HomeMy WebLinkAbout2001-124 Council ResolutionCouncil Member Dahl introduced the following resolution and moved its
adoption:
CITY OF LINO LAKES
RESOLUTION NO. 01-124
RESOLUTION ORDERING PREPARATION OF STUDY FOR THE 12TH
AVENUE/HOLLY DRIVE STREET RECONSTRUCTION.
WHEREAS, it is proposed to improve 12th Avenue and Holly Drive from County Road J
(Ash Street) to CSAH 10 (Birch Street) to by reconstructing the street, constructing curb
and gutter, sanitary sewer, watermain, and storm sewer and,
WHEREAS, the City proposes to assess the benefitted property for the cost of the
improvement, pursuant to Minnesota Statutes, Chapter 429, and Chapter 8 of the Lino
Lakes City Charter.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. That the proposed improvements be referred to the City Engineer for study and
that he is instructed to report to the Council with all convenient speed advising
the Council in a preliminary way as to whether the proposed improvement is
feasible and as to whether it should best be made as proposed or in connection
with some other improvement, and the estimated cost of the improvement as
recommended.
Adopted by the Lino Lakes City Council this 27th day,,
Jea► iger, Deputy City C rk
August, 2001.
John J, erge on, Mayor
The- otion for adoption of e foregoing resolution was duly seconded by Council
Member Reinert
favor thereof: Bergeson, Carlson, Dahl, Reinert and O'Donnell.
The following voted against same: None.
Whereupon said resolution was duly passed and adopted.
and upon vote being taken thereon, the following voted in
CERTIFICATION
I hereby certify that the above is a correct copy of a resolution duly passed, adopted and
approved by the City Council on August 27, 2001.
Jea
Iger, Deputy City
AGENDA ITEM 7J
STAFF ORIGINATOR: John Powell, City Engineer
COUNCIL MEETING DATE: August 27, 2001
TOPIC: Resolution No. 01 - 124, Ordering Preparation of a Feasibility Study
for the 12th Avenue/Holly Drive Reconstruction.
VOTE REQUIRED: 4/5 Vote Required
BACKGROUND:
On August 13, 2001, the City Council considered the West Shadow Ponds
subdivision. Based on City staff's review of the draft minutes from the meeting, a
condition of the preliminary plat approval was initiation of a feasibility study for
the reconstruction of 12th Avenue and Holly Drive.
The study will consider sanitary sewer, watermain, and storm sewer issues;
wetland impacts; road section and other matters related to reconstructing the
streets. A study of this road from County Road J (Ash Street) to CSAH 10 (Birch
Sreet) was also prepared in 1995. As much information and data as is possible
will be utilized from the previous study.
Pursuant to Minnesota Statutes, Chapter 429, and the Lino Lakes Charter,
Council is required to order the preparation of a report studying the proposed
improvements.
OPTIONS:
1. Return to staff for further review.
2. Adopt Resolution No. 01-124, Ordering Preparation of a Feasibility Study for
the 12th Avenue/Holly Drive Reconstruction.
RECOMMENDATION:
Option No. 2 - Staff recommends that Resolution No. 01-124 be adopted.