My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-034
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2010's
>
2019
>
2019-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 11:58:39 AM
Creation date
2/4/2021 8:56:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5) A Landscape License Agreement shall be executed for the maintenance of commonly <br />held HOA and City outlots and right-of-ways before release of the final plat by City <br />Officials. <br />6) The applicant shall provide a disclosure statement to all first homeowners in the development <br />advising of the location of the Lake Elmo Airport and associated over -flights. <br />7) All builders shall be encouraged to incorporate interior noise reduction measures into single <br />family residential structures within the subdivision based on the Metropolitan Council's <br />Builder Guide. <br />8) The developer shall provide copies of the Northern Natural Gas permits to the City and shall <br />abide by any conditions of approval as listed in permits issued by Northern Natural Gas to <br />perform construction work over the gas line that runs from north to south across this site, <br />9) The developer shall maintain the temporary secondary access to Village Parkway in the 4 th <br />Addition until a permanent 35b Street North is constructed to connect to Village Parkway and <br />the contractor has placed the wear course of bituminous on the streets within the 5h Addition. <br />Lot 13, Block 3 of the Easton Village 4h Addition shall remain platted as outlots (outlots A <br />and B) owned by the developer with a temporary road access granted, to the City until such <br />time as the City accepts 35t" Street North. <br />10) That the development improvements include the connection of the private driveways from 11361 <br />Upper 33rd Street and the Northern Natural Gas property at 11371 Upper 33rd Street to the <br />proposed 34th Street cul-de-sac, immediately following the placement of bituminous base course <br />along 34th Street North. <br />11) Final Plat approval shall be contingent upon the development improvements including the <br />installation of bituminous trail and a concrete sidewalk along Village Parkway (with barriers at the <br />railroad tracks) and the developer extending a 12-inch watermain to the northerly plat limits along <br />Village Parkway. <br />12) The applicant/developer shall revise the landscape plans to meet the conditions of approval of the <br />preliminary plat and the changes required by the City's Landscape Architect as outlined in his <br />memo dated March 29, 2019. <br />13) That the applicant notify all home builders about possible City outdoor watering restrictions and <br />that the home builders notify all home buyers that the City may impose limits on outdoor water <br />use including no watering of grass or sod unless the applicant is notified by the City that this <br />notice is no longer required. Said decision about whether or not this notice is no longer required <br />shalt be made at the sole discretion of the City. The applicant shall have the city approve the <br />notification message before recording the final plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.