HomeMy WebLinkAbout2015-112 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 15-112
APPROVING PAYMENT NO. 2 AND FINAL FOR THE 2013 SURFACE WATER
MANAGEMENT PROJECT
WHEREAS, pursuant to resolution 13-99 of the Council adopted September 9, 2013, awarding
the contract for the 2013 Surface Water Management project to CW Houle, Inc.;
WHEREAS, a complete summary of costs are detailed in Payment No. 2 (Final);
NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota that
Payment Request No. 2 (Final) is approved for a final contract amount of $112,702.51.
BE IT FURTHER RESOLVED
Adopted by the Council of the City of Lino Lakes this 28 day of September, 2015.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Roeser and was duly seconded by Council Member Kusterman and upon
vote being taken thereon, the following voted in favor thereof:
Roeser, Kusterman, Rafferty, Stoesz, Reinert
The following voted against same:
none
ATTEST:
Julianne Bartell, City Clerk
CITY COUNCIL
AGENDA ITEM 6E
STAFF ORIGINATOR: Diane Hankee, City Engineer
MEETING DATE: September 28, 2015
TOPIC: Consider Resolution No. 15-112, Approving Payment No. 2 and
Final, 2013 Surface Water Management Project
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting council action to finalize the 2013 Surface Water Management project.
BACKGROUND
The 2013 Surface Water Management project approved contact amount is $107,698.00 and the
fmal payment of amount is $112,702.51. There was addition roadway patching needed to
complete the project. This project is funded through the annual Public Service — Streets budget.
RECOMMENDATION
Approve Resolution No. 15-112, Approving Payment No. 2 and Final, 2013 Surface Water
Management Project in the amount of $6,573.25 to C.W. Houle, Inc.
ATTACHMENTS
1. Resolution 15-112
2. Pay Request No. 2 & Final
WSB
AMMIONM
Associates, Inc.
Owner: City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014-1182
For Period: 11/19/2013 to 4/7/2015
Contractor: C. W. Houle, Inc.
1300 W County Road I
Shoreview, MN 55126
Pay Voucher
LINO - 2013 Surface Water Mgmt
Client Contract No.:
Project No.: 02029-57
Client Project No.:
Date: 4/7/2015
Request No.: 2 & FINAL
Project Summary
1
Original Contract Amount
$69,988.00
2
Contract Changes - Addition
$37,710.00
3
Contract Changes - Deduction
$0.00
4
Revised Contract Amount
$107,698.00
5
Value Completed to Date
$112,702.51
6
Material on Hand
$0.00
7
Amount Earned
$112,702.51
8
Less Retainage
$0.00
9
Subtotal
$112,702.51
10
Less Amount Paid Previously
$106,129.26
11
Liquidated Damages
$0.00
12
AMOUNT DUE THIS PAY VOUCHER NO. 2 & FINAL
$6,573.25
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS
BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT
TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER.
Recommended for Approval by:
WSB & Associates, Inc.
Approved by Contractor:
