Loading...
HomeMy WebLinkAbout2002-129 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 02-129 RESOLUTION ACCEPTING FEASIBILITY REPORT AND CALLING FOR A PUBLIC HEARING — ELM STREET RECONSTRUCTION PROJECT. WHEREAS, pursuant to resolutions of the Council adopted May 14, 2001, a study has been prepared by the City Engineer, with reference to the improvement of Elm Street Reconstruction by constructing Street, storm sewer, sanitary sewer and watermain extensions, and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost-effective, and feasible, WHEREAS, the City proposes to assess the benefited property for all or a portion of the cost of the improvement, pursuant to Minnesota States, Chapter 429, and Chapter 8 of the Lino Lakes City Charter. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The report is hereby received by the City Council. 2. That a Public Hearing be held for the proposed street reconstruction, storm sewer, sanitary sewer, and water extensions. Adopted by the Lino Lakes City Council this 23rd of September, 2002. Joh J. B:'.eson, Mayor 6,L__ Ann Blair, City Clerk AGENDA ITEM 71 STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: September 23, 2002 TOPIC: Resolution No. 02-129, Accepting Feasibility Report and Calling for a Public Hearing, EIm Street Reconstruction. VOTE REQUIRED: Simple Majority BACKGROUND: Due to the deteriorating condition of EIm Street between Sunset Road and Grey Heron Drive, the City Council order a feasibility study for the reconstruction of the street. This segment of roadway is designated as a Municipal State Aid Street and serves as a minor collector within the City's Comprehensive Transportation Plan. In addition, some properties adjacent to and beyond Elm Street do not have access to sanitary sewer or water. Staff is currently working with the City Attorney defining the assessments that are being proposed for this project. The street reconstruction portion of the project will be funded mostly through Municipal State Aid. The study will be delivered to the City Council at the meeting Monday evening. The next step in the process will be to accept the feasibility study and hold a Public Hearing on the proposed improvements. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution No. 02-129, Accepting the Feasibility Report and Calling for a Public Hearing for the EIm Street Reconstruction project. RECOMMENDATION: Option No. 2 - Staff recommends that Resolution No. 02-129 be adopted.