Laserfiche WebLink
significant trees may utilize a combinationof the individual and <br />sampling inventory methods: <br />c. Trees that were planted as pat of a commercial business ;such as a tree a re or <br />nursery do not need to be inventoried on an individual tree basis. A general,____ <br />description of the trees and an outer boundary of the planted area must be <br />provided. The burden of proof shall be on the applicant to provide evidence to <br />support the finding that the trees were planted as part of a commercial <br />business. <br />d. A listing of'healthy significant trees inventoried in subsection b) above. <br />Dead, diseased or dying trees do not need to be included in the totals: <br />e. A listing of the healthy significant trees removed, identified by the metal field <br />tag or some other form of identification used in the tree inventory in <br />subsection b) above, <br />f.. A listing of the healthy significant trees to remain, identified by the metal field <br />tag or some other form of identification used in the tree inventory in <br />subsection b) above. <br />g. Outer boundary of all contiguous wooded areas, with a general description of <br />trees not meeting the significant tree size threshold, <br />h, locations of the proposed buildings, structures, or impervious surfaces. <br />i. Delineation of all areas to be graded and limits of land disturbance. <br />. Identification of all significant trees proposed to be removed within the <br />construction area. These significant trees should be identified in both graphic <br />and tabular fo <br />lc, Measures to protect significant trees: and City,itgndcard treeotection detail. <br />1. Size, species, number and location of all replacement trees proposed to b <br />planted on the property in accordance with the Mitigation Plan, if necessary. <br />in. Signature of the person(s) preparing the plan.. <br />. Implementation. All sites shall be staked, as depicted in the approved Tree <br />Preservation flan, and the required tree protection fencing shall be installed <br />around the critical root zone before land: disturbance is to commence. T - tra <br />a_ <br />Tlie <br />City lets I to ill plc t the site at any finec fo c:(1i ince witli the i lean. No <br />encroachment, land disturbance, trenching, filling, compaction, or change in soil <br />chemistry shall occur within the fenced areas protecting the critical root zone of <br />the trees to be saved.. <br />5. Allowable Tree Renewal. Up to thirty (30) percent of the diameter inches of <br />significant trees on any parcel of land being developed maybe removed without <br />replacement requirements. Replacement according to the Tree Replacement <br />Schedule is required when removal exceeds more than thirty 0) percent of the <br />