Loading...
HomeMy WebLinkAbout2003-101 Council Resolution• Century Farm North Final Plat page 6 CITY OF LINO LAKES RESOLUTION NO. 03-101 RESOLUTION APPROVING THE FINAL PLAT FOR CENTURY FARM NORTH WHEREAS, a request has been submitted to the City for the approval of a final plat, and WHEREAS, review and approvals of plats are governed by state statutes and City ordinances, and WHEREAS, the site is included in the Century Farm North preliminary plat approved by the City Council on April 28, 2003, by Resolution 03-60, and WHEREAS, the preliminary plat approval included phasing of the development over several years, and S WHEREAS, the final plat for Century Farm North received by the City July 9, 2003 is consistent with that phasing plan and other City requirements, and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lino Lakes hereby approves the final plat for Century Farm North. Adopted by the Lino Lakes City Council this / day of J I,c,(t , 2003. ATTEST: ray Ann Blair, City CC erk • J. Be eson, Mayor Vgy (S133HS b 30 [ 133HS 33S) V 2NI1 HaLVA 4 ora .u,oa.o.n.sw.nPit .,Ywar.,,u.— gy t¢ .1 DU s/ t yx lw • VI $}LL P I. OW r.cr,sr.00s or•rrrr q 1 s ` u IY e�z•zcs to N Q J O N 0I0 >- n O U O F 0 Z ----- at u I[1 t 7a < 1/1 M LLL D ./, S AA a NCI arra 4.41,61.00S 0C'C691 ---- 9 8 00'00I .81,LZ.00N ass sr I as au AO •3•a.. 1` 3,0.33.3011 v • 1 8 00911, awt 2 r.8I,4.Z.00N 8 j 8 1I 00'800 r.8I,LZ.00N 1 00101 - R ,,..\+...,ami "A�,, ny8t ,,,11:::::..,„.„,„ l r vt,. ;1 C.' Vy J x ye a -. Sa n '• 6d x4 — _l —I .... E 5 fi ew+u b.a. > ; Mel 19 ll 0oe� C r.98,18.00N •\ • 1 4 LT 00101- 89'801 Irev,E1 st 11.81,L8•001.11}4 . '/ m tu tma<.n ., su ao.n .a w Al a+, art— / 888 MATCH LINE B 0 .9"" l6'I4.I P..P 00'9L1 41.9l,4Z.00N 1 I L— n q h (SEE SHEET 2 OF 4 SHEETS) • • • CITY OF LINO LAKES RESOLUTION NO. 03-60 RESOLUTION APPROVING A MUSA RESERVE ALLOCATION AND PRELIMINARY PLAT/ PLANNED UNIT DEVELOPMENT STAGE PLAN FOR CENTURY FARM NORTH WHEREAS, the City has received applications for developing an area known as Century Farm North; and WHEREAS, the development requires approval of the allocation of Metropolitan Urban Service Area (MUSA) reserve and approval of a preliminary plat/planned unit development stage plan; and WHEREAS, a public hearing was held before the Planning & Zoning Board on December 11, 2002 and was continued to January 8, 2003 and February 12, 2003; and WHEREAS, the proposed MUSA allocation and preliminary plat/planned unit development stage plan meet the requirements of the City's Growth Management, Zoning and Subdivision Ordinances; and WHEREAS, the City Council approved Ordinance 12-03 rezoning the site to Planned Unit Development for residential development; and NOW, THEREFORE, BE IT RESOLVED that the City Council of Lino Lakes hereby approves the MUSA allocation and preliminary plat/planned unit development stage plan for Century Farm North with the following conditions: 1. A total of 55.0 acres of MUSA shall be allocated for the project, and the project's 249 • residential units shall be developed in accordance with the following phasing plan, which is illustrated on Attachment A: year 2003 2004 2005 2006 2007 total MUSA acres to be Allocated 15.3 11.4 13.5 5.4 9.4 55.0 Lots to be final platted 56 65 52 43 33 249 2. A cul de sac will be constructed at the east terminus of the new Carl Street within Century Farm North. Carl Street will not be connected to the existing Carl Street as part of the Century Farm North development. 3. The driveway of Lot 7, Block 6 be shifted eastward to the extent possible. • • 4. The submitted townhome housing types and building elevations be modified to specify finish materials and be subject to City approval. Side walls facing public streets shall include windows or other architectural features to avoid the appearance of a blank wall. 5. Lots 1-3, Block 4 shall be "airpark" lots. If these or other designated airpark lots are to be converted to non-airpark lots in the future, depending on the extent of changes to the design or configuration of the lots and roads, this could require replatting and a PUD amendment, at the City's discretion. 6. The applicant provide documentation to the City that all applicable runway safety requirements have or will be satisfied. The runway safety zone requirements are herebay established as a zoning restriction. As shown on the preliminary plat, the restricted area is measured from the edge of a 200' wide strip centered on the runway. At 126' from the edge, the maximum structure height is 18'. At 175' from this edge, the maximum structure height is 25'. The structure height maximum limit shall follow the slope of this imaginary surface and shall continue to extend over the development. 