Loading...
HomeMy WebLinkAbout2001-134 Council ResolutionCouncil Member adoption: Reinert introduced the following resolution and moved its CITY OF LINO LAKES RESOLUTION NO. 01-134 RESOLUTION RECEIVING BIDS FOR THE TWILIGHT ACRES SANITARY SEWER EXTENSION IMPROVEMENTS. WHEREAS, pursuant to an advertisement for bids for the construction of the Twilight Acres Sanitary Sewer Extension project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Volk Sewer and Water, Inc. Penn Contracting, Inc. Kenko, Inc. Arcon Construction Co., Inc. Engineer's Estimate Amount of Bid $257,373.50 $303,034.60 $317,947.00 $335,063.30 $278,982.00 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The bids are hereby received. Adopted by the Lino Lakes City Council this 10th day of September, 2001. Jea ger, Deputy City John J. ergesdn, Mayor The motion for adoption oma' e foregoing resolution was duly seconded by Council Member Carlson and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: Bergeson, Carlson, Dahl, Reinert and O'Donnell. Whereupon said resolution was duly passed and adopted None. CERTIFICATION I hereby certify that the above is a correct copy of a resolution duly passed, adopted and approved by the City Council on Septemberl0, 2001. e: n Vi • er, Deputy City Clerk CITY OF LINO LAKES TWILIGHT ACRES/TWILIGHT ACRES 2ND UTILITY IMPROVEMENTS COMMISSION NO. 12278-02 BIDS OPENED: September 7, 2001 10:00 AM 'DENOTES ERROR IN BIDDERS CALCULATION ITEM NO. DESCRIPTION QUANTITY UNIT TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED ENGINEERS -ARCHITECTS -PLANNERS TABULATION OF BIDS ENGINEER'S ESTIMATE Base Bid Alternate Bid UNIT TOTAL UNIT TOTAL PRICE AMOUNT PRICE AMOUNT VOLK SEWER & WATER Base Bid Alternate Bid UNIT TOTAL UNIT TOTAL PRICE AMOUNT PRICE AMOUNT ___I 1 2 3 4 5 TWILIGHT ACRES CLEAR &GRUB TREE 8" PVC, C900 SANITARY SEWER CONSTRUCT 4' DIA. MANHOLE TYPE 301(0 - 10' DEPTH) 14.00 2,340.00 12.00 EA LF EA LF EA LF $ 200.00 $ 24.00_ $ 1,800.00 $ 2,800.00 $ 56,160.00 $ 500.00 $ 20.95 $ 200.00 $ 24.00 $ 2,800.00 $ 56,160.00 $ 7,000.00 $ 49,023.00 $ 500.00 $ 7,000.00 _ $ 20.95 $ 49,023.00 $ 21,600.00 $ 1,800.00 $ 