HomeMy WebLinkAbout2014-143 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 14-143
APPROVING WORK ORDER NO. 4 AND FINAL PAYMENT NO. 8 FOR THE LAKE &
MAIN / BIRCH & WARE SIGNAL PROJECT
WHEREAS, pursuant to resolution 12-95 of the Council adopted September 10, 2012, awarding
the contract for the Lake/Main & Birch/Ware Intersection Signal Improvement
project to Valley Paving, Inc. and subsequent work order approvals;
WHEREAS, a complete summary of costs are detailed in Payment No. 8 (Final);
NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota that
Work Order No. 4 and Payment Request No. 8 (Final) are approved for a final contract amount
of $1,704,320.13.
BE IT FURTHER RESOLVED
Adopted by the Council of the City of Lino Lakes this 15th day of December, 2014.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Kusterman and was duly seconded by Council Member Roeser and upon
vote being taken thereon, the following voted in favor thereof:
Kusterman, Roeser, Rafferty, Stoesz, Reinert
The following voted against same:
none
ATTEST:
a R ne Bartell, Citi Clerk
CITY COUNCIL
AGENDA ITEM 6A
STAFF ORIGINATOR: Diane Hankee, City Engineer
MEETING DATE: December 15, 2014
TOPIC: Consider Resolution No. 14-143, Approving Work Order No. 4 &
Final Payment No. 8- Lake/Main & Birch/Ware Signal Project
VOTE REQUIRED: 3/5 Vote Required
INTRODUCTION
Staff is requesting council action to finalize the Lake/Main & Birch/Ware Intersection Signal
improvement project.
BACKGROUND
The Lake/Main & Birch/Ware Intersection Signal improvement project original contact amount
was $1,693,428.16. Project approved work orders in the amount of $34,167.31 (including WO 4)
added for a total amount of $1,727,595.47. However, the total value completed to date on the
project is $1,704,320.13.
RECOMMENDATION
Approve Resolution No. 14-143, Approving Work Order No. 4 & Final Payment No. 8 -
Lake/Main & Birch/Ware Signal Project in the amount of $23,126.75 to Valley Paving, Inc.
ATTACHMENTS
Work Order No. 4
Pay Request No. 8 & Final
WSB
zl .,tssnclures, /JJC.
Owner: City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014-1182
For Period: 11/27/2013 to 12/2/2014
Contractor: Valley Paving - Shakopee
8800 13th Ave. East
Shakopee, MN 55379
Pay Voucher
LINO - 2012 Signal Projects
Client Contract No.:
Project No.: 02029-38
Client Project No.:
Date: 12/2/2014
Request No.: 8 & FINAL
Project Summary
1
Original Contract Amount
$1,693,428.16
2
Contract Changes - Addition
$34,167.31
3
Contract Changes - Deduction
$0.00
4
Revised Contract Amount
$1,727,595.47
5
Value Completed to Date
$1,704,320.13
6
Material on Hand
$0.00
7
Amount Earned
$1,704,320.13
8
Less Retainage
$0.00
9
Subtotal
$1,704,320.13
10
Less Amount Paid Previously
$1,681,193.39
11
Liquidated Damages
$0.00
12
AMOUNT DUE THIS PAY VOUCHER NO. 8 & FINAL
$23,126.74
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN
PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE
TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER.
Recommended for Approval by:
WSB & Associates, Inc.
