HomeMy WebLinkAbout2003-176 Council Resolution• • CITY OF LINO LAKES RESOLUTION NO. 03-176 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT — CENTURY TRAIL LIFT STATION PROJECT. WHEREAS, pursuant to an advertisement for bids for the construction of the Century Trail Lift Station project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid Carl Bolander & Sons Company $ 77,406.00 Jay Bros., Inc. $ 78,902.00* CCS Contracting $ 87,843.00 Engineer's Estimate $105,700.00 AND WHEREAS, it appears that Carl Bolander & Sons Company is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Carl Bolander & Sons Company, in the name of the City of Lino Lakes for the construction of the Century Trail Lift Station project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the Lino Lakes City Council this 13th day of October 2003. Ann J. Blai2, City Clerk Joh J. Ber on,ayor • • AGENDA ITEM 7H STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: October 13, 2003 TOPIC: Resolution No. 03-176, Accepting Bids and Awarding Construction Contract, Century Trail Lift Station VOTE REQUIRED: 3/5 Vote Required BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on October 2, 2003. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid Carl Bolander & Sons Company $ 77,406.00 Jay Bros., Inc. $ 78,902.00* CCS Contracting $ 87,843.00 Engineer's Estimate $105,700.00 The low bid is approximately 27% below the Engineer's Estimate for this project. A copy of the complete bid tabulation is attached. There was an error in the total amount of bid by Jay Bros., Inc. The total amount increased and moved them out of the low bid. Jay Bros., Inc. has been notified of the error. The substantial completion date for this project is March 1, 2004, with a final completion date of May 31, 2004. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 03-176, Accepting Bids and Awarding a Construction Contract to Carl Bolander & Sons Company for the Century Trail Lift Station project. 3. Not adopt Resolution No. 03-176. RECOMMENDATION: Option No. 2 - Staff recommends adoption of Resolution Number 03-176. • • TKDA ENGINEERS • ARCHITECTS • PLANNERS October 8, 2003 Honorable Mayor and City Council City of Lino Lakes, Minnesota Re: Century Trail Lift Station City of Lino Lakes, Minnesota TKDA Commission No. 12793-02 Dear Mayor and City Council: 1500 Piper Jaffray Plaza 444 Cedar Street Saint Paul, MN 55101-2140 (651) 292-4400 (651) 292-0083 Fax www.tkda.com Bids for the referenced project were received on October 2, 2003, with the following results. A complete Tabulation of Bids is enclosed for your information. Contractor Base Bid Carl Bolander & Sons Company Jay Bros., Inc.* CCS Contracting Engineer's Estimate $77,406.00 $78,902.00 $87,843.00 $105,700.00 * The total base bid of Jay Bros, Inc. was tabulated as $76,833.00. However, there was a mathematical error in the summation and the corrected total base bid is $78,902.00. Recommendation We recommend that you award the Contract to the lowest bidder, Carl Bolander & Sons Company, for their base bid of $77,406.00. Please do not hesitate to call me with any questions or comments you may have. Sincerely, Christopher W. Bryan, P.E. Project Manager CWB/bas Enclosure An Employee Owned Company Promoting Affirmative Action and Equal Opportunity TABULAT NOF B ENGINEERS • ARCHITECTS • PLANNERS *DENOTES ERROR IN BIDDERS CALCULATION CARL BOLANDER & SONS ENGINEERS ESTIMATE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0 0 0 0 0 M O 0 10 CO 0 CO 0 0 N1- N n O oi Vi ER I69 ER (R FA 413 o oo o 0 0 0 0 0 0 O 0 0 0 0 to 00 O O V N N n n ER (R EA EA iA O O O O 0!rn N W (A 0 0 0 0 0 0 0 0 O N o O O M o 0 O (o O o N f- co- N VIVIVIVI 0 0 0 0 0 0 O o 0 0 0 0 F- 6 v o (o v 0 Q Z CO40 N m N 00) to 0 ▪ 0 N N O N F- 2 03 ER ER (R (R ER 0 0 of N 1 (0 O o 0 0 0 0 0 0 0 O 0 10 W V to V O co N n (o CO 0) N N N 1- v9 (R 69 ER 0 00000 0 o O o 0 0 W a) el co Ni Z U CO N N W to Etni Nr- a N (O N EA ER 09 03 fA 69 Z Z O - O F- 2 W • a >- 1- 0 F- 0 DESCRIPTION w • O f- Z 0 0 N N O o o O 0 0 0 0 M to 4 M M (0 L - (A 0, to ER E9 ER O O O O O O O O O O O O CO () to CO ER 69 ER O O O O O O O O •t- t. - 6969 E/3 0 0 0 O O O 0 0 r.":. to e- O (A {A O O O O O O ER O O O O O EA O O O O O tri ER O O O 'tt EA (n J W (0 0) J J 0) -J Z Z F- J O N O CO o O W Z 0 a_ aw 0 0 az oQ CD J O; wa • N co 4 to t0 SUBTOTAL DIVISION I w 0) cc 0 U 0 J u� 0 z z O 0 ▪ w U O O W g O g Z Z J O cooXXQ oirtw2w D Q J J Q O Z m W W Z wan.(n U)0< 1-0 WW tOo ton Z W N I- W OU to co<NNE Z 0 0) 0 J CO H • O • ENGINEERS • ARCHITECTS • PLANNERS BIDS OPENED: OCTOBER 2, 2003, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION CCS CONTRACTING BIDDER BIDDER ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT EA EA EA EA EA EA EA EA EA 69 EA EA EA, sA IEA EA EA 69 EA 69 ER EA 69 69 EA EA Ef) tf) 1 $ 4,000.00 1 00 0 O O 6 N EA 0 0 0 O c N EA $ 5,000.00 �$ 21,150.00 1 o EC) N Eft $ 80,650.00 $ 1,625.00 $ 1,440.00 $ 2,040.00 $ 2,040.00 0 ao EA 00 ri .1- h EA $ 87,843.00 $ 4,000.00 0 O O O O EA 0 O O O aC) N EA 0 O O O (C) iA $ 21,150.00 0 O O u) N fA 0 M EA $ 18.00 $120.00 $ 120.00 0 O 69 LS LS J LS 1 LS CY TN TN 1 h 0 4- CV Q 4-,- � 125 O CO LIFT STATION MOBILIZATION SUBMERSIBLE PUMPS CONTROL PANEL LIFT STATION COVER, HARDWARE, AND DROP PIPE 10 DIP, CL 52 STATION PIPING, VALVES, AND FITTINGS PAINTING SUBTOTAL DIVISION I - STREETS AND RESTORATION SELECT GRANULAR BORROW (LV) AGGREGATE BASE, CLASS 6 2" 2350 TYPE LV, MIX NO.4 WEARING COURSE 2" - 2350 TYPE LV, MIX NO. 3 NON -WEARING COURSE BITUMINOUS MATERIAL FOR TACK COAT SUBTOTAL DIVISION II TOTAL .- N M V LO, (0 .- N kn V (O