21,600.00 $ 1,400.00 $ 16,800.00 $ 1,400.00 $ 16,800.00 EXTRA DEPTH OF 4' DIA. MH 14.70 1.00 7.26 $ 100.00 $ 1,470.00 $ 100.00 $ 1,470.00 $ 80.00 $ 1,176.00 $ 80.00 $ 1,176.00 8" DIP OUTSIDE DROP CONNECTION (0-2')_ $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 6 EXTRA DEPTH 8" DIP OUTSIDE DROP CONNECTION $ 50.00 $ 363.00 $ 50.00 $ 363.00 $ 100.00 $ 726.00 $ 100.00 $ 726.00 7 4' ON 8' PVC, C-900 WYE BRANCH 25.00 EA $ 350.00 $ 15.00 $ 4.00 $ 15.00 $ 8,750.00 $ 350.00 $ 8,750.00 $ 275.00 $ 6,875.00 $ 275.00 $ 6,875.00 8 4' PVC, C-900 SAN. SEW. SERVICE PIPE 315.00 LF $ 4,725.00 $ 15.00 $ 4,725.00 $ 15.00 $ 4,725.00 $ 15.00 $ 4,725.00 9 _ 10 11 4" RIGID POLYSTYRENE INSULATION 8,788.00 _ _ 80.00 2,340.00 SF LF LF $ 35,152.00 $ 1,200.00 $ 4.00 $ 35,152.00 $ 1,200.00 $ 1.85 $ 16,257.80 $ 1.85 $ 16,257.80 _ _ - _ _ _ _ TRENCHSTABILIZATION ROCK TELEVISE SANITARY SEWER MAINS $ 15.00 $ 5.00 $ 0.55 $ 400.00 $ 5.00 $ 400.00 $ 2.00 $ 5.00 $ 4,680.00 $ 500.00 $ 2.00 $ 5.00 $ 4,680.00 $ 500.00 $ 1,287.00 $ 0.55 $ 1,287.00 12 REMOVE CONCRETE DRIVEWAY 100.00 1,600.00 SY SY $ 10.00 $ 5.00 $ 15.00 $ 1,000.00 $ 10.00 $ 1,000.00 13 14 15 REMOVE BITUMINOUS PAVEMENT $ 3.00 $ 4,800.00 $ 3.00 $ 4,800.00 $ 8,000.00 $ 9,900.00 $ 5.00 $ 8,000.00 AGGREGATE BASE CLASS 5 660.00 TN $ 10.00 $ 6,600.00 $ 10.00 $ 6,600.00 $ 15.00 $ 9,900.00 2350 TYPE LV 2 OR 3 NON WEAR COURSE 120.00 TN TN GA SY SY LF $ 34.00 $ 40.00 $ 2.50 $ 35.00 $ 3.00 $ 4,080.00 $ 6,000.00 $ 34.00 $ 4,080.00 $ 93.50 $ 93.50 $ 11,220.00 $ 14,025.00 $ 93.50 $ 93.50 $ 11,220.00 $ 14,025.00 _ 16 17 ___ 18 19 2350 TYPE LV 4 WEARING COURSE 150.00 $ 40.00 $ 6,000.00 CRS -1 BITUMINOUS MATERIAL FOR TACK 55.00 $ 137.50 $ 2.50 $ 35.00 $ 3.00 $ 137.50 $ 3,500.00 $ 3.68 $ 56.25 $ 202.40 $ 5,625.00 $ 3.68 $ 202.40 6" CONCRETE DRIVE 100.00 3,400.00 $ .3,500.00 $ 10,200.00 $ 56.25 $ 5,625.00 SODDING $ 10,200.00 $ 2.86 $ 9,724.00 $ 180.00 $ 2.86 , $ 9,724.00 20 SILT FENCE 60.00 $ 3.00 $ .180.00 $ 3.00 $ 180.00 $ 3.00 $ 3.00 ' $ 180.00 SUBTOTAL $ 174,097.50 $ 174,097.50 $ 166,646.20 $ 166,646.20 TWILIGHT ACRES 2ND 1 8" PVC, C900 SANITARY SEWER 1,511.00 LF $ 24.00 $ 36,264.00 $ 24.00 $ 36,264.00 $ 20.95 $ 31,655.45 $ 20.95 $ 31,655.45 2 CONSTRUCT 4' DIA. MANHOLE TYPE 301(0 - 10' DEPTH) 11.00 6.45 EA LF $ 1,800.00 $ 100.00 $ 19,800.00 $ 645.00 $ 1,800.00 $ 100.00 $ 19,800.00 $ 645.00 $ 1,400.00 $ 80.00 $ 15,400.00 $ 516.00 $ 2,500.0c7 $ 1,400.00 $ 80.00 i $ 15,400.00 ' $ 516.00 3 EXTRA DEPTH OF 4' DIA. MH 4 8' DIP OUTSIDE DROP CONNECTION (0-2') 1.00 EA $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 5 EXTRA DEPTH 8' DIP OUTSIDE DROP CONNECTION 6.97 LF $ 50.00 $ 348.50 $ 50.00 $ 348.50 $ 100.00 $ 697.00 $ 100.00 $ 697.00 6 4' ON 8' PVC, C-900 WYE BRANCH 7.00 EA $ 350.00 ' $ 2,450.00 $ 350.00 $ 2,450.00 $ 275.00 $ 1,925.00 $ 275.00 $ 1,925.00 7 4' PVC, C-900 SAN. SEW. SERVICE PIPE 66.00 6,160.00 1,511.00 LF SF LF LF EA $ 15.00 $ 4.00 $ 990.00 $ 15.00 $ 990.00 $ 15.00 $ 990.00 $ 15.00 $ 990.00 8 4' RIGID POLYSTYRENE INSULATION ' $ 24,640.0_0_ __ $ 3,022.00 $ 4.00 $ 24,640.00 $ 3,022.00 $ 1.85 $ 0.55 $ 11,396.00 $ 831.05 $ 1.85 $ 0.55 $ 11,396.00 $ 9 TELEVISE SANITARY SEWER MAINS _ $ 2.00 $ 5.00 $ 200.00 $ 2,000.00 $ 2.00 10 11 REMOVE 24' CMP STORM PIPE 12.00 , $ 60.00 $ 5.00 $ 60.00 $ 10.00 $ 120.00 $ 700.00 $ 5,000.00 $ 10.00 _831.05 $ 120.00 REMOVE CATCH BASIN/MANHOLE 2.00 $ 400.00 $ 200.00 $ 400.00 $ 350.00 $ 2,500.00 $ 350.00 $ 700.00 12 CURB OPENING CATCH BASIN (MnDOT 4021E1_ 2.00 12.00 EA LF $ 4,000.00 $ 2,000.00 $ 4,000.00 $ 2,500.00 $ 5,000.00 13 24' CMP STORM SEWER PIPE $ 10.00 $ 120.00 $ 10.00 $ 120.00 $ 25.00 $ 300.00 $ 25.00 $ 300.00 14 CONNECT TO EXISTING STORM SEWER PIPE 3.00 EA $ 200.00 $ 600.00 $ 200.00 $ 600.00 $ 450.00 $ 1,350.00 $ 450.00 $ 1,350.00 15 REMOVE BITUMINOUS PAVEMENT 340.00 SY$ 3.00 $ 1,020.00 $ 1,600.00 $ 850.00 $ 1,400.00 $ 25.00 $ 5,000.00 $ 450.00 $ 3.00 $ 1,020.00 $ 5.00 $ 1,700.00 $ 5.00 $ 1,700.00 16 AGGREGATE BASE CLASS 5 160.00 TN $ 10.00 $ 10.00 $ 1,600.00 $ 15.00 $ 2,400.00 $ 15.00 $ 2,400.00 _17 18 2350 TYPE LV 2 OR 3 NON WEAR. COURSE 25.00 TN $ 34.00 $ 34.00 $ 850.00 $ 93.50 $ 2,337.50 $ 93.50 $ 2,337.50 - 2350 TYPE LV 4 WEARING COURSE 35.00 TN $ 40.00 $ 2.50 $ 2.00 $ 40.00 $ 1,400.00 $ 25.00 $ 9.3.50 $ 3.68 $ 2.86 $ 3,272.50 $ 36.80 $ 