Loading...
HomeMy WebLinkAbout2003-181 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 03-181 AUTHORIZING ENGINEERING AND ARCHITECTURAL SERVICES FOR WOODS EDGE WHEREAS, Legacy Holdings Lino Lakes, LLC. (the "Developer") has submitted a proposal for a mixed use development called The Legacy at Woods Edge (the "Project") in the southeast quadrant of the I-35W/Lake Drive interchange; and WHEREAS, SEH has submitted a proposal for an agreement to complete a Feasibility Report and Preliminary Design for the Project (the "Agreement') in the amount of $99,614; and WHEREAS, the Developer has agreed to pay 80 percent of the costs of the Agreement in the amount of $79,691 and the City has agreed to pay 20 percent of the costs of the Agreement in the amount of $19,923. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes as follows: 1. The Mayor and City Clerk are hereby authorized and directed to execute the Agreement with SEH upon submittal of payment by the Developer. 2. Staff and consultants are hereby authorized and directed to take any and all other steps necessary or convenient in order to accomplish the conditions of the Agreement. Dated: October 13, 2003. John Bergeson, Mayor ATTEST: Ann B14 City Clerk AGENDA ITEM 71 STAFF ORIGINATOR: Michael Grochala DATE: 10/13/03 TOPIC: Resolution No. 03-181 Authorizing Engineering and Architectural Services for Woods Edge (Village) Development BACKGROUND: SEH has submitted a proposal and timetable for the completion of a Feasibility Report and Preliminary Design for the Woods Edge development. The scope of services will include establishing right-of-way corridors for the project, defining the extent of improvements needed for Lake Drive, and preparing a report that evaluates the feasibility of installing public improvements. The scope of services includes four tasks: 1. Concept Plan Refinement $19,897 2. Preliminary Design $31,717 3. Project and Agency Coordination $23,598 4. Feasibility Report $24,402 Total: $99,614 Concept Plan Refinement includes assisting the city with architectural treatments, street layouts, traffic patterns and parking. Preliminary Design work includes layouts for utilities, streetscape, landscape and street lighting. Project and Agency Coordination will consist of progress meetings with the city, developer, and public agencies such as Rice Creek Watershed, Anoka County and Mn/DOT. The Feasibility Report will be prepared that incorporates the preliminary design features, documents the extent of agency involvement, and can be used as the basis for a public improvement hearing. Hartford Group has agreed to pay 80% of the cost ($79,691) based on a prorated portion of land that they control. The city's portion of the costs ($19,923) will be paid through the remaining Livable Communities money available from the 1997 grant and 2003 economic development funds budgeted for this project. OPTIONS: 1. Adopt Resolution No. 03-181 authorizing Engineering and Architectural Services for Woods Edge 2. Return to staff for further consideration RECOMMENDATION: Option 1 ff5EH October 8, 2003 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 651.490.2000 651.490.2150 FAX architecture engineering environmental • transportation Mr. Mike Grochala Community Development Director City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 Dear Mr. Grochala: RE: Lino Lakes, Minnesota Legacy at Woods Edge Agreement for Feasibility Study and Preliminary Design SEH No. P-LINOL0402.00 This letter proposal forms the basis of an Agreement between the City of Lino Lakes and SEH for completion of a Feasibility Report and Preliminary Design related to the proposed land use development on property that is herein referred to as the Legacy at Woods Edge. Background The Legacy at Woods Edge is a proposed mixed-use development that includes commercial (downtown retail), high density residential, and recreational facilities (YMCA). The proposed site is approximately 40 acres in size, is adjacent to the City Hall complex, and is bounded by I -35W on the north, Lake Drive (CSAH 23) on the west, and Rice Creek Chain of Lakes Park Reserve on the east. There is a bank building and a clinic within the project area abutting the east side of Lake Drive, and both buildings are to be preserved and incorporated into site development. The City has reached an agreement with the YMCA to include a facility in the overall development plan. Approximately 29.5 acres within the site are privately owned (the Tagg property) and the Hartford Group has negotiated a purchase agreement for the property. The City owns the remaining property. SEH is in the process of completing an Environmental Assessment Worksheet (EAW) for the