HomeMy WebLinkAbout2002-130 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 02-130
RESOLUTION ACCEPTING FEASIBILITY REPORT AND CALLING FOR A PUBLIC
HEARING — 62nd STREET RECONSTRUCTION PROJECT.
WHEREAS, pursuant to resolutions of the Council adopted August 27, 2001, a study
has been prepared by the City Engineer, with reference to the improvement of 62nd
Street Reconstruction by constructing Street, storm sewer, sanitary sewer and
watermain extensions, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost-effective, and feasible,
WHEREAS, the City proposes to assess the benefited property for all or a portion of the
cost of the improvement, pursuant to Minnesota States, Chapter 429, and Chapter 8 of
the Lino Lakes City Charter.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. The report is hereby received by the City Council.
2. That a Public Hearing be held for the proposed street reconstruction, storm sewer,
sanitary sewer, and water extensions.
Adopted by the Lino Lakes City Council this 23rcjof September, 2002.
J. BefJ
Joh gesori, Mayor
Ann Blair, City Clerk
AGENDA ITEM 7J
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: September 23, 2002
TOPIC: Resolution No. 02-130, Accepting Feasibility Report and Calling for
a Public Hearing, 62nd Street Reconstruction.
VOTE REQUIRED: Simple Majority
BACKGROUND:
Due to the continued development and growth of the area increasing the traffic
on this roadway and the deteriorating condition of 62nd Street between Ware
Road and Red Maple Lane, the City Council order a feasibility study for the
reconstruction of the street. This segment of roadway is designated as a
Municipal State Aid Street and serves as a minor collector within the City's
Comprehensive Transportation Plan. In addition, some properties adjacent to
and beyond 62nd Street do not have access to sanitary sewer or water.
Staff is currently working with the City Attorney defining the assessments that are
being proposed for this project. The street reconstruction portion of the project
will be funded mostly through Municipal State Aid.
The study will be delivered to the City Council at the meeting Monday evening.
The next step in the process will be to accept the feasibility study and hold a
Public Hearing on the proposed improvements.
OPTIONS:
1. Return to staff for further review.
2. Adopt Resolution No. 02-130, Accepting the Feasibility Report and Calling for
a Public Hearing for the 62nd Street Reconstruction project.
RECOMMENDATION:
Option No. 2 - Staff recommends that Resolution No. 02-130 be adopted.