Loading...
HomeMy WebLinkAbout2015-150 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 15-150 APPROVING THE JOINT POWERS AGREEMENT WITH ANOKA COUNTY FOR THE ROUNDABOUT CONSTRUCTION PROJECT AT THE INTERSECTION OF COUNTY STATE AID HIGHWAY 12 (109TH AVE. NE/APOLLO DR.) AND COUNTY ROAD 53 (SUNSET AVE.) WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to construct a roundabout at the intersection of County State Aid Highway (CSAH) 12 (109th Ave. NE / Apollo Drive) and County Road (CR) 53 (Sunset Ave.); and WHEREAS, said parties mutually agree that the intersection of CSAH 12 and CR 53 is in need of improvement; and WHEREAS, the County has prepared preliminary design plans for the construction of a roundabout at the intersection of CSAH 12 and CR 53 in accordance with Anoka County and the Minnesota Department of Transportation standards to a staff -approved layout condition; and WHEREAS, Anoka County has jurisdiction over CSAH 12 and CR 53; and WHEREAS, the parties agree that it is in their best interest that the cost of the roundabout project be shared; and WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint powers agreements for the joint exercise of powers common to each. WHEREAS, the City of Lino Lakes and Anoka County desire to enter into a Joint Powers Agreement for the Roundabout Construction Project at the Intersection of County State Aid Highway 12 (109th Ave. NE / Apollo Drive) and County Road 53 (Sunset Ave.). NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes approves the Joint Powers Agreement with Anoka County for the Roundabout Construction Project at the Intersection of County State Aid Highway 12 (109th Ave. NE / Apollo Drive) and County Road 53 (Sunset Ave.). Adopted by the Council of the City of Lino Lakes this 14th day of December, 2015. The motion for the adoption of the foregoing resolution was introduced by Council Member Kusterman and was duly seconded by Council Member R op s e r upon vote being taken thereon, the following voted in favor thereof: Kusterman, Roeser, Stoesz, Rafferty, Reinert and The following voted against same: none ATTEST: WIPP • i , nne Bartell, CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Diane Hankee, City Engineer MEETING DATE: December 14, 2015 TOPIC: Consider Resolution No. 15-150 Approving the Joint Powers Agreement with Anoka County for the Roundabout Construction Project at the Intersection of County State Aid Highway 12 (109th Ave. NE / Apollo Drive) and County Road 53 (Sunset Ave.) VOTE REQUIRED: 3/5 Vote Required INTRODUCTION Staff is requesting approval of the Joint Powers Agreement (JPA) between the City of Lino Lakes and Anoka County for the Roundabout Construction Project at the Intersection of County State Aid Highway 12 (109th Ave. NE / Apollo Drive) and County Road 53 (Sunset Ave.). BACKGROUND Anoka County is planning improvements to the intersection of County State Aid Highway 12 (109th Ave. NE / Apollo Drive) and County Road 53 (Sunset Ave.) in 2016. The improvements include the construction of a roundabout, storm water quality improvements and appurtenant work. The overall project cost is estimated to be $1,300,000. The improvement project requires the execution of a Joint Powers Agreement between the City and County, which is attached. The City's financial responsibility for the project is for lighting, bituminous/concrete walks and storm water from local drainage for a total estimated amount of $80,000. Funding for the project will be through the City's Municipal State Aid (MSA) account and the City's surface water management fund, for drainage costs that may not be eligible for MSA funding. RECOMMENDATION Staff is recommending adoption of Resolution No. 15-150 approving the Joint Powers Agreement with Anoka County for the Roundabout Construction Project at the intersection of County State