HomeMy WebLinkAbout2014-012 Council Ordinancesls` Reading:
November 10, 2014
Publication:
December 2, 2014
2m1 Reading:
wember 24, 2014
Effective:
January 1, 2015
City of Lino Lakes
Ordinance No. 12-14
An Ordinance Adopting The 2015 City of Lino Lakes Fee Schedule and Providing for the Issuance Of
Licenses, Permits and Collection of Fees Thereof; Repeals All Ordinances, Parts Of Ordinances and
Previous Fee Schedules that Conflict Therewith.
The City of Lino Lakes City Council does ordain the following:
Section 1. Findings. Pursuant to Minnesota Law, the Lino Lakes City Charter, and the Lino Lakes City
Code, and upon a review of a study conducted by City Staff, a fee schedule for City services and licensing is
hereby adopted as follows:
2015 FEE SCHEDULE
ALCOHOLIC BEVERAGES
3.2 Beer Investigation, Initial Application Only
3.2 Beer Off -Sale
3.2 Beer On -Sale
3.2 Beer On -Sale Temporary
Club License
Liquor License Investigation Fee,
Liquor On -Sale License
Liquor Off -Sale
Liquor Temporary Permit
Temporary Set -Up License
Wine License Investigation Fee, Initial Application Only
Wine
Sunday Liquor
On -Sale Brewer Taproom
Off -Sale Growler
Initial Application Only
AMUSEMENT & COMMERCIAL RECREATION
Cabaret License
Dances
Gambling Permit Application
State Licensed Gambling
BUSINESS & MISCELLANEOUS
Assessment Search Fee
Burning Permit
Dog Kennel - Private
Dog Kennel — Commercial
Dog License Male/Female
Dog License Male/Female
1
$262.50 (1 or 2); $462.50 (3+)
$200.00/Year
$300.00/Year
$50.00 + $5.00/Day
$300.00
$262.50 (1 or 2); $462.50 (3+)
$4,500.00/Year
$200.00
$50.00
$25.00
$262.50 (1 or 2); $462.50 (3+)
$500.00/Year
$200.00/Year
$500/Year
$200/Year
$35.00
$200.00/Year
$10.00
Regulation Tax
0.10% of gross receipts less prizes paid
$20.00/Search
$50.00
$20.00/Year
$105.00/Year
$10.50
$5.25(Spayed or Neutered)
Copies: Per Page
Copies: New Resident Labels
Copies: Large Scale (>11"x17")
City Charter
City Code Book
City Map
Comp. Plan.
CD or DVD
Environmental Handbook
Fax Charge
Garbage Hauler License
Overweight Permit
Pawn Shop Class A
Pawn Shop Class B
Class A Secondhand Goods Dealer
Class B Secondhand Goods Dealer
Class C Secondhand Goods Dealer
Pawn Shop Investigation
Pawn Shop In -State Investigation
Pawn Shop Out -State Investigation
Peddler, Solicitor, Transient Merchant
Rental License (annual)
Rental License Re -inspection Fee
Special Event Permit
Tobacco License
Return Check Charge
Zoning Maps
Zoning Ordinance
PARK & RECREATION USER FEES
Field Rental — Resident Only
Baseball/Softball Drag Only
Baseball/Softball Drag & Chalk
Soccer (Excluding Youth)
Picnic Shelter Reservation
Playground Grab Bags
FIRE REGULATIONS
Annual Permit for Sale
Of Consumer Fireworks
1St 10 Copies Free, then .25 per Page
$5.00 per Month Flat Fee
$.50 per sq. foot
1St Copy Free; $10.00 Each Add'l
$75.00
$2.50
$55.00
$7.00
$55.00
1st 10 Pages Free, then .25 per Page
$75.00/First Truck; $45.00 each add'l
$20.00
$10,000.00
$7,000.00
$720.00
$105.00
No Fee
$15,000 (deposit on costs)
$750.00
$20,000.00
$250.00/6 months
$50.00 for 1 or 2 units
$50.00 + $10 per unit for 3 or more units
(fee to be reduced by 50% if issues less
than six months from expiration date)
$50.00
$50.00
$50.00
$30.00
$5.00/Large or Colored
$25.00
$20/Evening
$30/Evening
$65/Evening
Residents - No Fee
Non -Resident - $25
$10.00 / $25.00
$350 exclusive retail seller / $100 in
conjunction with existing retail store
POLICE FEES (Costs include all applicable taxes)
Achieving Compliance through Education (ACE) Program Fees
~" Equipment Violation $50.00
Moving Violation $100.00
2
Ordinance Violation
Parking Violation
Status Offense
Other Violations
Copy of Report
Copy of Report - Mail In
Vehicle Lockouts
Clearance Letter
Fingerprinting
Photographs
Electronic Photographs
False Alarms
Vehicle Forfeiture Fee
DVD (Police Dept)
Dangerous Dog Registration
BUILDING - CONSTRUCTION UTILITIES
Building Permit Fee Schedule
Building Permit Fees shall be based on the Fee Table.
