Laserfiche WebLink
3. That the applicant prepare the final plat and final PUD plans showing all of the site <br />perimeter property lines - including any revisions necessary for including the right-of- <br />way for the north -south street and all additional right-of-way needed for Hudson <br />Boulevard as the proposal only includes a portion of the parcel with the PID# <br />34.029.21.43.0003. <br />4. That the final plat and final PUD Plans submittal identify all requests for flexibility from <br />the Zoning Code. <br />5. That the applicant address all comments and conditions of approval in the City <br />Engineer's Memorandum dated May 8, 2019 with revised project plans for the future <br />final plat and final PUD Plans submittal. <br />6. That the final Plat and final PUD Plans submittal include a revised tree <br />preservation/replanting and revised landscape plans to address all the comments and <br />changes noted in the memo from the City's Landscape Architect dated May 7, 2019. <br />These final plans must be reviewed and approved by the City's Landscape Architect <br />before the applicant submits applications for final plat and final PUD approval. <br />7. That the final Plat and final PUD Plans submittal include updated open space and <br />impervious surface calculations. <br />8. That the final plat show a drainage and utility casement over the wetland and the wetland <br />buffers, including the I 00-year high water level. <br />9. That a bituminous trail be installed along Hudson Boulevard and along the future <br />north/south (Julia Avenue) road as part of this development. <br />10. That the applicant provide the City fees in lieu of park land dedication as required by <br />Section 153.14 with future final plat. <br />11. That if the applicant wants amenity points for theming, that they provide the City for staff <br />approval specific examples of proposed development fencing, landscaping, lighting and <br />site furnishings, including the clubhouse that will meet the standards outlined in the Lake <br />Elmo Branding and Theming Study. <br />12. That the final plat and final PUD Plans submittal include detailed architectural plans for <br />the exterior of the buildings (including colors and a listing of all exterior materials) for <br />staff review and approval. <br />13. That the applicant receive a permit from the Valley Branch Watershed District for the <br />construction of the proposed development. <br />14. All storm water facilities internal to the site shall be privately owned and maintained. A <br />storm water maintenance and easement agreement in a form acceptable to the City shall <br />be executed and recorded with the final plat for all 1 00-year high water level areas and to <br />protect all overland emergency flow paths. <br />15. The Preliminary Plat approval is conditioned upon the applicant meeting all City standards <br />and design requirements unless specifically addressed otherwise in these conditions. <br />16. That the PUD overlay zoning allow for the following: <br />d. Setbacks: <br />Springs Apartments at Lake Elmo Minimum Building Setbacks <br />Front (Hudson Blvd). <br />20 ft. <br />Interior Side <br />10 ft. <br />