Laserfiche WebLink
All disturbed areas outside the street right-of-way shall be <br />seeded or sodded by the Developer within 10 days. <br />The Developer is responsible for Installing and maintaining <br />erosion control devices outside the street right-of-way until turf <br />Is fully established throughout the site. <br />D. The Developer shall pay all construction, engineering, legal and <br />administrative fees associated with the Improvements. <br />E. The Developer shall have all property comers and street radius <br />points staked for the City to use in construction of the <br />improvements. <br />F. The Developer shall arrange for the installation of underground <br />utilities after the first lift of bituminous pavement has been <br />placed, but before the final lift is placed. <br />Passed by the City Council of the City of lake Elmo, this end day of FEBRUARY <br />1993. <br />The provisions of this Ordinance shall become effective on the 25thday of <br />February , 1993. <br />Published on the 24tllday of February , 1 <br />Wyh <br />ATTEST: <br />Mary Kueffner, City Administrator <br />