Aid Highway 12 (109th Ave. NE / Apollo Drive) and County Road 53 (Sunset Ave.). ATTACHMENTS 1. Resolution 15-150 2. Joint Powers Agreement 3. Layout Anoka County Contract No. C0004687 JOINT POWERS AGREEMENT FOR THE ROUNDABOUT CONSTRUCTION PROJECT AT THE INTERSECTION OF COUNTY STATE AID HIGHWAY 12 (109TH AVE. NE/APOLLO DR.) AND COUNTY ROAD 53 (SUNSET AVE.) IN THE CITIES OF LINO LAKES, MN AND BLAINE, MN (ANOKA COUNTY SP 002-612-013) (CITY OF LINO LAKES SAP ***-***-***) THIS AGREEMENT is made and entered into this 14th day of December, 2015 by and between the County of Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue, Anoka, Minnesota 55303, hereinafter referred to as "County", and the City of Lino Lakes, 600 Town Center Parkway, Lino Lakes, MN 55014, hereinafter referred to as "City." WITNESSETH WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to construct a roundabout at the intersection of County State Aid Highway (CSAH) 12 (109th Ave. NE / Apollo Drive) and County Road (CR) 53 (Sunset Ave.); and WHEREAS, said parties mutually agree that the intersection of CSAH 12 and CR 53 is in need of improvement; and WHEREAS, the County has prepared preliminary design plans for the construction of a roundabout at the intersection of CSAH 12 and CR 53 in accordance with Anoka County and the Minnesota Department of Transportation standards to a staff -approved layout condition; and WHEREAS, Anoka County has jurisdiction over CSAH 12 and CR 53; and WHEREAS, the parties agree that it is in their best interest that the cost of the roundabout project be shared; and WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint powers agreements for the joint exercise of powers common to each. NOW, THEREFORE, IT IS MUTUALLY STIPULATED AND AGREED: I. PURPOSE The parties have joined together for the purpose of constructing a roundabout at the intersection of CSAH 12 and CR 53 as described in the preliminary design plans. The County project number for the reconstruction is SP 002-612-013. Said engineering plans are filed in the office of the Anoka County Highway Department and incorporated herein by reference. The parties to this Joint Powers Agreement (JPA) agree in principle that construction of County State \'" Aid Project No. 002-612-013 roundabout is in the best interest of the traveling public and that the Preliminary Layout as shown in Exhibit "A" defines the preliminary design of the Project. 1 It is agreed that the Exhibit "A" Layout dated November 30, 2015 has been reviewed and accepted by _ the parties and is suitable for preparation of final construction documents. Any significant changes made hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties as an amendment to this JPA. These same changes will require a change in the cost share to include any additional design engineering costs that may occur. II. METHOD The County shall construct Anoka County Project SP 002-612-013, in conformance with proposed engineering plans and specifications. IMPROVEMENTS It is agreed by the parties that in 2016 the intersection of CSAH 12 and CR 53 will be reconstructed into a single lane roundabout. The roadways will have a concrete median and bituminous walk to the extent shown in "Exhibit A." Improvements include but are not limited to: roadway widening, roundabout construction, lighting, turn lanes, shoulders, curb and gutter, and bituminous walk. The costs of these improvements have been estimated for this agreement and will be finalized after bids have been received. These costs will be shared by the County and the City, but only as provided in this agreement. RIGHT OF WAY: The parties agree that the County will acquire all necessary right-of-way and easements for the Project. It is agreed by the parties that all necessary right of way and easements will be in legal possession of the `,,, County