HomeMy WebLinkAbout2015-125 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 15-125 RESOLUTION ACCEPTING BIDS, AND AWARDING A CONSTRUCTION CONTRACT, WELL NO. 6 PUMPHOUSE WHEREAS, pursuant to an advertisement for bids for the construction of Well No.6 Pumphouse, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Base Bid Alternate No. 1 Rice Lake Construction Group $756,400.00 $16,000.00 Magney Construction, Inc. $772,600.00 $30,000.00 Municipal Builders, Inc. Rejected Maertens-Brenney Construction Co. Rejected AND WHEREAS, it appears that Rice Lake Construction Group is the lowest responsible bidder. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Rice Lake Construction Group on behalf of the City of Lino Lakes in the Base Bid amount of $756,400.00 for the construction of the Well No. 6 Pumphouse Improvements according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidder the Bid Bonds made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. Adopted by the Council of the City of Lino Lakes this 26th day of October, 2015. The motion for the adoption of the foregoing resolution was introduced by Council Member Roeser and was duly seconded by Council MemberStopsz and upon vote being taken thereon, the following voted in favor there Roeser, Stoesz, Rafferty, Reine The following voted against same: none (Absent - Kusterman) ATTEST: u is e Bartell, Ci Cler Jeff Reine , /ryor CITY COUNCIL AGENDA ITEM 6G STAFF ORIGINATOR: Michael Grochala MEETING DATE: October 26, 2015 TOPIC: Resolution No. 15-125, Ordering Improvement, Accepting bids and Awarding a Construction Contract, Well No. 6 Pumphouse VOTE REQUIRED: 3/5 Vote Required INTRODUCTION Staff is requesting authorization to order the improvement, accept bids and award bids for the Well No. 6 Pumphouse. BACKGROUND Sealed bids were received and publically opened for the above -referenced project on Wednesday, October 21, 2015. A total of 4 bids were received. However, two of the bids were declared to be non -conforming because each bidder failed to acknowledge whether Alternate Bid Item No. 1 was additive or deductive to the base bid. Neither bid was the low bidder. The results of the bid opening are presented below. Contractor Base Bid Alternate No. 1 Rice Lake Construction Group $756,400.00 $16,000.00 Magney Construction, Inc. $772,600.00 $30,000.00 Municipal Builders, Inc. Rejected Maertens-Brenney Construction Co. Rejected City Council action is required to award a construction contract to the lowest responsible bidder. The low bid as submitted by Rice Lake Construction Group of Deerwood, Minnesota in the amount of $756,400.00. The Engineer's estimated construction cost for the project was $770,000.00. The bid package included an alternate bid item for a metal standing seam roof in lieu of a shingled roof. Based on the low bid received this would add an additional $16,000 to the project costs. It is the opinion of staff that the shingled roof is more uniform with surrounding residential construction and more cost effective over the life of the structure. Therefore staff is recommending award of only the base bid in the amount of $756,400. ...- The completion date for this project is August of 2016. RECOMMENDATION Staff recommends adoption of Resolution No. 15-125. ATTACHMENTS 1. Resolution No. 15-125 2. Engineer's Recommendation L. s Stantec Consulting Services Inc. a ntec 2335 Highway 36 West, St. Paul MN 55113 October 21, 2015 Honorable Mayor and City Council City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 Re: Well No. 6 Pumping Facility Project No. 193803008 Bid Results Dear Honorable Mayor and City Council: Bids were opened for the Project stated above on October 21, 2015. Transmitted herewith is a copy of the Bid Tabulation for your information and file. Copies will also be distributed to each Bidder once the Project has been awarded. There were a total of 4 Bids. Two of the Bids were declared to be non -conforming, owing to the fact that each Bidder failed to indicate whether Alternate Bid Item No. 1 was additive or deductive to the Base Bid. Assuming their Alternate Bid amount was deductive; neither Bidder could have become the low Bidder. An Alternate Bid Item (No. 1) was included on the Bid Form. This Alternate provided for a metal standing seam roof in lieu of a shingled roof. In consultation with Lino Lakes Staff, it was agreed, and we concur, that the appropriate roof covering treatment should be shingles to match the residential construction surrounding Pumphouse No. 6. We also believe that the Low Bidders add of $16,000.00 would not be the most cost effective choice over the life of the Pumphouse building. The following table summarizes the results of the Bids received: Contractor Total Base Bid Low Rice Lake Construction Group $756,400.00 #2 Magney Construction, Inc. $772,600.00 #3 Municipal Builders, Inc. Rejected #4 Maertens-Brenney Construction Company Rejected Therefore, the low Bidder on the Project was Rice Lake Construction Group with a Total Base Bid Amount of $756,400.00 The Bid amount compares to the Engineer's Opinion of Probable Costs of $780,000. These Bids have been reviewed and found to be in order. nasion with community in mind October 21, 2015 Page 2 of 2 Reference: Bid Results Well No. 6 Pumping Facility If the City Council wishes to award the Project to the low Bidder, then Rice Lake Construction Group should be awarded the Project on the Total Base Bid Amount of $756,400.00. Should you have any questions, please feel free to contact me at (651) 967-4611 Sincerely, STANTEC CONSULTING SERVICES INC. Kurt B. Johnson, P copy: Jeff Karlson Michael Grochala Rick DeGardner Tim Hillesheim Enclosure Design with commumind