Approved by Contr
Valley Pay " • ako. e
Construction Observer:
Approved by Owner:
City of Lino Lakes
Specified Contract Completion Date: Date:
Comment:
Page 1
Project Material Status
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
Project 1 - Birch Street (CSAH 34) Ware Road
1
2021.501
MOBILIZATION
LUMP SUM
$30,000.00
1
1
0
$30,000.00
2
2101.501
CLEARING
ACRE
$5,553.00
0.35
0.35
0
$1,943.55
3
2101.502
CLEARING
TREE
$307.00
1
7
0
$2,149.00
4
2101.506
GRUBBING
ACRE
$2,276.00
0.35
0.35
0
$796.60
5
2101.507
GRUBBING
TREE
$102.00
1
7
0
$714.00
6
2104.501
REMOVE CONCRETE CURB AND GUTTER
LIN FT
$3.20
280
210
0
$672.00
7
2104.501
REMOVE BITUMINOUS CURB
LIN FT
$1.10
75
75
0
$82.50
8
2104.503
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SQ FT
$0.50
2433
1893
0
$946.50
9
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$3.20
2142
2650
0
$8,480.00
10
2104.505
REMOVE BITUMINOUS TRAIL
SQ YD
$3.20
838
934.7
0
$2,991.04
11
2104.509
REMOVE SIGN TYPE C
EACH
$46.00
7
8
0
$368.00
12
2104.513
SAWING BIT PAVEMENT (FULL DEPTH)
LIN FT
$1.60
5178
2874
0
$4,598.40
13
2104.523
SALVAGE MAIL BOX AND SUPPORT
EACH
$51.00
7
9
0
$459.00
14
2104.523
SALVAGE & REINSTALL IRRIGATION SYSTEM
EACH
$320.00
2
0
0
$0.00
15
2104.523
SALVAGE SIGN TYPE C
EACH
$46.00
3
3
0
$138.00
16
2104.525
ABANDON STRUCTURE
EACH
$1,637.00
1
1
0
$1,637.00
17
2105.501
COMMON EXCAVATION
CU YD
$8.60
1390
1390
0
$11,954.00
18
2105.511
COMMON CHANNEL EXCAVATION
CU YD
$8.60
1121
1121
0
$9,640.60
19
2105.525
TOPSOIL BORROW (LV) MOD
CU YD
$34.00
115
122
0
$4,148.00
20
2105.525
TOPSOIL BORROW (CV)
CU YD
$17.60
329
433
0
$7,620.80
21
2105.601
DEWATERING
LUMP SUM
$960.00
1
0
0
$0.00
22
2211.503
AGGREGATE BASE (CV) CLASS 5
CU YD
$21.50
1012
997
0
$21,435.50
23
2221.503
AGGREGATE SHOULDERING (CV) CLASS 2 MOD
CU YD
$52.70
50
47.4
0
$2,497.98
24
2232.501
MILL BITUMINOUS SURFACE (2.0")
SQ YD
$0.77
7646
6975
0
$5,370.75
25
2360.501
TYPE SP 12.5 WEARING COURSE MIXTURE (4,E)
TON
$63.20
1205
1170.3
0
$73,962.96
26
2360.501
TYPE SP 12.5 WEARING COURSE MIXTURE (2,B)
TON
$65.00
67
74.52
0
$4,843.80
27
2360.502
TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,B)
TON
$58.30
580
771.27
0
$44,965.04
28
2360.502
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,6)
TON
$60.00
89
128
0
$7,680.00
29
2501.515
24" RC PIPE APRON
EACH
$1,237.00
1
1
0
$1,237.00
30
2501.602
TRASH GUARD FOR 24" PIPE APRON
EACH
$389.00
1
1
0
$389.00
31
2502.541
4" PERF PE PIPE DRAIN
LIN FT
$7.20
100
400
0
$2,880.00
32
2502.602
4" PE PIPE DRAIN CLEANOUT