prior to acceptance of bids for the Project. Any City -owned property or easements required for the construction will be conveyed to the County at no cost. The County will work with the City to facilitate any transfer of City -owned property or easements necessary to complete the Project. DRAINAGE: The City shall pay for a percentage of actual cost of the storm sewer system. The City portion of the cost is based on contributing flow through the storm sewer system determined by the product of contributing area and runoff coefficient for the project area. BITUMINOUS WALK: The parties agree that the construction of the bituminous sidewalk around the roundabout is a City cost per the Exhibit C "Cost Sharing Agreement." This walk location has been agreed to by the City. If this location changes in the future, the additional costs associated with this change will be the responsibility of the City. The parties understand that the cost for the bituminous walk includes: bituminous surfacing, aggregate base, excavation (including muck excavation), borrow material (granular and topsoil), and turf establishment. The parties agree that the County will pay for the design of the walk and any removal items, with the exception of soils, required to construct the bituminous walk. 2 L TRAFFIC CONTROL: The parties understand and agree that the portions of CSAH 12 and CR 53 will be closed to thru traffic during construction. The parties agree and understand the cost share for traffic control for the city shall be a prorated share based on the City project cost divided by the total project cost. DRIVEWAYS: The parties agree that all driveways affected by the Project will be reconstructed in kind at 100% project cost with the cost of any upgrades requested by the City, including concrete aprons, to be the sole responsibility of the City. LANDSCAPING/STREETSCAPING: The parties agree that if the City wishes to include landscaping or streetscape features in the project, they shall be designed in accordance with Anoka County Highway Department Landscape/Streetscape Guidelines. The City shall supply the signed plan sheets and specifications for the proposed landscape/streetscape. The total cost of the design as well as the construction cost above standard median/roundabout cost will be at the expense of the City. All construction documents must be submitted to the County by December 15, 2015. After construction and the expiration of any maintenance bond, ongoing maintenance of any landscaping or streetscaping will be the sole responsibility of the City. LIGHTING: The parties agree that the roundabout intersection lighting costs will be shared per the standard County cost share for traffic signals, with the City paying for 25 % of the roundabout lighting. If the City would like additional lighting on the Project, this would be 100% City cost. Lighting will be installed in accordance with the City lighting ordinance and will contain LED fixtures wherever possible and provided such lighting is within the budget for the Project. UTILITIES: The parties agree that the Exhibit "A" Layout does not include specific proposed utility locations and that the City does not have any public sewer or water lines in the vicinity of the Project. Therefore, the City will not be responsible for any costs related to utilities. PERMITS: The parties agree that the County will secure all necessary permits for this Project, including any permits required by the City. The City agrees to coordinate with the County in securing any permits required by the Rice Creek Watershed District (RCWD), city permits, as well as any other permits that may be required. The County also requests that the City inform the County of any ordinances or city regulations that affect construction at the time of the signing of this JPA. (e.g. setbacks, tree clearing ordinances, or any other city ordinances.) 