C. W. Houle, Inc.
Construction Observer:
Approved by Owner:
City of Lino Lakes
Specified Contract Completion Date: Date:
Comment:
Project Material Status
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
AREA 1 - FAIRMONT DRIVE
1
2021.501
MOBILIZATION
LUMP SUM
$1,380.00
1
1 0
$1,380.00
2
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$7.00
130
293.3 0
$2,053.10
3
2104.505
REMOVE CONCRETE VALLEY GUTTER
SQ YD
$15.00
10
5.3 0
$79.50
4
2104.511
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
$11.00
10
10 0
$110.00
5
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$7.00
80
22 0
$154.00
6
2451.507
GRANULAR FOUNDATION AND/OR BEDDING
TON
$38.00
10
0 0
$0.00
7
2503.541
12" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$36.00
110
104 0
$3,744.00
8
2503.602
CONNECT TO EXISTING STORM SEWER
EACH
$2,730.00
1
1 0
$2,730.00
9
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
LIN FT
$585.00
5
4.1 0
$2,398.50
10
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN G
EACH
$2,140.00
1
1 0
$2,140.00
11
2506.516
CASTING ASSEMBLY
EACH
$465.00
1
1 0
$465.00
12
2531.604
7" CONCRETE VALLEY GUTTER
SO YD
$77.00
10
5.3 0
$408.10
13
2550.604
PATCH
SQ YD
$49.00
130
293.3 0
$14,371.70
14
2563.601
TRAFFIC CONTROL
LUMP SUM
$635.00
1
1 0
$635.00
15
2575.501
SEEDING (INCL TOPSOIL & FERTILIZER)
ACRE
$3,100.00
0.02
0.034 0
$105.40
16
2575.502
SEED MIXTURE 240
POUND
$10.00
3
2.7 0
$27.00
17
2575.523
EROSION CONTROL BLANKETS CATEGORY 4
SQ YD
$9.00
60
165.9 0
$1,493.10
Totals For Section AREA 1 - FAIRMONT DRIVE:
$32,294.40
AREA 2 - SUNRISE ROAD
18
2021.501
MOBILIZATION
LUMP SUM
$1,380.00
1
1
0
$1,380.00
19
2104.501
REMOVE BITUMINOUS CURB
LIN FT
$6.00
20
18
0
$108.00
20
2104.505
REMOVE BITUMINOUS PAVEMENT
SO YD
$7.00
150
234.3
0
$1,640.10
21
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$7.00
220
222
0
$1,554.00
22
2104.602
SALVAGE AND REINSTALL MAILBOX
EACH
$100.00
1
3
0
$300.00
23
2451.507
GRANULAR FOUNDATION AND/OR BEDDING
TON
$38.00
10
0
0
$0.00
24
2503.541
12" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$36.00
170
162
0
$5,832.00
25
2503.602
CONNECT TO EXISTING STORM SEWER
EACH
$2,730.00
1
1
0
$2,730.00
26
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
LIN FT
$575.00
6
5.2
0
$2,990.00
27
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1
EACH
$1,970.00
1
1
0
$1,970.00
28
2506.516
CASTING ASSEMBLY
EACH
$465.00
1
1
0
$465.00
29
2535.501
BITUMINOUS CURB
LIN FT
$11.00
20
18
0
$198.00
30
2550.604
PATCH
SQ YD
$49.00
150
231.4
0
$11,338.60
31
2563.601
TRAFFIC CONTROL
LUMP SUM
$785.00
1
1
0
$785.00
32
2575.501
SEEDING (INCL TOPSOIL & FERTILIZER)
ACRE
$3,100.00
0.03
0.04
0
$124.00
33
2575.502
SEED MIXTURE 240
POUND
$10.00
5
3.2
0
$32.00
34
2575.523
EROSION CONTROL BLANKETS CATEGORY 4
SQ YD
$9.00
130
196.8
0
$1,771.20
Totals For Section AREA 2 - SUNRISE ROAD:
$33,217.90
AREA 3 - GLADSTONE DRIVE
35
2021.501
MOBILIZATION
LUMP SUM
$1,100.00
1
1
0
$1,100.00
36
2104.501
REMOVE PIPE CULVERTS
LIN FT
$16.00
70
70
0
$1,120.00
37
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$8.00
