before plat recording. Before construction, the plan section detailing southbound right turn lanes <br />and center left turn lanes on Manning Avenue at Hudson Boulevard must be submitted and <br />approved by the county traffic engineer, applicable Washington County right-of-way permits <br />must be obtained, drainage report and calculations must be submitted, and access control shall be <br />dedicated to Washington County along CSAH 15/Manning Avenue frontage. The Applicant shall <br />be solely responsible for all construction costs associated with the intersection improvements as <br />recommended by Washington County. <br />5) That the applicant/developer pay the City the required parkland dedication fees in lieu of park <br />land dedication applicable to this phase of the development ($25,470,00) before the City releases <br />the final plat for recording. <br />6) The Final Plat and PUD Plans for each building site shall provide the required 20% open space <br />within the development or specify what the proposed public or site amenity the development will <br />provide that the City may consider as an alternative to the open space requirement. The City must <br />approve any proposed amenities as part of the development approval process for each lot or <br />building site. <br />7) The Final Plat and PUD Plans for each building site shall detail proposed amenities in exchange <br />for flexibility from standards of the Zoning Code, <br />8) The Final Plat and PUD Plans shall include provisions for City sanitary sewer and municipal <br />water, The Applicant shall be responsible to extend City sanitary sewer and municipal water to <br />the site at the applicant's cost, including all oversize costs. Sanitary sewer and water main stubs <br />will be required to all adjacent properties. <br />9) The Applicant shall obtain all necessary permits including but not limited to all applicable city <br />permits (building, grading, sign, etc.), NPDES/SWPPP permits and Valley Branch Watershed <br />District and MnDOT approval before starting any grading or construction activities. <br />10) Storm water facilities shall be privately owned and maintained. A maintenance and easement <br />agreement in the City standard form of agreement shall be executed and recorded with the final <br />plat. <br />1) The Final Plat and PUD Plans for each lot shall include tree planting and landscape plans for each <br />building site or project phase to be approved by the City's Landscape Architect. <br />12) The Final Plat and PUD Plans for each lot shall include architectural renderings for each lot and <br />building site. <br />13) The Applicant(s) or developers shall submit a photometric plan for each lot and building site. All <br />lighting must meet the requirements of Sections 150.035-150.038 of the City Code. <br />14) The applicant shall meet all the requirements of MNDOT as outlined in their comments dated <br />February 15, 2019. <br />15) That the applicant or developer address all the comments of the Fire Chief and the Building <br />Official with final site and building plans including the placement, of fire hydrants, driveway <br />design and emergency vehicle access within each building site. <br />