Loading...
HomeMy WebLinkAbout2000-077 Council ResolutionCouncil Member t✓i N1%t adoption: introduced the following resolution and moved its CITY OF LINO LAKES RESOLUTION NO. 00-77 RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION OF PLANS AND SPECIFICATIONS — MAIN STREET TRUNK UTILITIES WHEREAS, a resolution of the City Council adopted the 24th day of July, 2000, fixed a date for a council hearing on the proposed improvement of Main Street by constructing trunk sanitary sewer and watermain. WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing was given, and the hearing was held earlier this evening, at which time all persons desiring to be heard were given an opportunity to be heard thereon, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The City Engineer, John Powell, is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Adopted by the Lino Lakes City Council this 28th •- of August, 2000. John+. Ber:eson, Mayor (4,LU /0-(7-0 -el Gaustad, CMC City Clerk The motion for adoption of the foregoing resolution was duly seconded by Council Member (ThOC t.L. and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: Whereupon said resolution was duly passed and adopted. CERTIFICATION I hereby certify that the above is a correct copy -of a resolution duly passed, adopted and approved by the City Council on August 28, 2000. tt0\11 faktal: Ry-Chel Gaustad, CMC City Clerk AGENDA ITEM 7J STAFF ORIGINATOR: John Powell, City Engineer COUNCIL MEETING DATE: August 28, 2000 TOPIC: PUBLIC HEARING, Main Street Trunk Utilities VOTE REQUIRED: 3/5 Vote required to close the hearing BACKGROUND: This feasibility report was prepared in response to a petition from the Bluebill Ponds subdivision. The Main Street Trunk Utilities project involves the extension of trunk sanitary sewer and watermain along Main Street from just west of Nancy Drive to Wood Duck Trail to serve Bluebill Ponds. On July 24, 2000, the City Council received the feasibility report for this project and set a date for a Public Hearing. The only change to the feasibility report is the schedule that has been revised to reflect Spring, 2001 construction. A copy of the revised schedule is attached. I will present the information contained in the feasibility report at the Public Hearing. OPTIONS: 1. Close the public hearing. 2. Continue the public hearing. RECOMMENDATION: Option No. 1 - Staff recommends dosing the public hearing.