Loading...
HomeMy WebLinkAbout1999-093 Council ResolutionCouncil Member Dahl introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 99 -93 RESOLUTION APPROVING PAYMENT 3 (FINAL) FOR THE 1998 WEAR COURSE AND TRAIL PAVING PROJECT WHEREAS, the construction of the 1998 Wear Course and Trail Paving Project has been completed by North Valley, Inc., and; WHEREAS, the one-year warranty period for this project will begin with the final payment. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. Payment Number 3 (final) in the amount of $22, total contract amount of $317,117.1. Adopted by the City Council this 13th d y Ry -Chef Gaustad, City Clerk 4.96 is approved for a 1999. an, Mayor The motion for adoption of the foregoing resolution was duly seconded by Council Member Lyden and upon vote being taken thereon, the following voted in favor thereofsullivan, Lyden, Dahl, Bergeson, Neal The following voted against same: NONE Whereupon said resolution was declared passed and adopted. CERTIFICATION I hereby certify that the above is a correct copy of a resolution duly passed, adopted and approved by the City Council Q rSeptember 13, 1999. - SAIL all I-tyhel Gaustad, City Clerk CONSTRUCTION PAY VOUCHER Estimate Voucher Number: 3 Date: OSM Project Number: 98045.00 Period Ending: Project: 98 WEAR & TRAIL PAVING, LINO LAKES LINO LAKES CITY OF LINO LAKES Contractor: NORTH VALLEY, INC 4105 85TH AVE NORTH BROOKLYN PARK MN 55443 June 30, 1999 June 30, 1999 Contract Date: Work Started: Completion Date: Work Completed: Original Contract Amount Total Additions Total Deductions Total Funds Encumbered Total Work Certified to Date Less Retained Percentage Less Previous Payments Total Payments Incl This Voucher Balance Carried Forward APPROVED FOR PAYMENT, THIS VOUCHER APPROVALS 235,414.00 39,535.27 0.00 274,949.27 0.00% 317,117.60 -42,168.33 317,117.60 0.00 294,252.64 22,864.96 ORR-SCHELEN-MAYERON & ASSOCIATES, INC. Pursuant to our field observation, as performed in accordance with our contract, and based on our professional opinion, materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is: 100% completed as of June 30, 1999. We herby recommend payment of this voucher. Signed: ce-,,« - nstruction Observer Signed: Proj-J nager/Engineer NORTH VALLEY, INC This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Contractor: North Valley, Inc. Signed By Date: July 20, 1999 Title Brad Schmidtbauer President CITY OF LINO LAKES Checked By: Approved for payment: Authorized Representative Date: Date: PAGE 1 Estimate Voucher Number: 3 OSM Project Number: for CITY OF LINO LAKES SCHEDULE A 98045.00 Item Spec No Description V OUCHEK ETAIL LIST Project: 98 WEAR & TRAIL PAVING, LINO LAKES CITY OF LINO LAKES PROJ. NO.: LINO LAKES Quantity Units Contract Contract Completed This Month Unit Price Total Price Quantity Total 1 2021.501 2 2105.501 3 2211.501 4 2232.501 5 2340.508 6 2357.502 7 2501.515 8 2501.515 9 2503.511 10 2503.511 11 0504.602 12 2506.522 13 2575.555 14 STD SPEC 15 STD SPEC MOBILIZATION COMMON EXCAVATION (PLAN QUANTITY) AGGREGATE BASE CLASS 5 1007. CRUSHED ROCK