93_.50 $ 3.68 $ 3,272.50 �$ 36.80 19 20 CRS -1 BITUMINOUS MATERIAL FOR TACK 10.00 GA $ 2.50 SODDING 2,500.00 SY $ 2.00 $ 5,000.00 $ 7,150.00 $ 2.86 $ 7,150.00 21 SILT FENCE 150.00 LF $ 3.00 $ 3.00 $ 450.00 $ 3.00 $ 450.00 $ 3.00 $ 450.00 SUBTOTAL $ 104,884.50 $ 104,884.50_ $ 278,982.00 _ $ 90,727.30 $ 257,373.50 $ 90,727.30 $ 257,373.50 GRAND TOTAL $ 278,982.00 J CITY OF LINO LAKES TWILIGHT ACRES/TWILIGHT ACRES 2ND UTILITY IMPROVEMENTS COMMISSION NO. 12278-02 BIDS OPENED: September 7, 2001 10:00 AM 'DENOTES ERROR IN BIDDERS CALCULATION ITEM NO. DESCRIPTION QUANTITY UNIT TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED ENGINEERS -ARCHITECTS -PLANNERS TABULATION OF BIDS PENN CONTRACTING, INC. Base Bid Alternate Bid UNIT TOTAL UNIT TOTAL PRICE AMOUNT PRICE AMOUNT KENKO, INC. Base Bid Alternate UNIT TOTAL UNIT PRICE AMOUNT PRICE Bid TOTAL AMOUNT TWILIGHT ACRES 14.00 EA LF EA LF EA LF $ 350.00 $ 28.30 $ 4,900.00 $ 66,222.00 $ 350.00 $ 4,900.00 _ $ 35.00 $ 42.00 $ 490.00 $ 35.00 $ 490.00 1 2 CLEAR & GRUB TREE $ 98,280.00 $ 42.00 $ 98,280.00 8" PVC, C900 SANITARY SEWER 2,340.00 $ 28.30 $ 66,222.00 3 CONSTRUCT 4' DIA. MANHOLE TYPE 301(0 - 10' DEPTH) 12.00 14.70 1.00 7.26 $ 1,620.00 $ 19,440.00 $ 1,620.00 $ 19,440.00 $ 1,350.00 $ 160.00 $ 1,300.00 $ 16,200.00 $ 1,350.00 $ 16,200.00 4_ 5 EXTRA DEPTH OF 4' DIA. MH - 8" DIP OUTSIDE DROP CONNECTION (0-2') $ 170.00 $ 778.00 $ 2,499.00 $ 170.00 $ _ 2,499.00 $ 778.00 $ 2,352.00 $ 160.00 $ 2,352.00 $ 778.00 L$ 778.00 $ 1,300.00 $ 1,300.00 1,300.00 6 EXTRA DEPTH 8" DIP OUTSIDE DROP CONNECTION $ 110.00 $ 798.60 $ 110.00 $ 798.60 $ 50.00 $ 363.00 $ 50.00 $ 363.00 7 4' ON 8" PVC, C-900 WYE BRANCH 25.00 EA $ 249.00 $ 6,225.00 $ 249.00 $ 6,225.00 $ 275.00 $ 6,875.00 $ 275.00 $ 6,875.00 8 4" PVC, C-900 SAN. SEW. SERVICE PIPE 315.0 8,788.00 80.00 LF SF LF LF SY SY TN $ 12.00 $ 2.75 $ 7.50 $ 3,780.00 $ 12.00 $ 2.75 $ 3,780.00 $ 24,167.00 $ 12.00 $ 1.50 $ 3,780.00 $ 13,182.00 $ 12.00 $ 3,780.00 $ 1.50 $ 13,182.00 9 4" RIGID POLYSTYRENE INSULATION $ 24,167.00 10 11 TRENCH STABILIZATION ROCK $ 600.00 $ 7.50 $ 600.00 $ 10.00 $ 800.00 $ 10.00 $ 800.00 TELEVISE SANITARY SEWER MAINS 