project and is also completing a traffic study of the adjacent Lake Drive corridor. Scope of Services A detailed Scope of Services is attached to this proposal as Exhibit A. The Scope of Services identified will be used to establish right-of-way corridors for the project, to define the extent of improvements needed for Lake Drive, and to prepare a report that evaluates the feasibility of installing public improvements to support development of the site. Our proposed Scope of Services is summarized as follows: Concept Plan Refinement We will perform a preliminary survey of Lake Drive and gather available digital site mapping data from the City and the Hartford Group to prepare a digital base map for the site. We will review the Lino Lakes Town Center Design and Development Guide, as prepared by Calthorpe Associates, to identify features and amenities that can be incorporated into the overall site plan. We will assist the City in reviewing architectural treatments and features proposed by the developer. A refined concept plan will Short Elliott Hendrickson Inc. • Your Trusted Resource • Equal Opportunity Employer Mr. Mike Grochala October 8, 2003 Page 2 be prepared to show proposed street layouts, traffic patterns, and right-of-way, as well as parking configurations. Preliminary Design After reviewing the refined concept plan with the City and the developer, we will prepare preliminary layouts for sanitary sewer, water main, and storm sewer improvements, develop typical roadway sections and establish preliminary streetscape, landscape, and street lighting details. Geometric improvements for Lake Drive will be identified. Utility pipe sizing and storm water ponding/infiltration sites and sizes will be determined. An opinion of probable construction cost will be prepared for the elements identified above. Project and Agency Coordination We will attend progress review meetings with the City and developer on an as -needed basis. We also anticipate attendance at several progress review meetings with Mn/DOT, Anoka County, Rice Creek Watershed District and other affected agencies. We have also included attendance at two Environmental Board meetings, two Planning and Zoning Board meetings, two City Council meetings, and a public open house meeting. Feasibility Report A feasibility report will be prepared that incorporates the preliminary design features, documents the extent of agency involvement, and can be used as the basis for a public improvement hearing. Related Work If authorized by the City, results from a traffic study for the Lake Drive corridor will be incorporated into the Feasibility Report. Additional Services At the City's request, we can provide (or arrange for) the following services, which are in addition to our Scope of Services: • Topographical Surveys • Wetland Delineations • Geotechnical Investigations • Preparation of Plat Documents • Parking Lot Design Schedule Our proposed schedule is as follows: Contract Authorization by City of Lino Lakes October 13, 2003 Prepare Refined Concept Plan and Submit for City Review October 17, 2003 Incorporate City Comments and Prepare Final Concept Plan for City Approval October 31, 2003 Complete Preliminary Design and Submit for City Review November 21, 2003 Submit Preliminary Design for Agency Review December 1, 2003 Feasibility Report for City Review December 12, 2003 Conduct Public Improvement Hearing January 28, 2004 Mr. Mike Grochala October 8, 2003 Page 3 Compensation Compensation for the tasks identified in the Scope of Service will be made on an hourly basis plus the cost of reimbursable expenses. Total compensation will not exceed $99,615 without prior authorization from the City Council. If the additional services listed above are authorized by the City, an adjusted work program and cost estimate would be prepared. Agreement If this document satisfactorily sets forth your understanding of our agreement, please sign both copies in the space provided and return one copy to us. The signed agreement will serve as the accepted agreement and authorization to proceed. We look forward to working with the City of Lino Lakes on this important project. If you have any questions or need any additional information, please contact Bob Moberg at 651.490.2147. Sincerely, SHORT ELLIOTT HENDRICKSON INC. ,X. Sax -t c,,,d Robert L. Moberg, PE Sean R. Clark, PE Project Manager/Principal Client Service Manager sah Attachment Wpfiles I\spli\ko\iioo1\040200\sle100603.doc Accepted this day of , 2003 CITY OF LINO LAKES, MINNESOTA By: Title: .._lacy at Woods Edge Concept Plan Refinement (Task #1) Deliverables: Refined Concept Plan showing street and utility layouts, ponding / infiltration areas, and streetscape / landscape features. Task Project Manager Prof. Engineer Specialty Eng / Arch Staff Engineer Word Processor Survey Crew A. Data Collection Gather as-built data 2 2 Review as-built data / add as-built utilities to basemap 1 2 2 Import electronic base mapping from Hartford Group 1 2 2 Import electronic base mapping from YMCA 1 2 2 Import proposed development scheme from Hartford Grour 1 2 2 Develop overall base mapping 4 2 8 Preliminary Survey of Lake Drive 20 B. Concept Plan Preparation Define property line configurations 1 2 4 Develop roadway geometrics correlating to site usage 2 8 4 12 Identify right-of-way requirements 1 4 8 Identify landscape / streetscape elements 1 8 8 Identify preferred architectural treatments 1 4 4 _ Create concept plan defining roadway and drainage areas 2 8 12 Present plan for City and developer review 2 8 8 2 Total hours 172 16 44 18 72 2 20 Project labor cost this task $17,766 Expenses Mileage and Expenses $100 Survey Expenses $515 Reproductions $1,000 Computers $516 Total project cost this task $19.897 .eqacv at Woods Ed r limi Deliverables: Preliminary Grading Plan, Street and Utility Plan, Preliminary Hydraulic Analysis and Pond Routing, Plan, Preliminary Cost Estimate Preliminary Landscaping Plan, Preliminary Streetscape Task Project Manager Prof. Engineer Design Engineer Specialty Eng/Arch Staff Engineer Word Processor A. Preliminary Grading Plan Preparation Prepare detail sheets and location sheet 2 4 4 Lay out preliminary contours and lot pads 2 8 12 24 Determine ponding locations 1 4 Determine infiltration locations and techniques 1 4 Calculate earthwork 1 8 4 Prepare preliminary grading plan with supporting calculations 4 6 8 2 8 2 B. Preliminary Street and Utility Plan Preparation Prepare profiles, horizontal alignments, and geometric layouts 4 12 16 4 24 Prepare typical sections and pavement design 1 2 4 Prepare storm sewer piping layouts 2 2 8 16 Prepare sanitary sewer and watermain layouts 4 8 12 24 Prepare street and utility plan with supporting calculations 2 4 8 12 2 C. Preliminary Hydraulic Analysis and Pond Routing Perform hydroCAD modeling 2 4 Design and calculate pond volumes 1 2 2 4 - Determine drainage routing patterns 1 2 1 2 D. Preliminary Landscaping / Streetscaping Plan Preparation Prepare preliminary landscaping plan 4 8 8 24 2 Prepare preliminary open space layout plan 4 2 8 8 24 1 Prepare preliminary streetscape details 4 2 8 12 24 1 E. Prepare Preliminary Estimate of Probable Construction Cost Compute Quantities 2 4 4 2 8 Compute Preliminary Estimate 2 2 4 2 8 2 Total hours 485 40 52 114 51 218 10 Project labor cost this task $28,712 Expenses Mileage and Expenses $50 Reproductions $1,500 Computers $1,455 Total project cost this task $31,717 Legacy at Woods Edge Project and Agency Coordination (Task #3) Deliverables: Presentation Materials for Meetings and Open Houses Meeting Minutes and Agency Documentation Task Project Manager Specialty Eng / Arch Prof. Engineer Staff Engineer Word Processor ........................................................................................ ................. . ...................... . ................... . .............. ............ ..:....... . .� .... �:;iiS;ii;i;i;i;iii;i:s:i :,;:c......_,: i i::;�iEi:ii`y:: A. Project Meetings Meetings / coordination with City Staff (6 estimated) 24 12 8 4 4 Meetings with City Staff and Developer (4 estimated) 16 8 4 2 2 Planning and Zoning Commission meetings (2 estimated) 8 4 2 2 1 Environmental Board meetings (2 estimated) 8 4 2 2 1 City Council meetings (2 estimated) 8 8 2 2 1 Public open house (1 estimated) 4 4 2 2 2 B. Agency Meetings Meetings with Rice Creek Watershed District (2 estimated) 8 8 4 2 2 Meeting with Mn/DOT and Anoka County (1 estimated) 4 4 2 2 1 ................................................................190 ....... ........26........ ........18....... .......:14:.:.:.: Total hours 80..............52 Project labor cost this task $22,128 Expenses Mileage and Expenses $400 Reproductions $500 Computers $570 Total project cost this task $23.598 Legacy at Woods Edge Feasibility Report (Task #4) Deliverables; Report and Figures Task A. Report Preparation Project Manager Prof Engineer Staff Engineer Word Processor Develop report drawings 8 24 Develop cost participation formulas 6 10 10 Draft report 10 20 12 10 Submit report for City review 8 12 Prepare report revisions as needed 4 8 2 B. Public Improvement Hearing Schedule and attend public improvement hearing 10 12 12 2 Prepare display materials for hearing 8 8 20 2 Total hours 218 54 70 78 16 Project labor cost this task $20,698 Expenses Mileage $50 Reproductions $3,000 Computers $654 Total project cost this task $24,402