EACH
$307.00
1
1
0
$307.00
33
2503.541
15" RC PIPE SEWER DES 3006 CL II
LIN FT
$29.70
660
686.8
0
$20,397.96
34
2503.541
18" RC PIPE SEWER DES 3005 CL II
LIN FT
$33.70
414
371.2
0
$12,509.44
35
2503.541
24" RC PIPE SEWER DES 3006 CL II
LIN FT
$40.90
220
271.1
0
$11,087.99
36
2504.602
ADJUST GATE VALVE
EACH
$230.00
6
4
0
$920.00
37
2504.602
CONNECT TO EXISTING WATER MAIN
EACH
$1,739.00
1
1
0
$1,739.00
38
2504.602
HYDRANT
EACH
$2,925.00
2
2
0
$5,850.00
39
2504.602
6" GATE VALVE
EACH
$1,115.00
2
2
0
$2,230.00
40
2504.602
1" CORPORATION STOP
EACH
$153.00
4
4
0
$612.00
41
2504.602
1" CURB STOP & BOX
EACH
$240.00
4
4
0
$960.00
42
2504,603
1" TYPE K COPPER PIPE
LIN FT
$21.50
119
117
0
$2,515.50
43
2504.603
6" WATERMAIN DUCTILE IRON CL 52
LIN FT
$29.70
13
15
0
$445.50
44
2504.603
8" WATERMAIN DUCTILE IRON CL 52
UN FT
$34.80
425
399
0
$13,885.20
45
2504.604
2" POLYSTYRENE INSULATION
SQ YD
$15.30
50
7.1
0
$108.63
46
2504.608
DUCTILE IRON FITTINGS
POUND
$5.00
288
281
0
$1,405.00
47
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN H
LIN FT
$215.00
19.3
19.1
0
$4,106.50
48
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 402
UN FT
$266.00
8
7.3
0
$1,941.80
49
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
LIN FT
$266.00
21.7
21.7
0
$5,772.20
50
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020
LIN FT
6532.00
4.87
5
0
$2,660.00
Page 2
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
51
2506.602
CONNECT INTO EXISTING DRAINAGE STRUCTURE
EACH
$1,637.00
1
1
0
$1,637.00
52
2506.516
CASTING ASSEMBLY
EACH
$736.00
9
12
0
$8,832.00
53
2506.522
ADJUST FRAME & RING CASTING
EACH
$624.00
5
3
0
$1,872.00
54
2506.602
CONSTRUCT POND OVERFLOW
EACH
$1,601.00
1
1
0
$1,601.00
55
2511.501
RANDOM RIPRAP CLASS III
CU YD
$107.00
30
48.8
0
$5,221.60
56
2521.501
4" CONCRETE WALK
SQ FT
$4.30
2490
3202.85
0
$13,772.26
57
2521.501
4" CONCRETE WALK SPECIAL (COLORED CONCRETE)
SO FT
$5.10
3449
1541
0
$7,859.10
58
2521.511
2" BITUMINOUS TRAIL
SQ FT
$0.92
7059
9867.9
0
$9,078.47
59
2531.507
6" CONCRETE DRIVEWAY PAVEMENT
SQ YD
$46.00
84
156.5
0
$7,199.00
60
2531.501
CONCRETE CURB & GUTTER DESIGN 6418
LIN FT
$10.90
3002
3138
0
$34,204.20
61
2531.501
CONCRETE CURB & GUTTER DESIGN 6618
LIN FT
$22.50
100
0
0
$0.00
62
2531.501
CONCRETE CURB & GUTTER DESIGN D412
LIN FT
$11.80
470
470
0
$5,546.00
63
2531.618
TRUNCATED DOMES
SQ FT
$36.00
96
96
0
$3,456.00
64
2540.602
INSTALL MAIL BOX AND SUPPORT
EACH
$51.00
7
10
0
$510.00
65
2540.602
MAILBOX SUPPORT
EACH
$102.00
7
0
0
$0.00
66
2554.509