3 COSTS The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, normal engineering costs and equipment rental required to complete the work, shall constitute the actual "construction costs" and shall be so referred to herein. "Estimated costs" are good faith projections of the costs that will be incurred for this project. Actual costs will vary and those will be the costs for which the relevant parties will be responsible. The estimated construction cost of the total project is $1,123,197.02. The total estimated construction cost to the City is $79,676.73 The City participation in construction engineering will be at a rate of eight percent (8%) of their designated construction share of $79,676.73. The estimated cost to the City for construction engineering is $6,374.14. In summary, the total City share of this project is $86,050.87 (includes construction and construction engineering costs). Upon award of the contract, the City shall pay to the County, upon written demand by the County, ninety five percent (95%) of its portion of the cost of the project estimated at $81,748.33. Prior to billing, this estimate will be updated by the County to reflect the actual bid prices as awarded. An updated cost estimate shall be provided to the City at the time of billing. The City's share of the cost of the project shall include only construction and construction engineering expense and does not include engineering design and administrative expenses incurred by the County. Upon final completion of the project, the City's share of the construction cost will be based upon actual construction costs. If necessary, adjustments to the initial ninety five percent (95%) charged to the city will be made in the form of credit or additional charges to the City's share. Also, the remaining five percent (5%) of the City's portion of the construction costs shall be paid. IV. TERM This Agreement shall continue until terminated as provided hereinafter, but in no case shall this Agreement extend beyond one year after completion of the Project. V. DISBURSEMENT OF FUNDS All funds disbursed by the County or City pursuant to this Agreement shall be disbursed by each entity pursuant to the method provided by law. VI. CONTRACTS AND PURCHASES All contracts let and purchases made pursuant to this Agreement shall be made by the County in conformance to the State laws. VII. STRICT ACCOUNTABILITY A strict accounting shall be made of all funds and report of all receipts shall be made upon request by either party. Prior to City payment to the County, the County shall provide the City a copy of all cost participation documents submitted to MnDOT State Aid to assist the City in their application for MSA funding. 4 VIII. TERMINATION This Agreement may be terminated by either party at any time, with or without cause, upon not less than thirty (30) days written notice delivered by mail or in person to the other party. If notice is delivered by mail, it shall be deemed to be received two days after mailing. Such termination shall not be effective with respect to any solicitation of bids or any purchases of services or goods which occurred prior to such notice of termination. The City shall pay its pro rata share of costs which the County incurred prior to such notice of termination. IX. MAINTENANCE A. Maintenance of the completed storm sewer (except catch basins and catch basin leads) and detention basins (including ponds and their outlet structures and grit chambers/collectors) shall be the sole obligation of the City. B. Maintenance of the bituminous walks shall be the responsibility of the City. The City shall be responsible for general routine maintenance, such as, sweeping, clearing, plowing, trash removal and other incidental items and shall be responsible for long-term