HomeMy WebLinkAbout2003-104 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 03-104 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT — TWILIGHT ACRES WATERMAIN IMPROVEMENT PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of the Twilight Acres Watermain Improvement project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid C & L Excavating, Inc. $165,192.50 BNR Excavating, Inc. $169,350.00 Forest Lake Contracting, Inc. $173,097.00 Redstone Construction Company, Inc. $179,183.82 Friedges Contracting $179,596.22 Meyer Contracting, Inc. $184,566.00 Penn Contracting, Inc. $184,586.40 Northdale Construction, Inc. $193,853.18 Engineer's Estimate $154,616.00 AND WHEREAS, it appears that C & L Excavating, Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with C & L Excavating, Inc., in the name of the City of Lino Lakes for the construction of the Twilight Acres Watermain Improvement project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the Lino Lakes City Council this 14th day of July 2003. f% Ann J. BI ir) City Clerk AGENDA ITEM 7D • STAFF ORIGINATOR: James E. Studenski, City Engineer • COUNCIL MEETING DATE: July 14, 2003 TOPIC: Resolution No. 03-104, Accepting Bids and Awarding Construction Contract, Twilight Acres Watermain Improvement Project VOTE REQUIRED: 3/5 Vote Required BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on June 7, 2003. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid C & L Excavating, Inc. $165,192.50 BNR Excavating, Inc. $169,350.00 Forest Lake Contracting, Inc. $173,097.00 Redstone Construction Company, Inc. $179,183.82 Friedges Contracting $179,596.22 Meyer Contracting, Inc. $184,566.00 Penn Contracting, Inc. $184,586.40 Northdale Construction, Inc. $193,853.18 Engineer's Estimate $154,616.00 The low bid is approximately 7% over the Engineer's Estimate for this project. A copy of the complete bid tabulation is attached. This 7% overage falls within the 10% contingency budgeted for the project. The substantial completion date for this project is September 1, 2003, with a final completion date of September 23, 2003. The project is to be funded by the City's trunk funds and reimbursed through utility connection charges. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 03-104, Accepting Bids and Awarding a Construction Contract to C & L Excavating, Inc. for the Twilight Acres Watermain Improvement project. 