7. Specific hanger designs be submitted subject to City approval prior to consideration of the final plat approval of the lots with the hangers. 8. All homeowner association by-laws be subject to review and approval by the City Attorney prior to consideration of the final plat for lots where the association applies. 9. The wetland mitigation plan be subject to comment and recommendation by the City Engineer and Rice Creek Watershed District. All conditions imposed by the Rice Creek Watershed District shall be satisfied. The filling of land intended to be upland for park dedication must be accepted with the mitigation plan. 10. Park dedication shall include cash as well as land, shall include the trail across the 2nd • Addition to the eastern plat boundary, and include rough grading of the park land. Generally, park land shall be as indicated on the "Parks/Open Space" plan submitted in the April 2003 booklet. However, a new preliminary plat shall be submitted that clearly shows the park dedication lands, along with upland data for all areas intended to be dedicated as parkland. This data shall be reviewed to ensure acceptability prior to final plat approval. There must be a minimum of 4.5 (four and one-half) acres of contiguous upland useable for active recreation uses as determined by the Public Services Director, and a minimum of 7.0 (seven) acres total upland. The cash dedication may, at the City's discretion, be reduced by the cost of trail construction or other in-kind activities by the developer. Trail locations within the park areas shall be determined by the overall park design. The final park dedication shall be included in the development agreement, which must be reviewed by the City Council for approval. • 11. Grading, drainage and utility related modifications and comments as recommended by the City Engineer in the attached memorandum (dated April 16, 2003) shall be addressed and incorporated into the plans. 12. The project is subject to the results of the sewer feasibility study. 13. The project is subject to the City's determination of the number of residential units to be allowed to connect to the City water system, based on the system's ability to provide adequate service, prior to the construction of the infrastructure needed to provide service to the units. 14. The project is subject to all requirements of Anoka County regarding access to Sunset Road/CR 53. 15. Additional right of way for Sunset Road/CR 53 shall be dedicated, to total 60' from centerline, within all areas of the plat. 16. The City formally vacate the segment of Carl Street as needed for developing this plat. 17. The airplane hangers in Lots 1-4 and Lot 9, Block 4 (Phase 1) shall be built on the runway side of the houses, with the houses fronting on the road rather than the houses on the runway side of the lots. 18. Signs shall be installed along all wetland buffer/easement areas. Wetland easements shall extend, at a minimum, 10 feet outward from the delineated wetland boundary. 19. This resolution shall not be effective until the rezoning approved by Ordinance 12-03 is in effect. 20. Elements of the project not specifically designed or addressed in the plans and supporting documents are subject to the standards of the zoning ordinance. R-1 standards will apply to single family detached portions, the R-3 standards to the multi -family attached portions. 21. Prior to consideration of a final plat, a revised preliminary plat shall be submitted for City review to ensure that it reflects approved revisions. 22. This approval is based on the following plans and information, and supporting documentation: Existing Conditions Plan, received January 31, 2003 Preliminary Plat, dated January 20, 2003, received January 31, 2003 Preliminary Site Plan, dated January 20, 2003, received January 31, 2003 Phasing Plan (data April 18, plan sheet April 23, 2003) Preliminary Landscape Plan, dated January 20, 2003, received January 31, 2003 • • • Preliminary Grading Plan, dated March 20, received March 28, 2003 Preliminary Utility Plan, dated March 20, received March 28, 2003 Townhome Building Elevations, received April 2003 Alternative Airpark Lot Layout, received January 31, 2003 City Engineer Comments dated April 16, 2003 Public Services Director Comments (Park Board) dated August 6, 2002 and December 4, 2002 23. Prior to commencing site work on Century Farm North, the developer must supply a plan that includes pond reconfiguration, tree planting, landscaping, and buffering for