Laserfiche WebLink
proposed public easement areas including the proposed watermain easements and the <br />property line drainage and utility easements. <br />8. That the final Plat and final PUD Plans submittal include accurate open space and <br />impervious surface calculations. <br />9. That the final plat show drainage and utility easements over the stormwater pending areas, <br />wetlands and the wetland buffers, including the 100-year high water level. <br />10. That the applicant/developer provide the City fees in lieu of park land dedication as required <br />by 153.14 with future final plat. <br />11. That the final plat and final PUD Plans submittal include detailed architectural plans for the <br />building. <br />12. The applicant receives a permit from the South Washington Watershed District for the <br />construction of the proposed development. <br />13. That the applicant/developer install a 8-foot-wide trail along Hudson Boulevard and a 6- <br />foot-wide concrete sidewalk along Eagle Point Boulevard as a part of the improvement of <br />the site. <br />14. That the applicant/developer installs all the required improvements in and adjacent to <br />Hudson Boulevard. <br />15. All storm water facilities internal to the site shall be privately owned and maintained. A <br />storm water maintenance and easement agreement in a form acceptable to the City shall be <br />executed and recorded with the final plat for all 100-year high water level areas and to <br />protect all overland emergency flow paths. <br />16. The Preliminary Plat/Preliminary PUD approval is conditioned upon the applicant meeting all <br />City standards and design requirements unless specifically addressed otherwise in these <br />conditions. <br />17. That the PUD overlay zoning allow for the following: <br />a. Setbacks: <br />Applewood Pointe of Lake Elmo - Minimum Building Setbacks <br />Front (Eagle Point Boulevard). <br />20 ft. <br />Interior Side <br />20 ft. <br />Rear (south property line) <br />50 ft. <br />b. The maximum building height shall be 50 feet. <br />18. The Final Plat/Final PUD shall include all necessary and additional public right-of-way and <br />easements for Hudson Boulevard and for Eagle Point Boulevard. These shall include any <br />drainage and utility easements, any additional street right-of-way and any necessary <br />pedestrian easements for sidewalks or trails. <br />19. The Final Plat/Final PUD submittal must include a complete storm water management plan <br />and construction plans that provide all design details for the proposed underground storage <br />systems including details regarding building roof drainage connections. <br />