Laserfiche WebLink
<br /> <br />CITY OF LAKE ELMO, MN | PROJECT NO. 2020.121 STREET GRADING, SELECT GRANULAR AND GRAVEL BASE, <br />AND BITUMINOUS SURFACE CONSTRUCTION 3210-2 <br />Aggregate base material shall be placed on granular drainage material with track equipment. Wheeled <br />equipment shall not be driven on granular material. <br /> <br />If during fine grading, excess rock or coarse aggregate appears at the surface of the aggregate base, the coarse <br />rock shall be removed from the Project and be replaced with aggregate base material conforming to the <br />specified gradation. <br /> <br /> <br /> <br />END OF SECTION