HomeMy WebLinkAbout1998-114 Council ResolutionCouncil Member Bergeson introduced the following resolution and
•.- moved its adoption:
CITY OF LINO LAKES
RESOLUTION NO. 98-114
RESOLUTION ACCEPTING BIDS AND AWARDING CONTRACTS FOR BID
PACKAGE NO. 2, THE CIVIC COMPLEX
WHEREAS, pursuant to an advertisement for bids for structural steel (erection only),
asphalt paving, concrete and masonry, miscellaneous metals (material only), casework,
general construction, roofing, aluminum windows and doors, drywall, tilework,
acoustical ceilings/wall panels, flooring, painting, metal lockers, partitions, mechanical,
electrical and fire protection for the Civic Complex; bids were received, opened, and
tabulated according to law, and the following bids were received complying with the
advertisement:
Name: Amount of Bid
Asphaltic Paving
Midwest Asphalt $73,500.00
ACI 86,485.00
Blacktop Paving 128,571.00
Concrete & Masonry
Adolfson & Peterson 792,000.00
B&L Masonry 848,975.00
Axel H. Ohman 868,600.00
Crosstown Masonry 878,800.00
Miscellaneous Metals
Listul Industries 31,223.00
Premier Construction 86,657.00
Structural Steel - Erection
Listul Industries 58,364.00
Casework
Haldeman -Homme 180,050.00
Heebink Architectural 258,644.00
General Construction
Jorgenson Const. 969,500.00
Kellington Const. 975,000.00
Roofing
M.G. McGrath 572,018.00
Aluminum Windows/Doors
W.L. Hall Co. 278,480.00
Mulcahy 306,630.00
Empirehouse 317,858.00
R-Pro 325,400.00
Drywall
Olympic Wall Systems 454,600.00
Minuti Ogle Co. 488,800.00
Commercial Drywall 500,000.00
Bieglow Bros. 531,200.00
Custom Drywall 739,748.00
Tilework
Grazzini Bros. 58,725.00
Twin City Tile & Marble 66,550.00
Acoustical Ceilings/Walls
Twin City Acoustics 80,965.00
Ceilings Inc. 89,371.00
Architectural Sales of MN 89,800.00
Flooring
Floors by Becker 111,357.00
Re:Source of MN 118,280.38
Painting
Wasche Commercial Finishes 59,560.00
Julius B. Nelson & Sons 63,550.00
Swanson & Youngdale 68,460.00
Lockers
J&F Equipment 15,498.00
Wissota Supply 16,988.00
Partitions
Arch Spec 14,781.00
Mahin Walz 16,216.00
W.L. Hall 18,652.00
Mechanical
McGuire Mechanical 978,127.00 (Base bid with accepted deduct alternates)
Northland Mechanical 978,350.00 (Base bid with accepted deduct alternates)
Wenzel Mechanical 1,015,508.00
NewMech Co. 1,115,000.00
Area Mechanical 1,031,500.00
Newman Mechanical 1,039,000.00
S.B.S. Mechanical 1,050,000.00
Swanson Plumbing & Heating 1,203,424.00
Fire Protection
Arrow Sprinkler
Superior Fire Protection
Fire Guard Sprinkler
Midwest Fire Protection
Electrical
Gephart Electric
Wright Electric
Phasor Electric
Ridgedale Electric
J.W. Koehler
Mendota Electric
Bloomington Electric
116,152.00
167,025.00
169,600.00
196,792.00
587,900.00
683,600.00
714,000.00
735,000.00
789,000.00
818,626.00
829,000.00
AND WHEREAS, it appears that Midwest Asphalt is the lowest responsible bidder for
asphaltic paving; and
Adolfson & Peterson Construction is the lowest responsible bidder for concrete and
masonry; and
Listul Industries, Inc., is the lowest responsible bidder for structural steel - erection; and
Haldeman -Homme, Inc. is the lowest responsible bidder for casework; and
Jorgenson Construction is the lowest responsible bidder for general construction; and
M.G. McGrath, Inc. is the lowest responsible bidder for roofing; and
W.L. Hall Company, Inc. is the lowest responsible bidder for aluminum windows/doors;
and
Olympic Wall Systems is the lowest responsible bidder for drywall; and
Grazzini Brothers Company, Inc. is the lowest responsible bidder for tilework; and
Twin City Acoustics is the lowest responsible bidder for acoustical ceilings/wall panels;
and
Floors by Becker is the lowest responsible bidder for flooring; and
Wasche Commercial Finishes, Inc. is the lowest responsible bidder for painting; and
J&F Equipment, Inc. is the lowest responsible bidder for lockers; and
Arch Spec, Inc. is the lowest responsible bidder for partitions; and
McGuire Mechanical Services, Inc. is the lowest responsible bidder for mechanical; and
Arrow Sprinkler, Inc. is the lowest responsible bidder for fire protection; and
Gephart Electric, Inc. is the lowest responsible bidder for electrical.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. The Mayor and City Clerk are hereby authorized and directed to enter into the
contracts with the apparent lowest responsible bidders in the name of the City of Lino
Lakes for Bid Package No. 2 for the Civic Complex, according to the plans and
specifications therefore approved by the City Council and on file in the office of
Adolfson & Peterson, Inc., construction manager for the Civic Complex.
2. Adolfson & Peterson, Inc. is hereby authorized and directed to return forthwith to all
bidders the deposits made with their bids, except that the deposits of the successful bidder
and the next lowest bidder shall be retained until a contract has been signed.
Ad
ted by th
ncil of the City of Lino Lakes this 27th day of July, 1998.
ivan, Mayor
Ma7ilyn . Anderson, Clerk -Treasurer
The motion for the adoption of the foregoing resolution was duly seconded by Council
Member Lyden and upon vote being taken thereon, the following voted
in favor thereof: Bergeson, Dahl, Lyden, Neal, Sullivan.
The following voted against same: none.
Whereupon said resolution was declared duly passed and adopted.
CERTIFICATION
I hereby certify that the above is a correct copy of a resolution duly passed, adopted and
�-- approved by the City Council on July 27, 1998.
Qt s1. �O
arilyh G. Anderson, Clerk -Treasurer