Laserfiche WebLink
6. Before the execution of the Final Plat by City officials, the Developer shall enter into a <br />Development Agreement acceptable to the City Attorney and approved by the City Council that <br />delineates who is responsible for the design, construction, and payment of the required <br />improvements and shall include the payment of required park dedication fees for the Legacy at <br />North Star Fourth Addition Final Plat with financial guarantees therefore. <br />A Landscape License Agreement shall be executed for the maintenance of commonly held <br />homeowners' association -owned and City -owned outlots, right-of-ways, and medians before the <br />release of the final plat by City Officials. <br />8. The Developer will need to install a trail to the edge of Hamlet on Sunfish, as shown on the <br />construction plans and have it accepted by the City before the building permits for the 4' Addition <br />can be released. <br />9. That the developer provide the City written verification from Washington County that sufficient <br />right-of-way has been provided on the plat along with a sufficient right-of-way easement along the <br />property to the south of the development before plat recording. Prior to construction, the plan <br />section detailing southbound right turn lanes and center left turn lanes at 391 Street must be <br />submitted and approved by the county traffic engineer, applicable Washington County right-of- <br />way permits must be obtained, drainage report and calculations must be submitted, and access <br />control shall be dedicated to Washington County along CSAH 17/Lake Elmo Avenue frontage. <br />The Applicant shall be solely responsible for all construction costs associated with the intersection <br />improvements as recommended by Washington County. (Complete) <br />10. That the Landscape Plans for this phase of the development be updated and approved by the City's <br />Landscape Architect before recording of final plat. The developer shall not plant any trees that will <br />conflict with proposed utilities or utility easements. <br />11. That the applicant address all Fire Chief and Building Official comments. <br />12. That street names shall comply with City's Street Naming Policy. <br />13. That the applicant satisfy the park dedication requirement before the City releases the final plat for <br />recording. The park dedication requirement shall be a fee equivalent to 2.74 acres, which is <br />$224,447.58. <br />14. That the applicant notify all home builders about possible City outdoor watering restrictions and <br />that the home builders notify all home buyers that the City may impose limits on outdoor water use <br />including no vehicle washing and no watering of grass or sod. <br />15. A 30-foot-wide open space (no disturb) buffer shall be applied to the area adjacent to the northern <br />property line of the development and a 50-foot-wide open space (no disturb) buffer be applied to <br />the western property line of the development. <br />16. That the development utilize Traditionaire LED Downlights from Xcel Energy for the development <br />in lieu of the Street Light Type/Pole of Acorn with aluminum pole (all black) indicated in the City's <br />Engineering Standards and that streetlights be located only at intersections and at the ends of cul- <br />de-sacs. <br />M <br />