My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01 - 2006 Full Resolutions Book
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2000's
>
2006
>
01 - 2006 Full Resolutions Book
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 12:11:29 PM
Creation date
7/6/2023 11:54:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
— 025 <br />3 — 21 <br />Approved the Sealing of Private Wells in the West Central <br />Lake Elmo (WCLA) with MPCA, in conjunction with MDH <br />— 026 <br />3 — 21 <br />Approved Claims <br />— 027 <br />3 — 21 <br />Awarded Bid for Phase IV Water System Interconnection <br />Project to Ellingson Drainage <br />— 028 <br />3 — 21 <br />Denied Variance for Jeffrey John and Robin Scharrer Located <br />at 7949 Hill Trail North — Section 700 <br />— 029 <br />3 — 21 <br />Accepted Feasibility Report & Ordered Plans & Specifications <br />for 2006 Street Repairs—Tablyn Park Neighborhood Street <br />— 030 <br />3 — 21 <br />Authorized Action against Chris Riley Utilities, Inc. for Non - <br />Performance of Water System Interconnect Projects I and III <br />— 031 <br />4-4 <br />Approved Claims <br />— 032 <br />4-4 <br />Approved Takeover Agreement with Travelers Casualty and <br />Surety Company re: Chris Riley Utilities, Inc. <br />— 033 <br />4 — 18 <br />Granted Permission to Lake Elmo Jaycees to Conduct <br />Charitable Gambling in the City of Lake Elmo <br />— 034 <br />4 — 18 <br />Approved Claims <br />— 035 <br />4 — 18 <br />Ordered Improvement & Preparation of Plans 2006 Street <br />Repairs — Tablyn Park Neighborhood <br />— 036 <br />4 — 18 <br />Approved Plans & Specifications & Ordered Advertisement <br />for Bids-Tablyn Park/Lake Elmo Heights Watermain Project <br />— 037 <br />4 — 18 <br />Approved Open Space Preservation Development Final Plat, <br />OP Final Plat & Development Agreement - Discover Crossing <br />— 038 <br />4 — 18 <br />Approved Open Space Preservation Development Stage Plan, <br />Preliminary Plat & CUP of Hidden Meadows of Lake Elmo <br />— 039 <br />5-2 <br />Approved Claims <br />— 040 <br />5-2 <br />Approved Claim <br />— 041 <br />5 — 16 <br />Approved Variance to Front Setback and Minimum Lot Size <br />Requirements for 8009 Hill Trail North <br />— 042 <br />5-2 <br />Approved Variance to Height of Side Walls for Rockpoint <br />Church <br />— 043 <br />5-2 <br />Approved Site Plan for Rockpoint Church <br />— 044 <br />5-2 <br />Approved Partial Payment No. 1 to Ellingson Drainage for <br />Water System Interconnect — Phase IV <br />— 045 <br />5-2 <br />Approved Partial Payment No. 4 to CB & I Constru4ors, Inc. <br />for Elevated Water Storage Tank No. 2 <br />— 046 <br />5 — 16 <br />Approved Claims <br />— 047 <br />6-6 <br />Awarded Bid for Tablyn Park/Lake E1moHeights/31st Street <br />Watermain Project <br />— 048 <br />5 — 16 <br />Approved Final Plat & Development Agreement for tidden <br />Meadows (fka Deer Glen) <br />— 049 <br />6-6 <br />Approved Claims <br />— 050 <br />6-6 <br />Awarded Bid for 2006 Crack Seal Project to L & M Services <br />of Belgrade, Inc. <br />— 051 <br />6 — 6 <br />Awarded Bid for 2006 Seal Coat Project to Alllied Blacktop <br />
The URL can be used to link to this page
Your browser does not support the video tag.