40
27.5
0
$220.00
38
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$7.00
70
62
0
$434.00
39
2105.601
SITE GRADING
LUMP SUM
$2,975.00
1
1
0
$2,975.00
40
2451.507
GRANULAR FOUNDATION AND/OR BEDDING
TON
$38.00
10
0
0
$0.00
41
2501.511
12" CM PIPE CULVERT
LIN FT
$33.00
80
82
0
$2,706.00
42
2501.515
12" CM PIPE APRON
EACH
$710.00
4
4
0
$2,840.00
43
2550.604
PATCH
SQ YD
$71.00
40
27.5
0
$1,952.50
44
2563.601
TRAFFIC CONTROL
LUMP SUM
$700.00
1
1
0
$700.00
45
2575.501
SEEDING (INCL TOPSOIL & FERTILIZER)
ACRE
$3,100.00
0.03
0.09
0
$279.00
46
2575.502
SEED MIXTURE 240
POUND
$10.00
5
7.2
0
$72.00
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity
to Date
Current
Quantity
Amount to
Date
47
2575.523
EROSION CONTROL BLANKETS CATEGORY 4
SQ YD
$9.00
150
433.9
0
$3,905,10
Totals For Section AREA 3 GLADSTONE DRIVE:
$18,303.60
Change Order 1
48
2021.501
MOBILIZATION
LUMP SUM
$2,000.00
1
1
0
$2,000.00
49
2104.501
REMOVE METAL CULVERT
LIN FT
$16.00
80
82
0
$1,312.00
50
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$8.00
60
93.1
12.5
$744.80
51
2105.501
COMMON EXCAVATION
CU YD
$16.00
350
350
0
$5,600.00
52
2360.505
BITUMINOUS PATCHING
SQ YD
$71.00
60
93.1
12.5
$6,610.10
53
2501.511
12" CM PIPE CULVERT
LIN FT
$33.00
50
103.36
0
$3,410.88
54
2501.515
12" CM PIPE APRON
EACH
$710.00
2
4.66
0
$3,308.60
55
2501.602
TRASH GUARD FOR 12" PIPE APRON
EACH
$175.00
2
0
0
$0.00
56
2575.523
EROSION CONTROL BLANKETS CATEGORY 3
SQ YD
$4.30
1450
1236.1
0
$5,315.23
57
2575.604
SEEDING, MIX 260 (INCL TOPSOIL, FERT, MULCH, DISC ANCHOR)
ACRE
$2,250.00
0.3
0.26
0
$585.00
58
2021.501
MOBILIZATION
LUMP SUM
$2,000.00
1
0
0
$0.00
59
2104.501
REMOVE METAL CULVERT
LIN FT
$16.00
30
0
0
$0.00
60
2105.501
COMMON EXCAVATION
CU YD
$16.00
300
0
0
$0.00
61
2575.523
EROSION CONTROL BLANKETS CATEGORY 3
SQ YD
$4.30
1350
0
0
$0.00
62
2575.604
SEEDING, MIX 260 (INCL TOPSOIL, FERT, MULCH, DISC ANCHOR)
ACRE
$2,250.00
0.3
0
0
$0.00
Totals For Change Order 1:
$28,886.61
Project Totals:
$112,702.51
Project Payment Status
Owner: City of Lino Lakes
Client Project No.:
Client Contract No.:
Project No.: 02029-57
Contractor: C. W. Houle, Inc.
Contract Changes
No.
Type
Date
Description
Amount
co1
Change
Order
10/14/2013
Change Order No. 1 for Area 4, Alternate and Design 1 - see Change Order
document for description
$37,710.00
Change Order Totals:
$37,710.00
Payment Summa
No.
From Date
To Date
Payment
Total
Payment
Retainage
Per
Payment
Total
Retainage
Total
Payment +
Retainage
Work
Certified Per
Payment
Total Work
Certified
1
10/11/2013
11/18/2013
$106,129.26
$106,129.26
$5,585.75
$5,585.75
$111,715.01
$111,715.01
$111,715.01
2 &
FINAL
11/19/2013
4/7/2015
$6,573.25
$112,702.51
($5,585.75)
$0.00
$112,702.51
$987.50
$112,702.51
Payment Totals:
$112,702.51
$0.00
$112,702.51
$112,702.51
Proiect Summary
Material On Hand:
Total Payment to Date:
Total Retainage:
Total Amount Earned:
$0.00
$112,702.51
$0.00
$112,702.51
Original Contract:
Contract Changes:
Revised Contract:
$69,988.00
$37,710.00
$107,698.00