Laserfiche WebLink
4. That the PUD Concept Plan is generally consistent with the City's engineering standards <br />with exceptions as noted in the City Engineer's memorandum dated September 3, 2019. <br />5. The PUD Concept Plan meets the minimum requirement for a PUD including minimurn <br />lot area, open space and street layout. <br />6. The PUD Concept Plan meets the allowed density requirement provided the <br />Comprehensive Plan's Land Use Map is amended to re -guide this site from Business Park <br />to Mixed Use Business Park or to Urban High Density Residential. <br />7. The PUD Concept Plan meets more than one of the required PUD objectives identified in, <br />Section 154.751 including providing: innovation in land development techniques that may <br />be more suitable for a given parcel than conventional approaches; provision of a more <br />adequate, usable, and suitably located open space, recreational amenities and other public <br />facilities than would otherwise be provided under conventional land development <br />techniques; accommodation of housing of all types with convenient access to employment <br />opportunities and/or commercial facilities; and especially to create additional opportunities <br />for senior and affordable housing; coordination of architectural styles and building forms <br />to achieve greater compatibility within the development and surrounding land uses; and <br />higher standards of site and building design than would otherwise be provided under <br />conventional land development technique. <br />NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby <br />approve the Concept PUD Plans for the Applewood Pointe Senior Housing development as <br />prepared by LSE Architects for United Properties subject to the following conditions: <br />I . That the applicant request and the City approve a Comprehensive Plan Amendment to <br />amend the City's Land Use Plan to re -guide the property from BP (business park) to MU - <br />BP (mixed use business park or to HD R (high density residential). <br />2. That the future preliminary plat and preliminary PUD plans would be for the parcel with <br />the RID #33.029.21.44.0009• <br />1 That the applicant prepare any future preliminary plat and preliminary PUD plans <br />showing all of the site perimeter property lines - including any revisions for any <br />additional right-of-way or easements that may be needed for Hudson Boulevard. <br />4. That the future preliminary plat and preliminary PUD Plans submittal identify all requests <br />for flexibility from the Zoning Code. <br />5. That the applicant address all comments in the City Engineer's Memorandum dated <br />September 3, 2019 with the future preliminary plat and preliminary PUD Plans submittal. <br />These include completing a traffic impact study, having only one driveway for the site, <br />installing a public trail along Hudson Boulevard and managing all storm water on the <br />site. <br />6. That the Preliminary Plat and PUD Plans submittal include a complete tree inventory and <br />tree preservation/replanting and landscape plans to be reviewed and approved by the <br />City' s Landscape Architect. <br />7. That the Preliminary Plat and PUD Plans submittal include accurate open space and <br />impervious surface calculations. <br />