maintenance, such as bituminous overlays, crack sealing and replacement. The City may choose, in it's sole discretion, whether to plow any sidewalks. C. Maintenance of streetlights and cost of electrical power to the streetlights shall be the sole obligation of the City. X. NOTICE For purposes of delivery of any notices herein, the notice shall be effective if delivered to the County Administrator of Anoka County, 2100 Third Avenue, Anoka, Minnesota 55303, on behalf of the County, and to the City Administrator of the City of Lino Lakes, 600 Town Center Parkway, Lino Lakes, MN 55014, on the behalf of the City. XI. INDEMNIFICATION To the extent allowed by law, the City and County mutually agree to indemnify and hold harmless each other from any claims, losses, costs, expenses or damages resulting from the acts or omissions of the respective officers, agents, or employees relating to activities conducted by either party under this Agreement, except any claims, losses, costs, expenses or damages resulting from the other party's negligence or willful misconduct. 5 XII. ENTIRE AGREEMENT REQUIREMENT OF WRITING It is understood and agreed that the entire agreement of the parties is contained herein and that this Agreement supersedes all oral agreements and all negotiations between the parties relating to the subject matter thereof, as well as any previous agreement presently in effect between the parties to the subject matter thereof. Any alterations, variations, or modifications of the provisions of this Agreement shall be valid only when they have been reduced to writing and duly signed by the parties. IN WITNESS WHEREOF, the parties to this Agreement have hereunto set their hands on the dates written below. COUNTY OF ANOKA CITY OF LINO LAKES By: By: Rhonda Sivarajah, Chair Jeff Reinert Board of Commissioners Mayor Dated: Dated: ATTEST By: By: Jerry Soma Jeff Karlson County Administrator City Administrator Dated: Dated: RECOMMENDED FOR APPROVAL By: Douglas W. Fischer, P.E. County Engineer Dated: APPROVED AS TO FORM By: Dan Klint Assistant County Attorney Dated: 6 EXHIBIT "C" COST-SHARING AGREEMENT FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY USING COUNTY STATE AID FUNDS OR LOCAL TAX LEVY DOLLARS ITEMS COUNTY SHARE CITY SHARE Concrete Curb & Gutter 50% 50% Concrete Curb & Gutter for Median Construction 100% 0% Concrete Median 100% 0*1 Concrete Sidewalk 0% 100% Concrete Sidewalk Replacement 100% 0% Bikeways 0% 100% Bikeway Replacement 100%, 0% Unless existing trail not placed at edge of RAN Construction or Adjustment of Local Utilities 0% 100% Grading, Base and Bituminous 100% 0% Storm Sewer based on state aid letter*2 based on state aid letter*2 Driveway Upgrades 100%, in-kind 100%, of up -grades Traffic Signals, new & replacements (communities larger than 5,000) '/2 the cost of it's the cost of its legs of w/ State Aid approved SJR legs of the intersection the intersection plus '/2 the cost of the County legs of the intersection Traffic Signals, new & replacements (communities less than 5,000) 100% 0% w/ State Aid approved SJR Traffic Signal, w/o State Aid approved SJR 0% 100% EVP 0% 100% Engineering Services *3 *3 Right -of -Way 100%4 0% Street Lights 0% 100% Noise Walls 100%'5 0%*5 *1 The County pays for 100% of Standard Median Design such as plain concrete. If a local unit of government requests decorative median such as brick, stamped concrete, or landscaping, the local unit will pay the additional cost above the cost of standard median. *2 In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage cost shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow. *3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount of 8% of the construction costs paid by that agency. *4 In the event that the Township or City requests purchase of right-of-way in excess of those right-of-ways