3. Not adopt Resolution No. 03-104. RECOMMENDATION: Option No. 2 - Staff recommends adoption of Resolution Number 03-104. • TKDA ENGINEERS • ARCHITECTS • PLANNERS July 8, 2003 Honorable Mayor and City Council City of Lino Lakes, Minnesota Re: Twilight Acres Watermain Improvements City of Lino Lakes, Minnesota TKDA Commission No. 12278-05 1500 Piper Jaffray Plaza 444 Cedar Street Saint Paul, MN 55101-2140 (651) 292-4400 (651) 292-0083 Fax www.tkda.com Dear Mayor and City Council: Bids for the referenced project were received on July 7, 2003, with the following results. A complete Tabulation of Bids is enclosed for your information. Contractor Base Bid C & L Excavating, Inc. BNR Excavating, Inc. Forest Lake Contracting, Inc. Redstone Construction Co., Inc. Friedges Contracting Co. Meyer Contracting Co. Penn Contracting, Inc. Northdale Construction, Inc. $165,192.50 $169,350.00 $173,097.00 $179,183.82 $179,596.22 $184,566.00 $184,586.40 $193,853.18 Engineer's Estimate $154,616.00 Recommendation We recommend that you award the Contract to the lowest bidder, C & L Excavating, Inc., for their low bid of $165,192.50. Please do not hesitate to call me with any questions or comments you may have. Sincerely, Scott A. Brink, P.E. Project Manager SAB:art Enclosure An Employee Owned Company Promoting Affirmative Action and Equal Opportunity ENGINEERS • ARCHITECTS - PLANNERS BIDS OPENED: JULY 7, 2003, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION• ENGINEER'S ESTIMATE C & L EXCAVATING BNR EXCAVATING ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 0 0 0 0 (O 69 0 0 0 0) O (0 ER 0 0 0 o O) ER $ 2,600.00 1$ 1,530.00 0 0 0 0 0 (D ER L $ 7,800.00 O 0 0 0 0 (0 ER $ 5,000.00 $ 224.00 0 0 o 0 O ‘-•CN ER 0 0 v 0 CD coM 69 $ 8,500.001 0 0 ri Et. E9 $ 800.00 $ 3,888.00 0 0 t0 (O 0 ER $ 500.00 $ 28,980.001 0 0 o 0 CO ER $ 4,500.001 0 0 0 0 • R 69 0 0 0 0a - .N 69 $ 1,200.00 0 0 (m (6 iW 0 0 o 0 M (A to 1- ER $ 800.00 1 $ 29.00 O 0 4O N 69 0 O O ER $ 2,200.00 0 O O ER $ 240.00 $ 200.00 $ 2.50 0 O E9 0 0 (R 0 0 O (O CO - QERI 69 $ 1,013.00 0 o O O ER 0 co V ER $ 5.00 1 0 o N ER 0 co ERI $ 44.00 1 $ 15.00 $ 2.20 O co .- 69 $ 150.00 1 0 0 O O O 69 1 $ 33,005.00 $ 1,400.00 $ - 3,400.00 $ 1,950.00 $ 5,700.00 0 0 (0 h 0) d' ER $ 1,250.00 1 $ 1,875.00 $ 2,800.00 0 0 O N .-• ER 0 0 O 0 CO 4- ER 0 0 (0 Is e.. r) I•••• P M► 0 0 O 0 N h 69 0 0 O 0 0 N ER $ 1,500.00 $ 2,227.50 0 0 Oi CO N ER 0 0 O 0 N NI' ER $ 31,500.001 0 0 O to 0 O) N ER $ 4,200.00] 0 0 0 O 0 to 69 $ 400.oq 0 0 O 0 N CO- EA $ 92,016.50 $ 165,192.50 0 0 (O n R 69 0 (O N ER 0 0 M 69 1 $ 850.00 $ 650.00 0 0 0 O) 69 0 N O ER 0 0 ton 69 0 0 h ER 0 0 0 0 M1.6 69 69 0 0 M ER $ 7,200.00 $ 2,000.00 $ 300.00] to I- N ER $ 3.00 