEWER SYSTEM • ttt_ FORCEMAIN ■ ■ GRAVITY MCES INTERCEPTOR GRAVITY -Sanitary Sewer Districts ¢ Sanitary Sewer Sub -Districts NOT IN ULTIMATE SERVICE AREA Prepared By: WSB & Associates CIT OF LNQL KES Sept 26, 2014 K:\02029-800\GIS\Maps\Fig7-6 FutureSanitarySewerStaging.mxd CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Kelsey Johnson, WSB & Associates, Inc. MEETING DATE: November 10, 2014 TOPIC: Consider Resolution No. 14-131, Approving Comprehensive Plan Amendments to Chapter 3: Land Use Plan and Chapter 7: Sanitary Sewer Plan, Birch Street and Centerville Road VOTE REQUIRED: 4/5 INTRODUCTION Staff is recommending amendments to the City's 2030 Comprehensive Plan to allow for the potential future development of a fire station and other community facilities including a recreation complex. The following amendments are recommended: • Amendment to Chapter 3: Land Use Plan to guide PID: 26-31-22-31-0004, PID: 26-31- 22-31-0003 and a portion of PID: 26-31-22-33-0002 from Park/Open Space to Civic/Institutional land use. • Amendment to Chapter 7: Sanitary Sewer Plan to provide sanitary sewer service from District No. 1 as opposed to District No. 4 as currently guided. BACKGROUND On September 12, 2011, the City of Lino Lakes adopted the 2030 Comprehensive Plan Update in compliance with Minnesota State Statutes 473.864, Subd. 2. As part of the Plan Update, a future land use plan was created, future sanitary sewer flow and capacities were projected, and the City was divided into several Sewer Districts for future planning purposes. In analyzing vision for future land use, as well as the future sanitary sewer system with "full build out" of the Future Land Use Map, certain criteria were assumed/planned for. 1. PID: 26-31-22-31-0004, PID: 26-31-22-31-0003 and a portion of PID: 26-31-22-33- 0002 were guided as "Park and Open Space" land use; 2. A future sanitary sewer system was planned to extend to provide service to PID: 26-31- 22-31-0004, PID: 26-31-22-31-0003 and a portion of PID: 26-31-22-33-0002 through Sewer District No. 4. The Parks/Open Space land use designation is "to accommodate passive or active recreational areas and facilities as well as lands under public control that are designated as permanently undeveloped for the purpose of resource management or protection." At this time, there is consideration by the City to develop these properties into a future fire station and/or other community facilities which may include a recreation complex and associated facilities. With this in mind, an amendment to the Civic/Institutional land use designation, which is intended to "accommodate public buildings or facilities, private or public utilities and infrastructure, public and private schools, and cemeteries", would better suit the anticipated future redevelopment of the property. Proposed Amendments The proposed amendments to the City's Comprehensive Plan are detailed in Resolution No. 14- 131. RECOMMENDATION The Planning & Zoning Board held a public hearing on October 8, 2014. There were no public comments and the Board made recommendation of approval to the Council. In accordance with the Metropolitan Council and Minnesota State Statutes, if the City recommends approval of the proposed comprehensive plan amendments as it relates to the change in the future land use designation and sanitary sewer district allocation, the City must submit the proposed amendment to the Metropolitan Council for their review and approval. Staff recommends approval of the Comprehensive Plan Amendments with the following condition: 1. The adoption of the amendments to the City's Comprehensive Plan is subject to review and approval by the Metropolitan Council. ATTACHMENTS 1. Site Location Map 2. Aerial Map 3. Resolution No. 14-131 4. Figure 3-2: Full Build Out Future Land Use Map 5. Figure 3-3: 2030 Future Land Use Map 6. Figure 3-4: Utility Staging Map 7. Figure 7-2: Sanitary Sewer District Map 8. Figure 7-3: Future Sanitary Sewer System with Full Build Out Future Land Use Map 9. Figure 7-5: Future Sanitary Sewer System with Utility Staging Map 10. Figure 7-6: Future Trunk Sanitary Sewer System MEOW PINE'STT NDAL'- T ` ORANGE ST MOM < n TMAIN ST 18) T=S T 82ND ST -E 1 BOTH ST E ARLO LN z! �i • ■ LDLLO DR ! ELM ST 0 w In EE z AQUA LN MAIN,ST C;3 Z- f p EGRET LN\ 0 w I i g ..1� -� i 4i1� o ���� 1 ARROWHEAD DR o co 0 z 0 c9 0 S ■ ■ tt .&ttttttittftlt•N 0 m 0 CEDAR ST E Im^�' _i� L ` I 014 61611 mum ad minird J imuti CH ST '-1 TqR ASH ST 1 l 1) ■ ■ COUNT NIROAD'J■■■■■■ TIN Site Location Map KFS PID - 26-31-22-33-0002, 26-31-22-31-0003, 26-31-22-31-0004 2,0800000 2,000 Feet WSB Aerial Map PID - 26-31-22-33-0002, 26-31-22-31-0003, I IKES 26-31-22-31-0004 0 500 Feet Path. KA02029-800\GIS\Maps\AerialMap mxtl Date'. 9/26/2014 WSB