the pond south of the air park which incorporates neighborhood concerns and is acceptable to the City as approved by the City Council. Passed by the Lino Lakes City Council this day of 2003. ATTEST: Ann Blair, City Clerk John J. Bergeson, Mayor z � t o k4sz • 1103N011 1030,1 GN1 'Oaf HL9 HL99OyN rem Al ivaa0 fltla '00d.L HLION MRldd )9 J 44 11100 M 1Wd IYIlRpM1 10(00 -NK 7N WilderEISE0 HUM WA AMMO 01.00.100.00 AI LSC 0 0 0 0 0 0 1-1-F1-I-I- Nba1YNM N N M Y 0) •i/I0 0 0 0 Q .0 L L L L CL a a a 0. I I I I M Y Y1 00 N 0 0 0 0 0 N00000 N N N M > g. w cn 0 CC IX a w W g 0 0 0 • V Elevation a a al N r, • • • AGENDA ITEM 7 C (ii) STAFF ORIGINATOR: Jeff Smyser C. C. MEETING DATE: July 14, 2003 TOPIC: Resolution 03-101: Final Plat, Century Farm North VOTE REQUIRED: 3/5 BACKGROUND The preliminary plat for Century Farm North was approved by the City Council on April 28. The developer has submitted the final plat for phase 1. Under the new subdivision ordinance, final plats are to be reviewed by the P & Z. This is the first final plat to which the new requirement applies. It was reviewed by P & Z on July 9. The developer has requested that the City Council approve the final plat on July 14. At the time of writing this report, some issues were unresolved pending direction from the City Council. The submitted final plat includes individual lots for units in phase one of the approved phasing plan. This includes 56 units: 17 single family detached townhomes and 39 single family lots. Of the 39 SF lots, nine of them in Block 4 will be airpark lots. ANALYSIS As required by the subdivision ordinance, the following requirements shall be met before consideration of the final plat by the Planning and Zoning Board or the City Council: a. The final plat shall substantially conform to the approved preliminary plat and phasing plan. b. For plats that consist solely of individual single family residential lots, final plat applications for subsequent phases shall not be approved until building permits have been issued for forty (40) percent of lots in the preceding phase. This paragraph applies only when the preceding phase consists of forty (40) or more lots. c. City Attorney approval of the status of title/property ownership related to the final plat. d. Completed development contract including all required financial securities and timeframe for final plat and final grading completion. • • • Century Farm North Final Plat page 2 e. Conditions attached to approval of the preliminary plat shall be fulfilled or secured by the development agreement, as appropriate. f. All fees, charges, and escrow related to the preliminary or final plat shall be paid in full. Conformance With Preliminary Plat (a): The submitted final plat includes the phase one lots with the remainder of the site in outlots. The final plat is in substantial conformance with the approved preliminary plat. Completion of Preceding Phase (b): This is the first phase of the project, so the `minimum completion' clause doesn't apply. However, it will apply to subsequent phases. It is expected that the final plat for phase two will be submitted for approval early in January 2004. With construction beginning in mid -2003, it is unknown if 40% of phase one (22 units) will be sold and have building permits issued. Title (c): The title commitment and the final plat must be submitted to the City Attorney in time for an opinion for the City Council meeting. Among other things, the City Attorney compares the title commitment with the signature page of the plat to ensure all persons with property interest are represented on the signature page. As of July 9, the City Attorney had not received the title commitment and plat. As of Friday, July 11, I have no further information from the City Attorney. The City should not approve the plat without a complete and acceptable title commitment. Development Agreement and Fees (d) and (f): Agenda item 7 C (i) addresses this item. Conditions of Approval (e): Resolution 03-60 approved the preliminary plat and lists conditions of approval (see attached). The development agreement often includes conditions that cannot be met prior to construction. For example, the phasing plan is an ongoing requirement. Location of airplane hangars and wetland easement signs are other examples. However, other conditions should be met prior to final plat approval to ensure they get done. Condition #7 requires review of airplane hangar design prior to final plat approval. The attached drawings show the proposed hangar design. In addition to the drawings, the draft homeowner covenants include the restrictions