O 0 OD ER 0 0 1.6 ER $ 41.50 1 $ 14.00 0 (O N ER 0 0 ER $ 400.00 $ 1,000.00 1 $ 41,860.00 0 0 O (0 co 69 $ 2,400.00 0 0 O 0 h tO ER 0 0 O (D M O) ER $ 1,875.00 $ 3,750.00] $ 2,400.00 $ 672.00 0 0 d 0 V N vi 0 0 h h M (D 1 ER $ 10,000.001 $ 1,000.00 0 0 O O to r ER 0 0 (O N o N 69 $ 1,239.00 1 0 0 (n I` o tR $ 21 000.00 1 $ 28,000.00 $ 3,000.00 0 0 O O O (D ER $ 200.00] 0 0 (6 O N ER $ 78,239.00 ---------- - $ 154,616.00 $ 500.00 $ --26.00 $ 24.00 0 0 O O ER 0 0 O O co E9 0 0 O 0) 69 $ 12.00 $ 75.00 $ 150.00 $ 3.00 $ 3.00 0 0 fR 0 0 0 0 O O O O (R E9 0 0 O M 69 $ 2.50 1 $ 3.00 0 in r ER' $ 10.00 $ 40.00 0 O O �M ER 0 O I ER 0 O Na 69 0 O M 69 EA LF LF EA EA W LF W W LBS SF LF LS 1 LS W IY H L AS LF CY TON Z 0 CY 1 f) LF EA 2 1610 40 v r) CO 780 25 N 800 224 1,600 DIVISION II - STREET CONSTRUCTION AND RESTORATION 4-%10 810 M V (00 N 2,100 700 300 0 00 N 100 8 [DIVISION I - WATERMAIN CONSTRUCTION CONNECT TO EXISTING WATERMAIN 8" DIP WATERMAIN (CL 52) 6" DIP WATERMAIN (CL 52) 18" GATE VALVE AND BOX 6" GATE VALVE AND BOX FIRE HYDRANT 1" COPPER SERVICE PIPE (TYPE K) 1" CORPORATION STOP 1" CURB STOP AND BOX (SSBN>IOIHl ,,b) NOIlVlfSNI SONillld dIG TRENCH STABILIZATION ROCK 1 -SUBTOTAL DIVISION 1 1 MOBILIZATION TRAFFIC CONTROL CLEAR AND GRUB REMOVE BITUMINOUS PAVEMENT (ALL DEPTHS) SAWCUT BITUMINOUS PAVEMENT (ALL DEPTHS) COMMON EXCAVATION (STREET AND DRIVEWAY) AGGREGATE BASE (CL 5) 100% CRUSHED 2350 TYPE LV 3 WEAR COURSE B TOPSOIL BORROW (LV) 1 SOD - LAWN TYPE EROSION CONTROL FENCE ADJUST SANITARY MANHOLE SUBTOTAL DIVISION II TOTAL TWILIGHT ACRES WATERMAIN IMPROVEMENTS N M 4 (n co n co O O� ,- r r- N CO V u) CO n O, o OT `- N ENGINEERS • ARCHITECTS - PLANNERS BIDS OPENED: JULY 7, 2003, AT 10:00 AM "DENOTES ERROR IN BIDDERS CALCULATION FOREST LAKE CONTRACTING REDSTONE CONSTRUCTION FRIEDGES CONTRACTING CO ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT O co 0)N M fig $ 37,770.60 $ 814.80 $ 2,882.28 $ 1,619.34 n O M t[) 69 o N O (sl CO 0 69 �$ 766.75 O 0 h 0) .-• fR $ 2,912.00 $ 1,550.08 O 0 (0 ER $ 66,510.52 $ 4,295.531 O 0 O t` E9 $ 2,158.351 O O to (D M 69 v 0 V M N 69 $ 2,200.00 $ 43,260.00 $ 35,455.00 $ 4,893.00 O 0 O CO 0) 0) 64 O 0 '4) ((00 ER $ 3,529.281 o t- K) CO 0 M T. T. fR $ 179,596.221 $ 569.65 1 $ 23.46 (— co N 69 r$ 720.57 $ 539.78 0) co CO N 69 0) Lo N 69 I $ 30.67 co (0 ((00 UT et CO M 69 (NI 0) (O ER 0 O fR co In Q4) N V 69 O 0 00 h 64 1 O to R d4 $ 5.58 O CO 00 ER O (D N 69 in (O O 69 M (D `— 64 O) O) R CR in (O (0 ER $ 441.16 1 CO N a 0 0) — 69 0 N (O (- O) 0) R 69 1 $ 928.80 �f CO. Ul ' ER 0 (O O