GUIDE POST TYPE B
EACH
$61.00
1
0
0
$0.00
67
2563.601
TRAFFIC CONTROL
LUMP SUM
$35,803.00
1
1
0
$35,803.00
68
2564.531
SIGN PANELS TYPE C
SQ FT
$35.80
60.5
60.5
0
$2,165.90
69
2564.537
INSTALL SIGN TYPE C
EACH
$87.00
3
3
0
$261.00
70
2564.602
INSTALL DELINEATOR
EACH
$77.00
4
4
0
$308.00
71
2565.511
TRAFFIC CONTROL SIGNAL SYSTEM B
SIG SYS
5170,829.00
1
1
0
$170,829.00
72
2565.601
EMERGENCY VEHICLE PREEMPTION SYSTEM 6
LUMP SUM
54,501 00
1
1
0
$4,501.00
73
2565.601
TRAFFIC CONTROL INTERCONNECTION
LUMP SUM
615,344.00
1
1
0
$15,344.00
74
2573.530
STORM DRAIN INLET PROTECTION
EACH
553.00
11
11
0
$583.00
75
2573.540
FILTER LOG TYPE COMPOST LOG
LIN FT
$1.53
2400
420
0
$642.60
76
2573.601
CULVERT END PROTECTION
LUMP SUM
$133.00
1
1
0
$133.00
77
2573.602
TEMPORARY ROCK CONSTRUCTION ENTRANCE
EACH
$693.00
1
0
0
$0.00
78
2575.501
SEEDING
ACRE
61,535.00
0.85
1.09
0
$1,673.15
79
2575.502
SEED MIXTURE 350
POUND
$4.30
72
136
0
$584.80
80
2575.511
MULCH MATERIAL TYPE 3
TON
$382.30
1.7
0
0
$0.00
81
2575.519
DISK ANCHORING
ACRE
$183.60
0.85
0
0
$0.00
82
2575.532
FERTILIZER TYPE 4
POUND
$1.00
128
225
0
$225.00
83
2582.501
PAVT MSSG (RT ARROW) PREFORMED THERMOPLASTIC
EACH
5307.00
11
8
0
$2,456.00
84
2582.501
PAVT MSSG (LT ARROW) PREFORMED THERMOPLASTIC
EACH
$307.00
6
4
0
$1,228.00
85
2582.502
4" SOLID LINE WHITE-EPDXY
LIN FT
$0.39
6390
4983
0
$1,943.37
86
2582.502
4" SOLID LINE YELLOW-EPDXY
LIN FT
$0.39
1080
1085
0
$423.15
87
2582.502
4" DOUBLE SOLID LINE YELLOW-EPDXY
LIN FT
$0.78
3125
2527
0
$1,971.06
88
2582.502
24" SOLID LINE WHITE -PREFORMED THERMOPLASTIC
LIN FT
$21.30
125
131
0
$2,790.30
89
2582.502
24" SOLID LINE YELLOW -PREFORMED THERMOPLASTIC
LIN FT
$21.80
380
256
0
$5,580.80
90
2582.503
CROSSWALK MARKING- PREFORMED THERMOPLASTIC
SQ FT
$11.76
756
828
0
$9,737.28
Totals For Section Project 1 - Birch Street (CSAH 34) Ware Road:
$704,026.78
Project 2 - Lake Drive (CSAR 23) Main Street (CSAH 14)
91
2021.501
MOBILIZATION
LUMP SUM
553,000.00
1
1
0
$53,000.00
92
2101.502
CLEARING
TREE
$161.00
19
15
0
$2,415.00
93
2101.507
GRUBBING
TREE
$46.00
19
15
0
5690.00
94
2102.502
PAVEMENT MARKING REMOVAL - (STOP BAR)
LIN FT
$3.10
110
70
0
$217.00
95
2102.604
PAVEMENT MARKING REMOVAL - (CROSSWALK)
SQ FT
$3.10
180
180
0
$558.00
96
2104.501
REMOVE PIPE CULVERTS
LIN FT
$11.20
110
152
0
$1,702.40
97
2104.501
REMOVE SEWER PIPE (STORM)
LIN FT
$15.30
100
96
0
$1,468.80
98
2104.501
REMOVE CONCRETE CURB AND GUTTER
LIN FT
$2.13
1449
1370.5
0
$2,919.17
Page 3
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
