Laserfiche WebLink
14) Vehicular approaches to the property, where present, will not create traffic congestion orinterfere with traffic on surrounding public thoroughfares. Traffic amounts will increase in <br />the area, but these increases will occur during typical low traffic volume time periods. Vehicle <br />queuing for possible pickups and drop offs shall be contained to the site as per the conditions of <br />approval·15) The proposed use will not result in the destruction, loss, or damage of a natural or scenicfeature of major importance. The proposed use should not impact natural or scenic <br />features. 16) That, in accordance with City Code Section 105.12.290, the construction of a chapel shall bepermissible under the Conditions 1-5 as provided in the decision below, and incorporatedherein:DECISION <br />NOW, THEREFORE, �E IT FURTHER RESOLVED, and based upon the information received and the above Findings, that the City Council of the City of Lake Elmo hereby approves the request by Kokoro Volleyball for a Conditional Use Permit for the construction of an indoor athletic facility at Brookman 3rd Addition, Lot 1, Block 1, subject to the following conditions ofapproval: 1.The applicant must obtain all other necessary City, State, and other governing bodypermits and approvals before the commencement of any construction activity on the site.These include, but not limited to, City of Lake Elmo grading permit, Minnesota Pollution <br />c'ontrol Agency stormwater permit, Valley Branch Watershed District permit, approval of <br />revised plans from the City Engineer, and a building permit. <br />2.No construction may begin until all items and changes outlined by the City Engineer inthe memorandum dated September 19, 2022 are addressed.3.No construction may begin until all items and changes outlined by the Fire Department'smemorandum dated July 26, 2022 are addressed. <br />4.Plans must be revised to comply with the landscape requirements of City Code ArticleVIII Environmental Standards and the City Landscapes Architect's memorandum datedAugust 3, 2022.5.The applicant shall provide the City with proof approval of a Minnesota Pollution ControlAgency storm water permit and a Valley Branch Watershed District storm water permit <br />prior to any construction. <br />6.The applicant must meet all requirements of the Lake Elmo Building Official. <br />7.Any vehicle queuing shall be contained within the parking lot onsite.8.The applicant must demonstrate the availability of overflow parking prior to anyconstruction.9.No parking may occur along 39th Street N. <br />10.The hours of operation shall be limited to 3:30 pm-9:30 pm Monday through Friday and <br />8:00 am -4:00 pm Saturday through Sunday. <br />11.If substantial construction has not taken place within 12 months of the City's approval,the conditional use permit and variance shall become void.