r O N ER .7 N N CO (O 69 0 (D 0) 0 V' N- ER I $ 3,961.75 0 0 (D 00 N (n CO 8.00 $ 788.48 0 0 (O ER $ 92,123.96 (O 0) (D (D N E9 0 O O 0 CO va $ _ 875.00 $ 1,620.00 $ 1,032.501 O O O 0 0 co- Ci, $ 29,400.00 $ 31,500.001 $ 3,900.00 $ 4,900.00 O O O 0 ' 69 O N M (D N N 69 CD co 0) in 0 t- $ 179,183.821 1 $ 952.14 1 $ _ 30.42 N N M N ER 1 $-- 1,037.96 0 N O co0) 64 1 $ 2,207.47 $ 22.32 (,- Nr CD - ER .— N 69 0 O 64 $ 3.52 0 O ER CO 0) (0D h 69 0 O O (On 69 0 0 0 0 (f) N .r— 69169 0 4) N 69 0 0 S 69 $ 14.00 0 0 (C) 69 $ 13.00 U) N Vi $ 4.00 $ 282.90 1 $ 1,200.00 1 $ 37,030.00 0 0) 64 $ 3,200.00 $ _ 1,800.00 O CO (O 69 1 $ 14,040.00 1 $ 1,250.00 $ 2,250.00 - $ 800.00 $ 448.00 O 0 00 ER $ 77,538.00 O O N 64 $ 500.00 1 $ 1,000.00 $ 1,620.00 $ 1,239.00 $ 4,500.00 $ 29,400.00 O O (n M Vi $ 2,400.001 $ 3,700.00 $ 200.00 $ 4,000.001 $ 95,559.001 $ 173,097.001 0 0 0i CO fR I$ 23.00 0 0 N 14 1 $ 800.00 0 0 0 CO E9 $ 2,200.00 1 $ 18.00 0 0 (0()I00) :A 0 0 Vi 0 0 69 0 0 N 64 $ 5.00 0 0 0 0 N 69 0 0 ci 0 (C) ER $ 200.00 $ 2.00 $ 3.0CTI 0 0 -- ER 0 0 ER. $ 50.00 1 $ 8.00 U) 0 000 N 69 6, 9 $ 500.00 W J J Q W W W 1 LF - W EA LBS SF LF Ls 1 J AS 33xL JZ CY TON TON CY 1 CO J EA N 0 40 �t M M 780 O N to N 800 N N O CO DIVISION I1 - STREET CONSTRUCTION AND RESTORATION O to O M '? O p N N 700 0 M 2,000 100 [n DIVISION I - WATERMAIN CONSTRUCTION CONNECT TO EXISTING WATERMAIN 8" DIP WATERMAIN (CL 52) 6" DIP WATERMAIN (CL 52) 18" GATE VALVE AND BOX 6" GATE VALVE AND BOX FIRE HYDRANT 11" COPPER SERVICE PIPE (TYPE K) 1" CORPORATION STOP 1" CURB STOP AND BOX [DIP FITTINGS INSULATION (4" THICKNESS) TRENCH STABILIZATION ROCK SUBTOTAL DIVISION I MOBILIZATION TRAFFIC CONTROL CLEAR AND GRUB REMOVE BITUMINOUS PAVEMENT (ALL DEPTHS) SAWCUT BITUMINOUS PAVEMENT (ALL DEPTHS) COMMON EXCAVATION (STREET AND DRIVEWAY) AGGREGATE BASE (CL 5) 100% CRUSHED 2350 TYPE LV 3 WEAR COURSE B TOPSOIL BORROW (LV) SOD - LAWN TYPE EROSION CONTROL FENCE ADJUST SANITARY MANHOLE SUBTOTAL DIVISION II TOTAL TWILIGHT ACRES WATERMAIN IMPROVEMENTS N 01 V (n CO t` co 0 O) 04 s— N CO 111 CD CO 01 O,_ 7 TKDA COMMISSION NO. 12278-05 ENGINEERS -ARCHITECTS -PLANNERS BIDS OPENED: JULY 7, 2003, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION MEYER CONTRACTING CO PENN CONTRACTING NORTHDALE CONSTRUCTION ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT I f $ 87,786.00 $ 97,797.00 $ 111,321.50 t$ 184,566.00 $ 184,586.40 $ 193,853.18 $ 8,000.00 $ 38,318.00 V.mrng - cci o CV N R ER cri N-(D •- Vi $ 5,268.45 $ 16,083.60 $ 1,671.75 $ 3,368.50 $ 3,456.00 $ 938.56 $ 16.00 ?m coDc (4 