required by County construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right-of-way, in which case the Township or City may pay for that portion of the right-of-way. Acquisition of right-of-way for new alignments shall be the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with the County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing alignment. In addition, any costs, including right-of-way costs, incurred by the County because a Township or City did not acquire sufficient right-of-way during the platting process or redevelopment process as requested by the County shall be paid by the Township or City. *5 If previously notified, the City shall be responsible for future noise wall maintenance. Notification includes any letter to the agency indicating that noise will potentially be an issue in the future, likely received during the Plat Review Process. The County shall pay 100% of Standard Noise Wall Cost. If a local agency requests decorative noise walls, then the requesting agency will pay the additional cost above the cost of standard noise wall. Furthermore, should an agency request a noise wall to be built where not required by the applicable federal or state standard, the entire cost of the wall shall be borne by the requesting agency. 7 EXHIBIT B - ENGINEERS ESTIMATE - 08/27/2015 P:002 -612-130o umen5s\Road & Bridge Design \ estimate \02-612-13_SEQxIs 10/28/2015 STATE AID FUNDS ITEM DESCRIPTION UNIT TOTAL PROJECT OUANTn1E6 ESTEEATED ESTIMATE ANOKA COUNTY 002.131113 EST ors ROADWAY pKA Co., 3-01J mss 65304.00 CITY OF BLAINE -ROADWAY Esr OM CRY OF SIAM msT $ 3456.. CITY OF LINO LAKESXX.L-XXX ROADWAY EST OTYS .5 CITY OF LINO LAKES 0045 5 3.240.00 Unit Cost Total MOBILIZATIONL FIELD OFFICE TYPE D UMP SUM EACH 612000.00 81202300 006 97200 512000.00 907 S $ 10884.00 5576.00 $ 045 $ 54060 CLEARING ACRE ] 5400.0 8608000 s - $ $ - $ - CLEARING GRUBBING GRUBBING TREE ACRE TREE 6 2 79 885.00 8320.00 56500 59.86000 $4%4.00 .1350 116 2 79 $ 96030 $4 8. 00 S 5 135 03 - 5 - 5 REMOVEPIPECULVE' LIN FT 160 8120 819200 10 81 920 00 $ 2.3100 5 REMOVESEWERPIPE(STORM) REMOVE BITUMINOUS PAVEMENT SAWN° BIT PAVEMENT (FULL DEP.) LIN ET SO YD 1. 90. 130 $150 82605 823100 254380 84020 154 905 132 .4.0 8 8 - 8 REMOVE SIGN TYPE C EACH 5260 $ 8320 S 1035150- - $ - SU0000 EXCAVATION BGRADEEXCAVATIg00VA CU00 601 $150 55.50 .320 S103515.0 51914550 8 - CHANNEL FNNEIANDPONDEXCAVATION(EV1 ERM CU 20 GALLONS 9000 5100 529.0 590 OM LP 551300 20 8 580.0 AGGREGATE BASE (CV)CLASS 5 CU20 258 5300 5773907 - - 5 - S $ - 5 - BASE62616 GGREGATE(C/)CLA.5 SHOULDERING CLASS W CU WYD 2 11 524 0 $1 . 00 $52616 0 5005778 209 $ 6 $ 64057.78 LL BITUMINOUS SURFACE (2 01 SO VD 4286 51400 5141460 1286 $ 141460 5 5 CONCRETE ENT70. INTEGRANT CURB DESIGN. SO YD LIN FT 432 282 55350 51650 5231120 54.6530 432 282 23112.0 $ 4653.0 $ - O'DOWEL BAR EACH 8130 5.20.0 3305 42.0 8 - NO 4 REIN- TIE BAR (EPDXY COATED) BITUMINOUS MATERIAL FOR TAO( COAT TYPE SP 95 WEARING COURSE MIX(2B) EACH GALLON 150 1231 263 56 00 . 0 5850 5900.01 53693.92 52233723 1 231 8 90.0 3 5 601.9] 8 9350 145 5 1232500 10 8 S 9.180.0 TYPE .125 WEARING COURSE M.(0 E)TON 11]5 568.0 52252160 3312 22521660 $ S TYPE SP 15 NON WEAR COURSE MIX PI 01 2 CS PIPE CULVERT TON LIN FT 96536.0 $630 8740250 .5280 1175 98 7 $ $ 3 528 00 $$ 8 - 15'CSSAFETY APR 8GRATE DES 3120 EACH 5530.0 8212.00 21200 8 8 5RC PIPEAPRON . RC PIPE APRON 15' RC PIPE SEWER CLASS V EACH EACH 5 1 666 $630 0 5780 00 520 50. 0 5]0.0 5279.02 5 39 649.36 $ 5 3 S 30400 $ 272]304 5 5 - 61 1695 80 5 5 7198 21' RC PIPE SEWER CLASS III LIN FT 131 $54.0 5]00.]4 14.05 8 $ - 5 9705 $ 5240.75 $ 12 (NAGE STRUCTURE DESIGN H QST. DRAINAGE STRUCTURE DES 48402 CAS605 TING ASSEMBLY LIN FT LW FT EACH 55 23 83100 530.0 56750 .00 523,850.60 5155250 4199 1934 $ 5 18,03 65 $ 1305459 5 - S 1348 356 5 5796.03 $ 2 4750 RANDOM RIPRAP CLASS III CU YD 20 81 194.0 5 FIL1ER GEOTEXTLEFILTER TYPE IV(MWISO 4" CONCRETE WALK CU VD SOFT 2 216 6.7 51100 1700 53.20 5.10 98. 