99
2104.501
REMOVE BITUMINOUS CURB
LIN FT
$0.10
556
658.5
0
$65.85
100
2104.503
REMOVE CONCRETE MEDIAN
SQ FT
$0.70
1778
1778
0
$1,244.60
101
2104.503
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SQ FT
$0.40
4770
8818
0
$3,527.20
102
2104.505
REMOVE CONCRETE WALK (PEDESTRIAN RAMP)
SQ YD
$9.60
135
135
0
$1,296.00
103
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$0.5B
2201
4143
0
$2,402.94
104
2104.509
REMOVE FLARED END SECTION
EACH
$614.00
2
2
0
$1,228.00
105
2104.509
REMOVE WOOD POLE W/ LIGHT FIXTURE & FLASHER
EACH
$320.00
2
4
0
$1,280.00
106
2104.509
REMOVE SIGN TYPE C
EACH
$46.00
22
22
0
$1,012.00
107
2104.509
REMOVE DRAINAGE STRUCTURE
EACH
$537.00
2
2
0
$1,074.00
108
2104.509
REMOVE PIPE APRON
EACH
$128.00
5
5
0
$640.00
109
2104.513
SAWING BIT PAVEMENT (FULL DEPTH)
LIN FT
$1.60
2453
3055
0
$4,888.00
110
2104.523
SALVAGE MAIL BOX AND SUPPORT
EACH
$51.00
11
0
0
$0.00
111
2104.523
SALVAGE SIGN TYPE C
EACH
$46.00
28
28
0
$1,288.00
112
2104.602
RELOCATE STREET LIGHT
EACH
$511.00
1
1
0
$511.00
113
2105.501
COMMON EXCAVATION
CU YD
$7.20
2329
2329
0
$16,768.80
114
2105.511
COMMON CHANNEL EXCAVATION
CU YD
$7.20
406
406
0
$2,923.20
115
2105.525
TOPSOIL BORROW (LV) MOD
CU YD
$34.10
90
90
0
$3,069.00
116
2105.525
TOPSOIL BORROW (CV)
CU YD
$17.60
591
340
0
$5,984.00
117
2105.601
DEWATERING
LUMP SUM
$960.00
1
0
0
$0.00
118
2211.503
AGGREGATE BASE (CV) CLASS 5
CU YD
$21.60
1256
1256
0
$27,129.60
119
2221.503
AGGREGATE SHOULDERING (CV) CLASS 2 MOD
CU YD
$44.40
218
163.5
0
$7,259.40
120
2231.603
PAVEMENT CRACKING
SQ YD
$0.46
13865
11520
0
$5,299.20
121
2231.603
PAVEMENT SEATING
SQ YD
$0.27
13865
11520
0
53,110.40
122
2232.501
MILL BITUMINOUS SURFACE (1.5")
SQ YD
$0.37
7400
7413
0
$2,742.81
123
2232.501
MILL BITUMINOUS SURFACE (2.0")
SQ YD
$0.49
14967
9386
0
$4,599.14
124
2232.501
MILL BITUMINOUS SURFACE (3.5")
SQ YD
$0.81
13865
11663
0
$9,447.03
125
2360.501
TYPE SP 12.5 WEARING COURSE MIXTURE (4,E)
TON
$59.70
4024
3539.98
0
$211,336.81
126
2360.502
TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,B)
TON
$55.80
2895
3086.43
0
5172,222.79
127
2501.511
12" CS PIPE CULVERT
UN FT
$23.50
96
123
0
$2,890.50
128
2501.515
12" GS PIPE APRON
EACH
$266.00
4
5
0
$1,330.00
129
2501.515
15" RC PIPE APRON
EACH
$1,442.00
2
2
0
$2,884.00
130
2501.602
TRASH GUARD FOR 12" GS APRON
EACH
$112.00
4
4
0
$448.00
131
2501.602
TRASH GUARD FOR 15" PIPE APRON
EACH
$205.00
2
2
0
$410.00
132
2502.541
4" PERF PE PIPE DRAIN
UN FT
$7.00
100
70
0
$490.00
133
2502.602