listed below. Airplane Hangars. Airplane hangars are permitted on Air Park Lots subject to the Lino Air Park North Declaration, the Permit and the following additional restrictions: (a) Any airplane hangar constructed upon an Air Park Lot shall be built in conformance with all building codes and regulations of the City and other governmental and quasi -governmental entities having jurisdiction over the Air • Century Farm North Final Plat page 3 Park Lots and over Outlot B, Lino Air Park North, and its use as a private air strip. (b) Aircraft hangars and their construction and location upon an Air Park Lot, are subject to prior approval by the Committee. (c) Airplane hangars must meet the following minimum criteria: (i) Architectural compatibility with living units located upon the Air Park Lot including color (earth tones only) and architectural style, although they may be constructed with metal sidewalls. (ii) Must not exceed 3200 square feet. (iii) Sidewall height of not less than twelve feet nor more than eighteen feet. (iv) Not less than one entry door. (v) An overhead clear span door a minimum of ten foot wide and eight foot high. (vi) 3/12 maximum roof pitch. (vii) Roof color coordinated with sidewall color. (viii) Minimum 24 inch and maximum 36 inch sidewall overhang, and minimum 12 inch and maximum 18 inch gable overhang. (ix) A forty foot minimum clear span door on the gable end facing the applicable taxi way. (x) Such additional aesthetic detail as the (Air Park Architectural Control) Committee may designate including, but not limited to, windows and window treatments, louvers and landscaping. (xi) Any improved apron fronting the taxi way door of the airplane hangar not to extend with ten feet of the lot line. (d) Commercial use (including space rental) of any airplane hangar is not permitted. These (or a revised version) would be included in the covenants on the property. However, the City has no authority to enforce private covenants. If the City wants to enforce specific conditions, it would have to be done through a separate mechanism. Condition #8 requires City review of the homeowner association documents. Drafts have been submitted and forwarded to the City Attorney. Condition #10 refers to the unresolved park dedication question. A new plan illustrating park dedication has been received. It indicates 4.7 acres of contiguous upland and another 3.1 acres of upland that is not contiguous. This acreage is acceptable. However, the subdivision ordinance requires that dedicated upland, at a value of $28,000 per acre, be subtracted from a total cash amount calculated at $1665 per dwelling unit. Other credits can be subtracted as well. In discussion with the Public Services Director, the following park dedication scenario is proposed: • Century Farm North Final Plat page 4 TOTAL CASH CONTRIBUTION previously total new cash per total units platted units unit total 249 8 241 $ 1,665 401,265 VALUE OF LAND DEDICATION upland acres 7.813 addl. acres for east trail 0.060 addl. acres for north trail 0.250 per acre total dedication credit 8.123 $ 28,000 (227,444) OTHER construction of concrete sidewalk (5') and bituminous trail (8') $ (70,000) balance: cash dedication $ 103,821 That is, the land indicated on the "Preliminary Park Plan" of June 23, 2003 would be dedicated. Upland would be credited toward the park dedication as would two small additional pieces to preserve the potential for future trail connections. Construction of the sidewalk and trail would be credited. The listed cash balance would be dedicated as well. The developer has agreed to the land dedication and to escrow the cash, but wants to investigate the justification of the formula and the land values being used in the dedication policy. Condition #15 requires additional right of way for Sunset Road. This is supplied on the final plat. OPTIONS. Approve Resolution 03-101 approving the final plat for Century Faun North. 2. Return to staff with direction. RECOMMENDATION At the time of writing this report, the title commitment and homeowner association documents have not received City Attorney approval. The City Council must decide if it is acceptable to rely on the homeowners association to enforce the airplane hangar design elements. If the issues listed above are satisfactorily resolved, staff recommends Option 1. Century Farm North Final Plat page 5 • If the above issues are not resolved, staff does not recommend approval. This report is based on the following: Final Plat, Century Farm North, received July 9, 2003. Preliminary Park Plan, June 23, 2003 Hangar drawings, June 20, 2003 •