0 56056 528 113 2 216 6857 90 5 .0 $ 690.56 S 28 113 70 $ - S 5 S 6' CONCRETE WALK SO F7 2187 51350 52952450 712 8 9,612 OD 629 S 049150 S 846114210 $ $ - CONCRETE CURB 8 GUTTER DESIGN SPECIAL CONCRETE CURB 8GUTTER DESIGN B018(MOD) L. FT L. Ft 2352 5230 51750 582340 541 160 358 2352E 5 8234.0 41 160 00 - 1085025 590 S 1090575 CONCRETE CURB 8 GUTTER DESIGN .24 TRUNCATED DOMES AL BOX SUPPORT LM FT SOFT EACH2 2365 40.9 51050 8350 $130.0 543 752 5142600 52600 1189 2 8 21996 50 5 200 587 192 $ 67200 216 5 7,560 00 - LI BOX SUPPORT EACH 2 580.0 60 0 51 2 8 S 4 S 0 0 8 400 8 8NDATION LIGHTING UNIT TYPE SPECIAL LIGHT DESIGN E 2' NON-METALLIC CONDUIT EACH EACH LIN FT 16 16 230 $2100 5750 00 56.70 53300.0 51200.0 515410.0 8 1. 81 5 6000 7 705.0 0 .5$ $ 300.0 3852.50 0 75 $3,000 00 $ 3 052.0 UNDERGROUND WIRE 1 GOND NO LIN FT $080 579200 4950 5 210.0 2475 25 $ 90.0 % 1 2475 81,980 03 S 1,050 0 SERVICE CABINET TYPE Lt SERVICE EOUIPMENT EACH 1 5200 51200 84.20.0 51200 50 S 6000 25 S 300 25 $ 300 EQUIPMENT PADS EACH 51000.0 51600.0 50 500 CO20 50 S 250.0 5 1000 25 50 S 2500 $ 1,00300 HAND HWE2 RAISE GUARDRAIL TRAFFIC CONTROL SUPERVISOR LIK LUMP SUM 160 8200.0 $120 $5700 $4.00.0 819200 55 700 1.0 1605 200.0 1920 8 51.90 008 8 S 2730 O. $ S 256.50 TRAFFIC CONTROL (STAGE I) LUMP SUM 56000 5600.0 907 85 442 00 54420 048 2.00 0 $ 288 045$ 045 2700 S 27000 TRAFFIC CONTROL (STAGE 2) TRAFFIC CONTROL (STAGE 3) SUM MP SUM 5600 .0 56000 5600.0 56,000 907. $ .048 $ 2880 8 288.0 045 045 5 2700 5 2700 TRAFFIC OONTROL(STAGE 41 DETOUR SIGNING ( CSAR 121 DETOUR SIGNING( CR 531LU MP SUM LUMP SUM MP SUM 560.0 0 54000 5000.0 86 OM 00 54.0 907 907 E 54420 $ $ 3620.0 5 36280 .048 008 192 0 $ 1920 045 045 518000 S 180 00 SIGN PANELS TYPE C SO FT 53250 10 53131 37806 .75 31 37875 8 5 SILT FENCE TYPE MS DRAIN6 IO STORM INLET PROTECTION LIN Fi3 279 820 5150.0 5100 50500 3259 2 E 518 00 5 4050.0 - - 8 S SEDIMENT CONTROL LW TYPE WOOD FIBER CULVERTENDCONTROLS LIN FT EACH 64 5.3.0 51590 51920 5600.0 192 00 600 - FERTILIZER TYPE 3 POUND 150 51 50 5225 71 150 $ 22571 S $ SEEDING SEED MIXTURE 25-121 SEED MMTURE33261 ACRE POUND POUND 1. 2 5880 03 5350 5200 82206.91 553543 539610 153 20 8 220.91 $ 53543 5 396.10MSEED - 5 - E IXTURE 35.221 POUND 19 5220 $426.20 19 426 20S S 5 - E MULCH MATERIAL TYPE 3 DSKANCHORING EROSION CONTROL BLANKETS CATEGORY TON ACRE SO YD 3046 $7600 8220 52 40 5547080 5792. 5]309.87 7 85 478 80 792. 8 73087 - - 8 - 8 $ RAPID, STABILIZATIONMETHOD 3 MGAL 22 5500 S9732 0 22 8 9.732.0 5 - $ - 4'SOLD LINE WHITE-EPDXY 4 - SOLID LINE YELLOW-EPDXY LIN FT 3310 80.3] .37 52 536.20 8122470 .60 33108 2 538 20 122070 BROKEN LINE YELLOWEEPDXY LIN FT/20 50.37 50440 120 $ 5 161250 - 4'DOUBLE SOLID LINE YELLOW-EPDXY PAVEMENT MARKING SP00103ECIAL LIN ET SOFT 210 624 50.75 5160 51 612 50 $99840 2150 624 5 99640 $ - $ BASE BIO TOTAL: 31,266,431.86 $ 1.423,187.4$2 $ 42046685 Y ' •79.67Cr P:002 -612-130o umen5s\Road & Bridge Design \ estimate \02-612-13_SEQxIs 10/28/2015 PRELIMINARY DESIGN LAYOUT 650. PROPOSED ROADWAY 4 PROPOSED CURB F. MEDIAN PAVED SHOULDER ® SIDEWALK INFILTRATION POND MARVV ST 7381 LEONARD AV 82 LEONARD AVE ARV STREET. 48 MARVY ST 11148 SUNSET AVE INPLACE RIGHT OF WAY f PROPOSED RIGHT OF WAY %` ----- PERMANENT EASEMENT TEMPORARY EASEMENT EXHIBIT A 11/30/2015 299 MEADOW CT 7287MEADOW CT• ,. 7281 MEADOW CT 7275 MEADOW CTS APOLLO AVENUE CSAR 12 7300 HEATHER CT ]300 MEADOW CT 1 7299 HEATHER CT ¢ 1 - jVC.' 7291 MEADOW CT 7293 HEATHER CT 7288 MEADOW CT 7287 HEATHER CT 294 HEATHER CT 7280 MEADOW CT 7281 HEATHER CTK 7275 HEATHER CT HEATHER C 274 MEADOW CT 1008 SUNSET AVE 69 HEATHER CT 68 MEADOW CT 7268 HEATHER C 7263 MEADOW CT 7256 MEADOW CT 7257 MEADOW CT SPEED LIMIT 45