co I C c r' 6 411 r ,vvv. JU $ 3,000.00 $ 3,125.00 $ 2,835.00 $ 2,271.50 $ 3,750.00 $ 28,350.00 $ 33,600.00 $ 4,650.00 $ 7,840.00 $ 500.00 $ 4,400.00 0 0 C ococ 0 N C 0 ER ER E L4.L6 $ 706.42 $ 537.98 $ 1,756.15 N coco N ER N CD ER V'1 Icllro 1 r ER ER N CA ER r O CR C c C C E 4 I / ,UUU.UU $ 3,000.00 $ 625.00 $ 3.50 0 no.I0010 n 6R 040 In r) r r ER; CR 0I0INI v ER la) ui r 1 69 r) fR O oo 10 ER O 10 c0 ER I 1 l l $ 5,600.00 $ 49,910.00 0 0*0 b o 'V co r ce fig ER $ 2,130.00 $ 7,200.00 $ 7,488.00 $ 1,700.00 $ 2,875.00 $ 2,080.00 $ 806.40 $ 2,400.00 ea (0 CD co ER < 1 i I 3,0UU.UU $ 3,000.00 ' $ 1,500.00 $ 2,835.00 $ 1,652.00 $ 4,500.00 $ 34,650.00 $ _ 33,600.00 $ 5,100.00 $ 5,000.00 $ 300.00 o 0 t0 CV ER 010 co O 0 03 N ER 0 CO ER 0 0 0 0 co O N COn ER ER 0 0 0 0 O o t^ 0 N ER ER 0 CD co ER 0 O a0 (0 0 0 0 (0 C0 N r r 0 0 CO (0 r) r ER ER O 0 O 0 CO- ER O 0 o r 0 r) ER 010 01IC) O 01 ER M ER 0 0 V• ER 0 0 0 10 m CO r r ER ER i 010 0 CO V' ER 010 N ER i 010 N ER 0 r1 ER $ 270.00 I I I $ 900.00 $ 40,250.00 0 0 0 O NICD co_ r11N r ER co $ 2,760.00 $ 7,500.00 $ 13,416.00 $ 5,000.00 $ 6,250.00 $ 4,000.00 $ 4,704.00 $ 6,080.00 OCI )ti.. 0 w $ 7,500.00 1 $ 1,500.00-1 $ 875.00 $ 1,296.00 0 0 10 co O - N ER 0 0 0 0 O O 0 co In v '4' tor/ ER EA 0 0 O 0 r) N ER 0 0 0 0 N -cc: ER 0 0 0 0 o CO IER 0 0 0 0 r) ER 1 $ 1,800.00 $ 450.00 $ 25.00 $ 40.00 $ 1,080.00 $ 920.00 $ 2,500.00 17.20 0 N ER 0 0 01 ER ER 0 0 N ER E969. $ 7,500.00 $ 1,500.00 $ 175.00 $ 1.60 0 O0t I!) 0 00 Lo. 10000 Or j l 4» IER 0 M ! NI- t � 4» ER169 0 r) 0 r) E/3 $ 225.00 I I LI - 1JJ LF EA EA EA lF Q W mCn SF LF C/3 JJ UJ ey > cn LL} J 1 C,) j l Z: Z O O }� 0 LL u) J Q W N r 40 A ( r) N N 0 0 N CD r DIVISION II - STREET CONSTRUCTION AND RESTORATION r r l! 10 1 O c0 M' V' IOn N 0 ., 0 N C— 0 r) C4 0 r CO DIVISION I -WATERMAIN CONSTRUCTION 1 'CONNECT TO EXISTING WATERMAIN 8" DIP WATERMAIN (CL 52) 6" DIP WATERMAIN (CL 52) 8" GATE VALVE AND BOX 6" GATE VALVE AND BOX FIRE HYDRANT 1" COPPER SERVICE PIPE (TYPE K) 1" CORPORATION STOP 1" CURB STOP AND BOX DIP FITTINGS INSULATION (4" THICKNESS) TDI d('I.l CTARII I7ATION ROCK Z 0 0 5 co - J 0 N MOBILIZATION TRAFFIC CONTROL CLEAR AND GRUB REMOVE BITUMINOUS PAVEMENT (ALL DEPTHS) SAWCUT BITUMINOUS PAVEMENT (ALL DEPTHS) 'COMMON EXCAVATION (STREET AND DRIVEWAY) AGGREGATE BASE (CL 5) 100% CRUSHED 2350 TYPE LV 3 WEAR COURSE 13 TOPSOIL BORROW (LV) SOD - LAWN TYPE EROSION CONTROL FENCE ADJUST SANITARY MANHOLE SUBTOTAL DIVISION I! TOTAL TWILIGHT ACRES WATERMAIN IMPROVEMENTS V r) t0 tD r co a T c t .— N I r) O I CD s0 CA O I T 1 T