2,340.00 $ 0.50 $ 1,170.00 $ 0.50 $ 1,170.00 $ 0.50 $ 1,170.00 $ 0.50 $ 1,170.00 12 REMOVE CONCRETE DRIVEWAY 100.00 1,600.00 $ 3.00 $ 300.00 $ 3.00 $ 300.00 $ 20.00 $ 2,000.00 $ 6,400.00 $ 20.00 $ 2,000.00 13 14 REMOVE BITUMINOUS PAVEMENT $ 1.50 $ 2,400.00 $ 13,200.00 $ 1.50 $ 20.00 $ 2,400.00 $ 4.00 $ 12.00 , $ 4.00 $ 6,400.00 AGGREGATE BASE CLASS 5 660.00 $ 20.00 $ 13,200.00 $ 7,920.00 $ 12.00 $ 7,920.00 15 2350 TYPE LV 2 OR 3 NON WEAR COURSE 120.00 TN $ 120.00 $ 14,400.00 $ 120.00 $ 14,400.00 $ 105.00 $ 12,600.00 $ 105.00 $ 12,600.00 _ _ 16 17 18 2350 TYPE LV 4 WEARING COURSE 150.00 TN GA SY SY $ 120.00 $ 18,000.00 $ 120.00 $ 18,000.00 $ 105.00 $ 15,750.00 $ 105.00 $ 15,750.00 CRS -1 BITUMINOUS MATERIAL FOR TACK 55.00 $ 10.00 $ 35.00 $ 2.80 $ 550.00 $ 10.00 $ 550.00 $ 3,500.00 $ 10.00 $ 60.00 $ 550.00 $ 6,000.00 $ 10.00 $ 550.00 6" CONCRETE DRIVE 100.00 $ 3,500.00 $ 35.00 $ 60.00 $ 6,000.00 _ __ 19 SODDING 3,400.00 $ 9,520.00 $ 2.80 $ 9,520.00 $ 2.20 $ 7,480.00 $ 2.20 $ 7,480.00 20 SILT FENCE 60.00 LF $ 6.00 $ 360.00 $ 6.00 $ 360.00 $ 6.00 $ 360.00 $ 6.00 $ 360.00 SUBTOTAL $ 192,809.60 ' $ 192,809.60 $ 203,852.00 $ 203,852.00 $ 28.30 $ 42,761.30 $ 28.30 $ 42,761.30 $ 42.00 $ 63,462.00 $ 42.00 $ 63 462.00 TWILIGHT ACRES 2ND 1 8" PVC, C900 SANITARY SEWER 1,511.00 LF 2 CONSTRUCT 4' DIA. MANHOLE TYPE 30j0 - 10' DEPTH) 11.00 6.45 EA LF $ 1,600.00 $ 170.00 $ 17,600.00 $ 1,096.50 $ 1,600.00 $ 170.00 $ 17,600.00 $ 1,096.50 $ 1,350.00 $ 160.0 $ 14,850.00 �$ 1,032.00 $ 1,350.00 $ 160.00 $ 14,850.00 $ 1,032.00 3 EXTRA DEPTH OF 4' DIA. MH 4 5 8" DIP OUTSIDE DROP CONNECTION (0-2') EXTRA DEPTH 8" DIP OUTSIDE DROP CONNECTION 1.00 6.97 EA LF $ 778.00 $ 110.00 $ 778.00 $ 766.70 $ 778.00 $ 110.00 $ 778.00 $ 1,300.00 $ 50.00 $ 1,300.00 $ 1,300.00 $ 1,300.00 $ 766.70 $ 348.50 $ 50.00 $ 348.50 6 4' ON 8" PVC, C-900 WYE BRANCH 7.00 EA $ 249.00 $ -1,743.0 $ 249.00 $ 1,743.00 $ 275.00 , $ 1,925.00 $ 275.00 $ 1,925.00 7 4' PVC, C-90 SAN. SEW. SERVICE PIPE 66.00 LF $ 12.00 $ 792.00 $ 12.00 $ 792.00 $ 12.00 $ 792.00 $ 12.00 $ 1.50 $ 792.00 8 4" RIGID POLYSTYRENE INSULATION 6,160.00 SF $ 2.75 $ 16,940.00 $ 2.75 $ 16,940.00 $ 1.50 $ 9,240.00 $ 9,240.00 9 10 TELEVISE SANITARY SEWER MAINS 1,511.00 LF $ 0.50 $ 755.50 $ 0.50 $ 755.50 $ 0.50 $ _ 755.50 $ 240.00 ____ $ _ _ 0.50 $ 20.00 $ ___ _ 755.50 $ 240.00 _ REMOVE 24" CMP STORM PIPE 12.00 LF $ 6.00 $ 72.00 $ 6.00 $ 72.00 $ 20.00 11 REMOVE CATCH BASIN/MANHOLE 2.00 EA $ 200.00 $ 400.00 $ 200.00 $ 400.00 $ 250.00 $ 1,200.00 $ 35.00 $ 250.00 $ 500.00 $ 250.00 $ 500.00 12 CURB OPENING CATCH BASIN (MnDOT 4021E) 2.00 EA $ 2,400.00 $ 4,800.00 $ 2,400.00 $ 4,800.00 $ 2,400.00 $ 1,200.00 $ 2,400.00 13 14 24" CMP STORM SEWER PIPE CONNECT TO EXISTING STORM SEWER PIPE 12.00 3.00 LF EA SY $ 40.00 $ 500.00 $ 3.00 $ 480.00 $ 40.00 $ 500.00 $ 480.00 $ 1,500.00 $ 420.00 $ 750.00 $ 35.00 $ 250.00 $_ 420.00_ $ 1,500.00 $_ 750.0 - 15 REMOVE BITUMINOUS PAVEMENT 340.00 $ 1,020.00 $ 3.00 $ 1,020.00 $ 4.00 $ 1,360.00 $ 4.00 $ 1,360.00 16 AGGREGATE BASE CLASS 5 160.00 TN $ 22.00 $ 3,520.00 $ 22.00 $ 3,520.00 $ 12.00 $ 1,920.00 $ 12.00 $ 1,920.00 17 2350 TYPE LV 2 OR 3 NON WEAR. COURSE 25.00 TN $ 120.00 $ 3,000.00 $ 120.00 $ 3,000.00 $ 105.00 $ , . 2,625.00 $ 105.00 $ 2,625.00 18 2350 TYPE LV 4 WEARING COURSE 35.00 TN 1 120.00 $ 4,200.00 $ 120.00 $ 4,200.00 $ 105.00 , $ 3,675.00 $ 105.00 $ 3,675.0 19 CRS -1 BITUMINOUS MATERIAL FOR TACK 10.00 GA $ 10.00 $ 100.00 $ 10.00 $ 100.00 $ 10.00 $ 100.00 $ 10.00 $ 100.00 20 21 SODDING 2,500.00 SY $ 2.80 $ 6.00 $ 7,000.00 $ 2.80 $ 7,000.00 $ 900.00 $ 2.20 $ 6.00 $ 5,500.00 $ 900.00 $ 2.20 $ 5,500.00 SILT FENCE 150.00 LF $ 900.00 $ 6.00 $ 6.00 $ 900.00 SUBTOTAL $ 110,225.00 $ 110,225.00 $ 114,095.00 $ 114,095.00 GRAND TOTAL $ 303,034.60 $ 303,034.60 $ 317,947.00 $ 317,947.00 J J CITY OF LINO LAKES TWILIGHT ACRES/TWILIGHT ACRES 2ND UTILITY IMPROVEMENTS COMMISSION NO. 12278-02 BIDS OPENED: September 7, 2001 10:00 AM 'DENOTES ERROR IN BIDDERS CALCULATION ITEM NO. DESCRIPTION QUANTITY UNIT TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED ENGINEERS -ARCHITECTS -PLANNERS TABULATION OF BIDS ARGON CONSTRUCTION CO., INC. Base Bid Altemate Bid UNIT TOTAL UNIT TOTAL PRICE AMOUNT PRICE AMOUNT Base Bid UNIT TOTAL PRICE AMOUNT Alternate Bid UNIT TOTAL PRICE AMOUNT TWILIGHT ACRES 