MILL BITUMINOUS SURFACE (1.5") TYPE 41 WEARING COURSE MIXTURE BITUMINOUS MATERIAL FOR TACK COAT 12" RC PIPE APRON 18" RC PIPE APRON 12" RC PIPE SEWER CLASS V 18" RC PIPE SEWER CLASS V ADJUST VALVE BOX CASTING ADJUST FRAME & RING CASTING TURF ESTABLISHMENT SUBGRADE CORRECTION BITUMINOUS CRACK SEALING TOTAL SCHEDULE A SUB -TOTAL 1 LUMP SUM 880 CU YD 1979 TON 3905 SQ YD 6288 TON 3270 GALLON 2 EACH 1 EACH 20 LIN FT 40 LIN FT 50 EACH 99 EACH 1 LUMP SUM 267 SQ YD 400 LIN FT 5,800.00 6.85 10.50 1.65 25.50 1.30 750.00 800.00 45.00 45.00 100.00 135.00 5,000.00 9.75 2.00 2 OF 4 5,800.00 6,028.00 20,779.50 6,443.25 160,344.00 4,251.00 1,500.00 800.00 900.00 1,800.00 5,000.00 13,365.00 5,000.00 2,603.25 800.00 $ 235,414.00 $ 235,414.00 Date: JUNE 30, 1999 Total To Date Quantity Total Price 0 0.00 1 0 0.00 530 0 0.00 1668.97 0 0.00 2647.63 257.96 6,577.98 8444.53 0 0.00 3585 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 49 0 0.00 108 .16 800.00 .8 0 0.00 285.44 0 0.00 0 5,800.00 3,630.50 17,524.19 4,368.59 215,335.52 4,660.50 0.00 0.00 0.00 0.00 4,900.00 14,580.00 4,000.00 2,783.04 0.00 $ 7,377.98 $ 277,582.33 $ 7,377.98 $ 277,582.33 VOUCHEK ETAIL LIST Estimate Voucher Number: 3 Project: 98 WEAR & TRAIL PAVING, LINO LAKES OSM Project Number: 98045.00 CITY OF LINO LAKES PROJ. NO.: for LINO LAKES CITY OF LINO LAKES CHANGE ORDER 1 Item Spec No Description Quantity Units Date: JUNE 30, 1999 Contract Contract Completed This Month Total To Date Unit Price Total Price Quantity Total Quantity Total Price 1 INSTALL 24" CULVERT (ARROWHEAD , 1 LUMP SUM 6,189.66 6,189.66 0 0.00 1 6,189.66 DRIVE) 2 TOPSOIL BORROW 89 CU YD 12.00 1,068.00 0 0.00 89 1,068.00 3 GRANULAR FOUNDATION 16.7 TON 10.50 175.35 0 0.00 16.7 175.35 4 GRANULAR BORROW 110.99 TON 8.00 887.92 0 0.00 110.99 887.92 5 EASEMENT GRADING 1 LUMP SUM 693.00 693.00 0 0.00 1 693.00 6 SEEDING 400 SQ YD 0.53 212.00 0 0.00 400 212.00 7 SODDING 1377 SQ YD 3.69 5,081.13 0 0.00 1377 5,081.13 8 REGRADE TRAIL 1 LUMP SUM 658.35 658.35 0 0.00 1 658.35 9 PREPARE BASKEBALL COURT 1 LUMP SUM 2,228.18 2,228.18 0 0.00 1 2,228.18 10 SUBCUT TRAIL IN WETLAND 1 LUMP SUM 12,710.26 12,710.26 0 0.00 1 12,710.26 11 PREPARE COURT & PLAY AREA 1 LUMP SUM 4,308.13 4,308.13 0 0.00 1 4,308.13 0 0.00 0.00 0 0.00 0 0.00 TOTAL CHANGE ORDER 1 $ 34,211.98 SUB -TOTAL $ 269,625.98 CHANGE ORDER 2 Item Spec No Description Quantity Units $ 0.00 $ 34,211.98 $ 7,377.98 $ 311,794.31 Contract Contract Completed This Month Total To Date Unit Price Total Price Quantity Total Quantity Total Price 1 STRIPING (SECOND AVENUE) 1 LUMP SUM 719.10 719.10 0 0.00 1 719.10 2 VALVE BOX REPAIRS 1 LUMP SUM 1,110.50 1,110.50 0 0.00 1 1,110.50 3 INFRA -SHIELD 1 LUMP SUM 3,493.69 3,493.69 0 0.00 1 3,493.69 TOTAL CHANGE ORDER 2 $ 5,323.29 SUB -TOTAL $ 274,949.27 3 OF 4 $ 0.00 $ 5,323.29 $ 7,377.98 $ 317,117.60 VOUCHER DETAIL LIST Estimate Voucher Number: 3 Project: 98 WEAR & TRAIL PAVING, LINO LAKES OSM Project Number: 98045.00 CITY OF LINO LAKES PROJ. NO.: for LINO LAKES CITY OF LINO LAKES GRAND TOTAL $ 274,949.27 4 OF 4 Date: JUNE 30, 1999 $ 7,377.98 $ 317,117.60