Fire Suppression Permit fee shall be based on Fee Table
Minimum fee of $65.00 for all permits
'Pee Table
$75.00
$100.00
$50.00
$100.00
Free to subject of data up to 3 pages; 4th page
$1.00; then $.25 add' 1 pages up to 100
$4.00 up to 4 pages; $.25 per page thereafter
No charge
$15.00
$15.00 by appt.
$25.00 plus developing cost
$10.00 per page of four
3 free; 4-10 $52.50;
11 or more $100.00 105.00/calendar yr.
$100.00 per vehicle
$25.00
$250/Year
Total Valuation
Fee
$1.00 to $1,360.00
$65.00
$1,361.00 to $2,000.00
$23.50 for the first $500.00 plus $3.05 for each additional $100.00,
or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 plus $14.00 for each additional
$1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 plus $10.10 for each additional
$1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional
$1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 plus $5.60 for each additional
$1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000.00 plus $4.75 for each additional
$1,000.00, or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00 plus $3.15 for each additional
$1,000.00, or fraction thereof
Other Inspections and Fees:
Work commencing before permit issuance
-osion Control Inspection Fee (single, two-family, townhomes up to 8 units)
Multi -family > 8 units, Commercial, Industrial and Institutional determined
by separate agreement.
3
Double Permit Fee
$150.00
Change of use/occupancy inspections $65.00 per trip
Erosion Control Re -inspection Fee $65.00 per trip
N.vections outside of normal business hours $65.00 per hour*
Re -inspection fee $65.00 per trip
Inspections for which no fee is specifically designed $65.00 per trip
Additional plan review required by changes, additions, or revisions $50.00 per hour**
For use of outside consultants for plan checking and inspections, or both Actual Cost***
Plan Review Fee
a. 65% of the Building Permit Fee
b. 25% of the Building Permit Fee for review of similar plans (Master Plan) in a 12 month period Easement
Encroachment Fee county recording fee plus $25.00
Accessory Building Permit: 120 sq. ft. or under in size $65.00
Accessory Building Permit: over 120 sq. ft. in size See Building Fee Table
Fence Permit: 6 feet or under in height $65.00
Fence Permit: over 6 feet in height See Building Fee Table
Grading Permit
Grading Permit Escrow Deposit (if not included in Dev. Contract)
Roofing Permit
$150.00
$300.00
$100.00
Siding Permit $100.00
Swimming Pool Permit: In Ground $150.00
Swimming Pool Permit: Above Ground $100.00
Window/Door Replacement Permit $75.00 per unit (max. $150.00)
Retaining Wall Permit $65.00
Mechanical (HVAC) permit: Gas Fireplace $65.00 (plus $32.50 for each addt'l fireplace)
Mechanical (HVAC) Permit: Residential (except new construction) $65.00
Mechanical (HVAC) Fee: New Construction Residential (does not include fireplaces) $75.00
Mechanical (HVAC) Permit: Commercial
Manufactured Home Permits
imbing Permit
Sewer Connection Fee
4
2% of the contract price ($65.00 minimum fee)
$150.00
9.00 per fixture ($65.00 minimum fee)
$200.00
Water Connection Fee $250.00
Contractor License Verification $5.00 per permit
ontractor Lead Certification Verification (effective Feb 1, 2011) $5.00 per permit
Contractor License $50.00
SAC (Sewer Availability Charge) Per Met Council
3/4" Water Meter City cost plus 10% handling fee and sales tax
1" Water Meter City cost plus 10% handling fee and sales tax
MXU Unit City cost plus 10% handling fee and sales tax
Touch Pad $18.00 plus sales tax
Curb Stop Covers $70.00 plus sales tax
Septic Installation or Repair Permit $200.00
Septic Pumping Permit $10.00
Demolition Permit $65.00
Lawn Sprinkler/Irrigation System Permit (effective June 26, 2008) $65.00
gating or Watering of New Landscaping Permit (sod or seed) No Charge
Lawn Sprinkling Violation $25.00 for first violation
$50.00 for each subsequent citation
Driveway Replacement Permit $65.00
Sign Permit: Existing Billboard
Sign Permit: Permanent
Sign Permit: Sandwich Board
Sign Permit: Temporary (portable/banner)
$85.00 per year
See Building Fee Table
$25.00
$25.00/Term
Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits.
