My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-134
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2020's
>
2021
>
2021-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:35:12 PM
Creation date
4/11/2023 2:21:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to cure the default. <br />The Developer has posted a security with the City with respect to the Grading Agreement. <br />The Developer may have the City release the security posted by it pursuant to the Grading <br />Agreement and post a new Security or it may allow the security posted under the Grading <br />Agreement to be applied towards the Security required by this Agreement. <br />32. REDUCTION OF SECURITY. Upon written request by the Developer and upon receipt <br />of proof satisfactory to the City Engineer that work has been completed in accordance with the <br />approved Plans and the terms of this Agreement and that all financial obligations to the City have <br />been satisfied, the City Engineer may approve reductions in the Security in the following <br />instances: <br />A. Upon completion of grading operations, including temporary site restoration. The <br />Developer must submit an as -built grading survey to the City that at a minimum <br />establishes the as -built grades at all lot corners and downstream drainage <br />conveyance systems and storm water ponds. Upon inspection of the site and <br />approval of the as -built survey by the City, 100 percent, or $468,200 of the Security <br />associated with grading may be released. This Security reduction does not include <br />amounts related to erosion and sedimentation control. <br />B. Up to 75 percent of the Security associated with the itemization on Exhibit C may <br />be released upon completion of the following key milestones of the project as <br />determined by the City Engineer: <br />1. Construction Categories 2 and 3: The amount of $754,394 may be released <br />when all sanitary sewer and watermain utilities have been installed, all <br />testing and televising has been successfully completed, sanitary sewer as - <br />built inverts have been verified, and the utilities are considered ready for <br />use by the City Engineer, <br />2. Construction Categories 4 and 5: The amount of $939,590 may be released <br />25 <br />LA515-93-753821 .0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.