Laserfiche WebLink
IUM^ MMMRMMMU-�­W� <br />A. PUD Preliminary Plan <br />1. Prerequisite. Pre -application Conference. Before filingof f an application for OP <br />planned unit development with the City, the applicant of the proposed OP planned <br />unit development shall arrange for and attend a conference with the Planning <br />Director, City Engineer and other City staff. The primary purpose of the conference <br />shall be to provide the applicant with an opportunity to gather information and obtain <br />guidance as to the general suitability of his or her proposal for the area for which it is <br />proposed and its conformity to the provisions of this subchapter before incurring <br />substantial expense in the preparation of plans, surveys and other data. <br />No application for an open space PUD Preliminary Plan will be accepted by the City <br />unless an applicant's proposal is distinctly similar to one reviewed by City staff in the <br />required pre -application conference. i the eempleted the open <br />pe space PUD Sket �. <br />Plan review prooess w-hieh is valid upon the date of applicati <br />2. PUD Preliminary Plan Submittal Requirements <br />Except as may be waived by the Director of Planning, the following information shall <br />constitute a complete application for an open space PUD Preliminary Plan. <br />a. All required information for a preliminary plat per Chapter 1102, § 1102.01(C) <br />and § 1102.02. <br />b. A separate open space PUD Preliminary Plan which includes the following <br />information: <br />i. Administrative information (including identification of the drawing as an <br />"Open Space PUD Preliminary Plan," the proposed name of the project, <br />contact information for the developer and individual preparing the plan, <br />signature of the surveyor and civil engineer certifying the document, date of <br />plan preparation or revision, and a graphic scale and north arrow); <br />14 <br />