1 CLEAR & GRUB TREE 14.00 EA 2 8" PVC, C900 SANITARY SEWER 2,340.00 LF _ 3 .CONSTRUCT 4' DIA. MANHOLE TYPE 301(0 - 10' DEPTH) 12.00 EA 4 EXTRA DEPTH OF 4' DIA. MH 14.70 LF 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 8" DIP OUTSIDE DROP CONNECTION (0-2') EXTRA DEPTH 8" DIP OUTSIDE DROP CONNECTION 4" ON 8" PVC, C-900 WYE BRANCH 4" PVC, C-900 SAN. SEW. SERVICE PIPE 4' RIGID POLYSTYRENE INSULATION TRENCH STABILIZATION ROCK TELEVISE_SANITARY SEWER MAINS REMOVE CONCRETE DRIVEWAY REMOVE BITUMINOUS PAVEMENT AGGREGATE BASE CLASS 5 2350 TYPE LV 2 OR 3 NON WEAR COURSE 2350 TYPE LV 4 WEARING COURSE CRS -1 BITUMINOUS MATERIAL FOR TACK 6" CONCRETE DRIVE SODDING SILT FENCE 7.26 LF 25.00 EA 315.00 LF 8,788.00 SF 80.00 LF 2,340.00 LF _ 100.00 SY 1,600.00 SY 660.00 TN 120.00 TN 150.00 TN 55.00 GA 100.00 SY 3,400.00 SY 60.00 LF SUBTOTAL TWILIGHT ACRES 2ND 1 8" PVC, C900 SANITARY SEWER 1,511.00 LF 2 CONSTRUCT 4 DIA. MANHOLE TYPE 301(0 - 10' DEPTH) 11.00 EA 3 EXTRA DEPTH OF 4' DIA. MH 6.45 LF 4 8" DIP OUTSIDE DROP CONNECTION (0-2') 1.00 EA 5 EXTRA DEPTH 8' DIP OUTSIDE DROP CONNECTION 6.97 LF 6__ 4" ON 8' PVC, C-900 WYE BRANCH 7.00 EA 7 4' PVC, C-900 SAN. SEW. SERVICE PIPE 66.00 LF 8 4" RIGID POLYSTYRENE INSULATION 6,160.00 SF 9 TELEVISE SANITARY SEWER MAINS 1,511.00 LF 10_ REMOVE 24' CMP STORM PIPE 12.00 LF 11 REMOVE CATCH BASIN/MANHOLE 2.00 EA 12 CURB OPENING CATCH BASIN (MnDOT 4021E) 2.00 L EA 13. 24" CMP STORM SEWER PIPE 12.00 LF 14 CONNECT TO EXISTING STORM SEWER PIPE 3.00 EA `15 'REMOVE BITUMINOUS PAVEMENT 34.0.00 SY 16 AGGREGATE BASE CLASS 5 160.00 TN _17 2350 TYPE LV 2 OR 3 NON WEAR. COURSE 25.00 TN 18 2350 TYPE LV 4 WEARING COURSE 35.00 TN 19 CRS -1 BITUMINOUS MATERIAL FOR TACK 10.00 GA 20 SODDING 2,500.00 SY 21 SILT FENCE - 150.00 LF SUBTOTAL GRAND TOTAL $ 300.00 $ 4,200.00 $ 300.00 $ 4,200.00 $ 37.00 $ 86,580.00 $ 37.00 $ 86,580.00 $ 1,800.00 $ 21,600.00 $ 1,800.00 $ 21,600.00 $ 120.00 $ 1,764.00 $ 120.00 $ 1,764.00 $ 900.00 $ 900.00 $ 900.00 $ 900.00 $ 55.00 $ 399.30 $ 55.00 $ 399.30 $ 300.00 $ 7,500.00 $ 300.00 $ 7,500.00 $ 29.15 $ 9,182.25 $ 29.15 $ 9,182.25 $ 2.55 $ 22,409.40 $ 2.55 $ 22,409.40 $ 7.50 $ 600.00 $ 7.50 $ 600.00 $ 0.60 $ 1,404.00 $ 0.60 $ 1,404.00 $ 7.50 $ 750.00 $ 7.50 $ 750.00 $ 4.00 $ 6,400.00 $ 4.00 $ 6,400.00 $ 17.50 $ 11,550.00 $ 17.50 $ 11,550.00 $ 85.00 $ 10,200.00 $ 85.00 $ 10,200.00 $ 85.00 $ 12,750.00 $ 85.00 $ 12,750.00 $ 3.50 $ 192.50 $ 3.50 $ 192.50 $ 30.00 $ 3,000.00 $ 30.00 $ 3,000.00 1- $ $ 2.20 $ 7,480.00 $ 2.20 $ 7,480.00 $ 6.00 $ 360.00 $ 6.00 $ 360.00 $ 209,221.45 $ 209,221.45 $ 41.00 $ 61,951.00 $ 41.00 $ 61,951.00 $ 1,750.00 $ 19,250.00 $ 1,750.00 $ 19,250.00 $ 120.00 $ 774.00 $ 120.00 $ 774.00 $ 900.00 $ 900.00 $ 900.00 $ 900.00 $ 55.00 $ 383.35 $ 55.00 $ 383.35 $ 300.00 $ 2,100.00 $ 300.00 $ 2,100.00 $ 29.15 $ 1,923.90 $ 29.15 $ 1,923.90 $ _ 2.55 $ _ 15,708.00 $ 2.55 $ 15,708.00 $ 0.60 $ 906.60 $ 0.60 $ 906.60 $ 10.00 $ 120.00 $ 10.00 $ 120.00 $ 300.00 $ 600.00 $ 300.00 $ 600.00 $ 2,150.00 $ 4,300.00 $ 2,150.00 $ 4,300.00 $ 40.00 $ 480.00 $ 40.00 $ 480.00 $ 250.00 $ 750.00 $ 250.00 $ 750.00 $ 4.00 $ .1,360.00 $ 4.00 $ _ 1,360.00 $ 17.50 $ 2,800.00 $ 17.50 $ 2,800.00 $ 85.00 $ 2;125.00 $ 85.00 $ 2,125.00 $ 85.00 $ 2,975.00 $ 85.00 $ 2,975.00 $ 3.50 $ 35.00 $ 3.50 $ 35.00 $ 2.20 $ 5,500.00 $ 2.20 $ 5,500.00 $ 6.00 $ 900.00 $ 6.00 $ 900.00 $ 125,841.85 $ 125,841.85 $ 335,063.30 $ 335,063.30 $ $ $ $- $ $ $ $ $ $ $ $ $ $ s $ $- $ $ $ $ $ $ $ AGENDA ITEM 7C STAFF ORIGINATOR: John Powell, City Engineer COUNCIL MEETING DATE: September 10, 2001 TOPIC: Resolution No. 01-134, Receive Bids, Twilight Acres Sanitary Sewer Extension VOTE REQUIRED: Simple Majority BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on September 7, 2001. The results of the bid opening are presented below. Contractor Volk Sewer and Water, Inc. Penn Contracting, Inc. Kenko, Inc. Arcon Construction Co., Inc. Engineer's Estimate Amount of Bid $257,373.50 $303,034.60 $317,947.00 $335,063.30 $278,982.00 The low bid is approximately 8% below the Engineer's Estimate for this project. A copy of the bid tabulation is attached. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 01-134. 3. Not adopt Resolution No. 01-134. RECOMMENDATION: Option No. 2 - Staff recommends adoption of Resolution Number 01-134.