4" PE PIPE DRAIN CLEANOUT
EACH
$307.00
1
0
0
$0.00
134
2503.541
12" RC PIPE SEWER DES 3006 CL II
UN FT
$35.80
8
8
0
$286.40
135
2503.541
15" RC PIPE SEWER DES 3006 CL II
LIN FT
$37.80
140
215.2
0
$8,134.56
136
2504.602
RELOCATE HYDRANT
EACH
$3,733.00
1
1
0
$3,733.00
137
2504.602
ADJUST HYDRANT
EACH
$562.00
1
1
0
$562.00
138
2504.602
ADJUST GATE VALVE
EACH
$230.00
7
5
0
$1,150.00
139
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
LIN FT
$358.00
8.3
8.8
0
53,150.40
140
2506.516
CASTING ASSEMBLY
EACH
$649.00
2
2
0
$1,298.00
141
2506.522
ADJUST FRAME & RING CASTING
EACH
$624.00
15
4
0
52,496.00
142
2506.602
CONSTRUCT POND OVERFLOW
EACH
$1,601.00
2
2
0
$3,202.00
143
2511.501
RANDOM RIPRAP CLASS III
CU YD
$107.40
66
64.5
0
$6,927.30
144
2521.501
4" CONCRETE WALK
SQ FT
52.91
6754
6466.2
0
$18,816.64
145
2521.501
4" CONCRETE WALK SPECIAL (COLORED CONCRETE)
SQ FT
$6.65
1290
1168.3
0
$7,769.20
146
2531.507
6" CONCRETE DRIVEWAY PAVEMENT
SQ YD
$47.41
54
127.6
0
$6,049.52
147
2531.507
6" CONCRETE DRIVEWAY PAVEMENT
SQ YD
$58.05
170
92.6
0
$5,375.43
148
2531.501
CONCRETE CURB & GUTTER DESIGN B418
LIN FT
$12.53
934
1233.2
0
$15,452.00
Page 4
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
149
2531,501
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
$12.12
1228
764
0
$9,259.68
150
2531,618
TRUNCATED DOMES
SQ FT
$35.80
232
164
0
$5,871.20
151
2535,501
BITUMINOUS CURB
LIN FT
$5.30
260
360
0
$1,908.00
152
2540.602
WHEEL STOPS
EACH
$64.00
21
21
0
$1,344.00
153
2540.602
INSTALL MAIL BOX AND SUPPORT
EACH
$51.00
11
34
0
$1,734.00
154
2540.602
MAIL BOX SUPPORT
EACH
$102.00
11
34
0
$3,468.00
155
2554.509
GUIDE POST TYPE B
EACH
$61.00
6
6
0
$366.00
156
2563.601
TRAFFIC CONTROL
LUMP SUM
$27,619.00
1
1
0
$27,619.00
157
2564.531
SIGN PANELS TYPE C
SQ FT
$35.80
99
128
0
54,582.40
158
2564.537
INSTALL SIGN TYPE C
EACH
$86.90
28
34
0
$2,954.60
159
2564.602
INSTALL DELINEATOR
EACH
$77.00
2
2
0
$154.00
160
2565.511
TRAFFIC CONTROL SIGNAL SYSTEM A
SIG SYS
$191,288.00
1
1
0
$191,288.00
161
2565.601
EMERGENCY VEHICLE PREEMPTION SYSTEMA
LUMP SUM
$4,194.00
1
1
0
$4,194.00
162
2565.616
REVISE SIGNAL SYSTEM
SYSTEM
54,501.00
1
1
0
$4,501.00
163
2573,530
STORM DRAIN INLET PROTECTION
EACH
$53.00
5
5
0
$265.00
164
2573.540
FILTER LOG TYPE COMPOST LOG
LIN FT
$1.50
500
1253
0
$1,879.50
165
2573.502
SILT FENCE, TYPE MACHINE SLICED
LIN FT
$2.10
400
220
0
$462.00
166
2573.601
CULVERT END PROTECTION
LUMP SUM
5320.00
1
1
0
5320.00
167
2573.602
TEMPORARY ROCK CONSTRUCTION ENTRANCE
EACH
5533.00
1
0
0
