HomeMy WebLinkAbout2015-134 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 15-134 APPROVING PAYMENT NO. 9 AND FINAL FOR THE CONSTRUCTION OF WELL NO. 6 WHEREAS, pursuant to Resolution No. 14-126, adopted on October 27, 2014, the City Council, awarded the contract for the Construction of Well No. 6 to Keys Well Drilling Co.; and WHEREAS, the contractor has satisfactorily completed the improvement and a complete summary of costs are detailed in Payment No. 9 (Final); NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes that the work completed under said contract is hereby accepted and approved; and BE IT FURTHER RESOLVED, that Payment Request No. 9 (Final) is hereby approved for a final contract amount of $140,312.00. Adopted by the Council of the City of Lino Lakes this 23`d day of November, 2015. The motion for the adoption of the foregoing resolution was introduced by Council Member Kusterman and was duly seconded by Council Member Roeser and upon vote being taken thereon, the following voted in favor thereof: Kusterman,Roeser, Rafferty, Stoesz, Reinert The following voted against same: none ATTEST: is e Bartell, City CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Diane Hankee, City Engineer MEETING DATE: November 23, 2015 TOPIC: Consider Resolution No. 15-134, Approving Payment No. 9 and Final, for the Construction of Well No. 6 VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting council consideration to Approve Payment No. 9 and Final, for the Construction of Well No. 6. BACKGROUND The contract for construction of Well No. 6 was in the amount of $176,950.00 and the final payment earned by the contractor for this project is $140,312.00. The fmal payment to Keys Well Drilling Co. is in the amount of $7,015.60. RECOMMENDATION Approve Resolution No. 15-134, Approving Payment No Payment No. 9 and Final, for the Construction of Well No. 6 in the amount of $7,015.60 to Keys Well Drilling Co. ATTACHMENTS 1. Resolution 15-134 2. Pay Request No. 9 & Final Stantec City Copy Owner: City of Lino Lakes, 600 Town Center Pkwy., Lino Lakes, MN 55014 Date: August 24, 2015 For Period: 7/23/2015 to 8/18/2015 Request No: 9 -Final Contractor: Keys Well Drilling Co., 1156 Homer St., St. Paul, MN 55116 CONTRACTOR'S REQUEST FOR PAYMENT CONSTRUCTION OF WELL NO. 6 STANTEC PROJECT NO. 193802886 SUMMARY 1 Original Contract Amount $ 176,950.00 2 Change Order - Addition 3 Change Order - Deduction $ 0,00 4 Revised Contract Amount 5 Value Completed to Date 6 Material on Hand 7 Amount Earned 8 Less Retainage 0% 9 Subtotal 10 Less Amount Paid Previously 11 Liquidated damages - 12 AMOUNT DUE THIS REQUEST FOR PAYMENT NO. 9 -Final $ $ 0,00 $ 176,950.00 $ 140,312.00 $ 0.00 $ 140,312.00 $ 0.00 $ 140,312.00 Recommended for Approval by: STANTEC 4AI-6 Approved by Contrci' or: Approved by Owner: KEYS WELL DRILLING CO. CITY OF LINO LAKES Specified Contract Completion Date: ti/ \( /f/ 193802886 R E Q9 -F i n a 1. xl s m 133, 296.40 0.00 7,015.60 Date: // /s` Contract Unit Current Quantity Amount No. Item Unit Quantity Price Quantity to Date to Date BASE BID: 1 FURNISH, INSTALL., MAINTAIN AND REMOVE SAFETY FENCING LF 400 1.00 432 $432.00 2 FURNISH, INSTALL, AND MAINTAIN SILT FENCE LE 400 4.00 200 S800.00 3 MOBILIZATION LS 1 19000.00 1 $19,000.00 4 DRILL4-INCH PILOT TEST/OBSERVATION WELL (WELL TO REMAIN) LF 300 15.00 $0.00 5 DRIIL/DRIVE 24" CASING BY CABLE TOOL METHOD LF 90 200.00 92 $18,400.00 6 DRILL 23" OPEN HOLE BY CABLE TOOL METHOD LF 200 100.00 206 $20,600.00 7 FURNISH AND INSTALL 18" CASING LF 140 75.00 133 $9,975.00 8 FURNISH, INSTALL, AND REMOVE PEA ROCK IN OPEN HOLE FOR GROUTING 18-INCH LINER CASING CY 18 100.00 29 $2,900.00 9 GROUT ANNULAR SPACE BETWEEN CASINGS AND CASING AND BORE HOLE WITH NEAT CEMENT GROUT CY 20 450.00 7.5 $3,375.00 10 EXPLOSIVES FOR DEVELOPMENT LB 300 30.00 200 $6,000.00 11 BAIL LOOSENED ROCK FROM DEVELOPMENT CY 500 75.00 270 $20,250.00 12 FURNISH, INSTALL, AND REMOVE AIR DEVELOPMENT EQUIPMENT LS 1 5000.00 1 $5,000,00 13 AIR DEVELOPMENT HR 80 210.00 86 $18,060.00 14 FURNISH, INSTALL, AND REMOVE TEST PUMP LS 1 5000.00 1 $5,000.00 15 FURNISH, INSTALL, AND REMOVE DISCHARGE PIPING LF 150 5.00 220 $1,100.W 16 TEST PUMPING HR 100 140.00 38 $5,320.00 17 TELEVISE THE WELL AND PROVIDE COLOR VIDEO RECORD LS 1 1400.00 1 $1,400.00 18 GAMMA LOG THE WELL AND PROVIDE A GRAPHICAL REPORT LS 1 800.00 1 $800.00 19 SAMPLE, ANALYZE, AND PROVIDE WATER QUALITY TESTING REPORT LS 1 900.00 1 $900.00 20 CLEANUP LS 1 1000.00 1 $1,000.00 TOTAL BASE BID: $140,312.00 TOTAL BASE BID: $140,312.00 TOTAL WORK COMPLETED TO DATE $140,312.00 193802866REQ9•Final.xls PROJECT PAYMENT STATUS OWNER CITY OF LINO LAKES STANTEC PROJECT NO, 193802886 CONTRACTOR KEYS WELL DRILLING CO. CHANGE ORDERS No. Date Description Amount Total Change Orders PAYMENT SUMMARY No. From To Payment Retainage Completed 1 12/01/2014 12/19/2014 17,377.40 914.60 18,292.00 2 12/19/2014 01/17/2015 6,080.00 1,234.60 24,692.00 3 01/17/2015 02/16/2015 9,880.00 1,754.60 35,092.00 4 02/16/2015 04/20/2015 27,573.75 3,205.85 64,117.00 5 04/20/2015 05/20/2015 23,313.00 4,432.85 88,657.00 6 05/20/2015 06/19/2015 13,338.00 5,134.85 102,697.00 7 06/19/2015 07/23/2015 24,595.50 6,429.35 128,587.00 8 07/23/2015 08/18/2015 11,138.75 7,015.60 140,312.00 9 -Final 07/23/2015 08/18/2015 7,015.60 140,312.00 Material on Hand Total Payment to Date $140,312.00 Original Contract $176,950.00 Retainage Pay No. 9 -Final Change Orders Total Amount Earned $140,312.00 Revised Contract $176,950.00 193802886REQ9-Final.xls m