Plan review fees and state surcharge fees are non-refundable. No refund shall be provided if permit has expired.
All permits issued are subject to applicable State surcharge fees.
* Inspections made out side of normal business hours is a three-hour minimum charge
** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision,
overhead, equipment, hourly wages, and fringe benefits of the employees involved.
*** Actual costs include administrative and overhead costs.
An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan
revision and construction observation.
5
ESCROW DEPOSITS
In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be
:ompleted due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of
Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any
unfinished work must be completed within six months (weather permitting) from the date of issuance. The
following escrow amounts are hereby established:
a. Driveway - $1,000.00
b. Exterior Concrete - $1,000.00
c. As -built Surveys - $1,000.00
d. Stucco (final coat only) - $1,000.00
e. Garage Floor - $1,000.00
f. Landscaping - $2,500.00 (landscaping may be escrowed year-round per City Staff)
Escrow deposits include a $50.00 non-refundable administrative fee.
Escrow deposits can be submitted through one of the following procedures:
a.) Escrow can be paid to the City upon execution of an agreement signed by both the payee and the City.
b.) The title company or lending institution can hold the escrow upon execution of an agreement signed by
both the title company or lending institution and the City.
RIGHT-OF-WAY MANAGEMENT
Excavation Permit Fees
.— Hole (includes administration, plan review, inspection, testing and mapping) $125.00
Trench (includes administration, plan review, inspection, testing & mapping)...$70.00 per 100 lineal
feet plus hole fee
Obstruction Permit Fee (includes administration, recording, review & inspection).
Permit Extension Fee (includes administration, recording & review)
..$50.00 plus $.05 per
lineal foot
$55.00
Delay Penalty $60.00
for up to three days of non -completion and non -prior notice before specified date.
After three days an additional charter of $10.00 per day will be levied
Degradation Fee Formula:
This formula covers degradation for depreciation caused by intrusion into the right-of-way. The
depreciation applies to the original surface of the right-of-way and to the overlays and seal -coats applied to
the surface. The formula includes life expectancy schedules for each and has an estimated cost per square yard
based on the quality of the right-of-way surface required for different levels of traffic. This formula creates a
degradation fee which is determined by the cost per square yard for street, overlay, and seal -coat, multiplied by the
depreciation schedule, multiplied by the area of the street patch.
x area of street patch = degradation fee.
Degradation Fee: (cost per square yard for street overlay, and seal -coat x depreciation schedule rates)
6
UTILITY FEES
Sewer Utility Rates (to be considered by separate Ordinance, No. 11-13)
Water Meter Rental
Additional Accessories
Utility Non -Payment Certification Fee
Underground Utility Permit
Meter Testing (Our Cost, Delivered To
5/8" — 3/4" Meter Test
1" Meter Test
1-1/2" — 2" Meter Test
City Trunk Utility Connection Fees
Sanitary Sewer Unit
Water Unit
$400.00 (Deposit) / $25 Per Month
$25.00 Per Month
$30.00
$50.00
Minneapolis)
$50.00
$65.00
$100.00
Lateral Service Connection Fees (Bisel Amendment)
Sanitary Sewer
Watermain
$2,°�0 3,073.00 Per Sac Unit
$3,900 4,069.00 Per Sac Unit
$3-7.00 38.00 Per Front Foot
$34.00 35.00 Per Front Foot
Water Utility Rates (to be considered by separate Ordinance, No. 11-13)
Late Penalty: 10% of unpaid balance, assessed quarterly
Vacant Buildings: Owners of a commercial/industrial building(s) connected to City water and/or sewer
utilities that are vacant due to business closures or other reasons may apply to have the number of billed REU's
reduced to one (1) REU for purposes of calculating utility fees effective from the date the building(s) were vacated
for as long as the building(s) remain unoccupied. When the building(s) again becomes occupied the owner must
inform the City of such occupation, at which time the number of REU's will be determined and utility fees
assessed according to the current fee structure. (Ordinance No. 06-13, passed 8-26-13)
* REU = a residential equivalent connection:
