HomeMy WebLinkAbout2002-161 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 02-161
RESOLUTION ACCEPTING FEASIBILITY REPORT FOR 12th AVENUE/HOLLY
DRIVE STREET RECONSTRUCTION PROJECT.
WHEREAS, pursuant to resolutions of the Council adopted August 27, 2001, a study
has been prepared by the City Engineer, with reference to the improvement of 12th
Avenue/ Holly Drive Street Reconstruction by constructing Street, storm sewer, sanitary
sewer and watermain extensions, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost-effective, and feasible,
WHEREAS, the City proposes to assess the benefited property for all or a portion of the
cost of the improvement, pursuant to Minnesota States, Chapter 429, and Chapter 8 of
the Lino Lakes City Charter.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. The report is hereby received by the City Council.
Adopted by the Lino Lakes City Council this 28th d. of October, 2002.
Ann Blair, )ty CI
John Beron, Mayor
AGENDA ITEM 71
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: October 28, 2002
TOPIC: Resolution No. 02-161, Accepting Feasibility Report, 12th
Avenue/Holly Drive Street Reconstruction.
VOTE REQUIRED: Simple Majority
BACKGROUND:
Due to the continued development and growth of the area increasing the traffic
on this roadway and the deteriorating condition of 12th Avenue and Holly Drive
between Ash Street and Birch Street, the City Council order a feasibility study for
the reconstruction of the street. This segment of roadway is designated as a
Municipal State Aid Street and serves as a minor collector within the City's
Comprehensive Transportation Plan. In addition, some properties adjacent to
and beyond 62nd Street do not have access to sanitary sewer or water.
The street reconstruction portion of the project will be funded mostly through
Municipal State Aid. The utility extensions will be minimal at this time.
The study will be delivered to the City Council at the meeting Monday evening.
The next step in the process will be to accept the feasibility study for the
proposed improvements. Construction of these improvements is projected to
start in 2004.
OPTIONS:
1. Return to staff for further review.
2. Adopt Resolution No. 02-161, Accepting the Feasibility Report for the 12th
Avenue/Holly Drive Reconstruction project.
RECOMMENDATION:
Option No. 2 - Staff recommends that Resolution No. 02-161 be adopted.