$0.00
168
2575.501
SEEDING
ACRE
51,535.00
1.05
1.69
0
$2,594.15
169
2575.502
SEED MIXTURE 350
POUND
$4.30
89
37
0
$159.10
170
2575.511
MULCH MATERIAL TYPE 3
TON
5383.00
2.1
0
0
$0.00
171
2575.519
DISK ANCHORING
ACRE
$184.00
1.05
0
0
$0.00
172
2575.532
FERTILIZER TYPE 4
POUND
$1.00
157.5
350
0
$350.00
173
2582.501
PAVT MSSG (RT ARROW) PREFORMED THERMOPLASTIC
EACH
$307.00
7
8
0
$2,456.00
174
2582.501
PAVT MSSG (LT ARROW) PREFORMED THERMOPLASTIC
EACH
$307.00
8
8
0
$2,456.00
175
2582.502
4" SOLID LINE WHITE-EPDXY
LIN FT
$0.39
15805
18776
0
$7,322.64
176
2582.502
4" SOLID LINE YELLOW-EPDXY
LIN FT
$0.39
2000
1489
0
$580.71
177
2582.502
4" BROKEN LINE YELLOW-EPDXY
LIN FT
$0.39
3420
610
0
$237.90
178
2582.502
4" DOUBLE SOLID LINE YELLOW-EPDXY
LIN FT
$0.78
7005
5496
0
$4,286.88
179
2582.502
24" SOLID LINE WHITE -PREFORMED THERMOPLASTIC
LIN FT
$21.33
186
193.1
0
$4,118.82
180
2582.502
24" SOLID LINE YELLOW -PREFORMED THERMOPLASTIC
LIN FT
$21.83
575
572.7
0
$12,502.04
181
2582.503
CROSSWALK MARKING- PREFORMED THERMOPLASTIC
SQ FT
$11.76
1062
1152
0
$13,547.52
Totals For Section Project 2 - Lake Drive (CSAH 23) Main Street (CSAH 14):
$960,957.23
Backsheet 1
182
2573.571
RAPID STABILIZATION METHOD 3
M GALLONS
$566.00
2
5
0
$2,830.00
183
94592
PRIME CONTRACTOR ALLOWANCE (10%)
LUMP SUM
$113.20
1
0
0
$0.00
Totals For Backsheet 1:
$2,830.00
Backsheet 2
184
2573.571
RAPID STABILIZATION METHOD 3
M GALLONS
$566.00
12
12
0
$6,792.00
185
94592
PRIME CONTRACTOR ALLOWANCE (10%)
LUMP SUM
$679.20
1
0
0
$0.00
Totals For Backsheet 2:
$6,792.00
Work Order 1
186 2575.505 SODDING TYPE SALT RESISTANT SQ YD $3.03 3260 4667 0
$14,141.01
Totals For Work Order 1:
$14,141.01
Work Order 2
187
2021.501
MOBILIZATION
LUMP SUM
$1,300.00
1
1
0
$1,300.00
188
2521.501
4" CONCRETE WALK
SQ FT
56.00
335
335
0
$2,010.00
189
93862
10% PRIME CONTRACTOR MARKUP
LUMP SUM
5331.00
1
1
0
$331.00
190
2545.601
ELECTRICAL SERVICE
LUMP SUM
$6,014.68
1
1
0
$6,014.68
Page 5
Item No.
Item
Description
Units
Unit Price
Contract Quantity
Quantity to Date
Current Quantity
Amount to Date
191
93862
10"/ PRIME CONTRACTOR MARKUP
LUMP SUM
$601.47
1
1
0
$601.47
Totals For Work Order 2:
$10,257.15
Work Order 3
192
2575.523
EROSION CONTROL BLANKETS CATEGORY 3
SQ YD
$1.50
1326.8
1326.8
0
$1,990.20
193
93862
10% PRIME CONTRACTOR MARKUP
LUMP SUM
$199.02
1
1
0
$199.02
Totals For Work Order 3:
$2,189.22
Work Order 4
194 2104.523 FORCE ACCOUNT LUMP SUM $3,126.74 1 1 1
$3,126.74
Totals For Work Order 4:
$3,126.74
Project Totals:
$1,704,320.13