1. Residential — a single housing unit
2. Non -Residential REU = per Met Council Service Availability Charge Procedures Manual
SURFACE WATER MGMT Land Use Type
I. II. III.
Single/Two Multi Family Commercial/Industrial/
Family Lots Lots Institutional Property
Fee Charge per Sq. Ft. of Development $0.137 0.140 $0,1-8-2 0.18 9 $0402 0.209
Area
Surface Water Management Charge: Applied to developing parcels in accordance with the policy
provisions established in Resolution No. 92-70. Credits may be earned for watershed improvements.
CULVERT PRICES
All culvert prices are based on market prices and include tax & delivery and 15% administration fee
7
ESCROW
LAND USE FEE DEPOSIT
Alternative Urban Area -wide Review (I -35E AUAR) $269 per acre
To be charged at the time of land use approval for
projects within the I -35E Corridor AUAR area that require
preliminary plats; conditional use permits; site and building plans;
and planned unit developments. Once paid, the same land will not be
charged again.
Administrative Permit
(no fee for Transient Merchant if issued by City Clerk)
Application Fee (Required With Each Submittal)
$65
$100.00
Comprehensive Plan Amendment
40 Acres or Less $1,500
More Than 40 Acres $5,000
Conditional Use Permit
Residential $750
Commercial/Industrial/Institutional $5,000
Environmental Assessment Worksheet $10,000
Interim Use Permit $750
Ordinance Amendment
Map Amendment (Rezone)
40 Acres or Less $1,500
Over 40 Acres $5,000
Text Amendment $1,500
Planned Unit Development
General Concept Plan $2,500
Development Stage Plan $10,000
Final Plan $5,000
Site Plan Review $5,000
Subdivision
Concept Plan Review $1,500
Minor Subdivision / Lot Split $1,000
Preliminary Plat
40 Acres or Less $2,500
Over 40 Acres $10,000
Final Plat $1,500
9
Tax Increment Financing or Tax Abatement
Vacation (Street, Utility, Drainage)
Variance or appeal
Zoning Confirmation Letter
$7,500
$500
$500
$25
*An escrow account shall be established as indicated above to cover all expenses incurred by the City as part of the
plan review. In the case of applications including multiple requests the highest escrow deposit amount will be the
only one initially required. The applicant is responsible for all costs incurred by the City during plan review. If the
escrow account drops below 10% of the original deposit amount the City will require the submittal of an additional
escrow deposit sufficient to cover any anticipated expenses. Upon City determination that the project is complete
or expired, the City will return the remaining escrow deposit to the applicant.
DEVELOPMENT FEES
Aerial Photo Cost Recovery
Park Dedication — Commercial / Industrial
Park Dedication - Residential
Street Sealcoating
Tree Preservation Mitigation Fee
ENGINEERING
Flood Plain
Elevation Certificate
Elevation Certificate Survey
Digital Contour Mapping
$90.00 per lot
$2,175 per acre
$2,500 per unit
$00 0.31 per square foot
$300.00 per tree
$200.00 Fee
Add'l $1,000.00 Escrow Deposit
$800 per '/2 Section Increment
,STAFF TIME
Staff time for chargeable event/projects shall be charged as the employee's hourly rate of pay plus benefits
plus calculated overhead costs (when applicable). Overtime will be charged at 1.5 times the calculated hourly rate.
LATE FEE
Late penalty fee: a late charge of 10% or $25.00, whichever is greater, will be charged for fees not paid when due.
Section 2. Effective Date of Ordinance. This ordinance shall be in force and effect from and after its passage and
publication according to the Lino Lakes City Charter.
Adopted by the Lino Lakes City Council this 24th day of November, 2014.
The motion for the adoption of the foregoing ordinance was introduced by Council MemberKusterman and was duly
seconded by Council MemberRaf f erty and upon vote bei : a en er- • •, e following voted in favor thereof:
Kusterman, Rafferty, Roeser, S •esz, R inert
The following voted against same:
none
TES
Julianne Brtell, City Cler
Jeff Reine . a
1
r