<br /> 16 <br />LA515-119-849077.v5 <br />A. The City will not issue any building permits for any lot within the Subdivision, or within <br />a completed phase of the Subdivision in a City preapproved phasing plan, until such <br />time that sanitary sewer, water, storm sewer, curbing and one lift of asphalt has been <br />installed and tested for all public streets; boulevard grading has been completed <br />within the entire right-of-way (without hold down grading for the future sidewalk or <br />any other improvements); street and traffic control signs are installed; property <br />monuments have been installed and grading as-built plans have been submitted and <br />approved by the City. A “preapproved phasing plan” is defined as a phased <br />construction plan that has been submitted by the Developer and approved by the <br />City in advance of the preconstruction meeting for the Subdivision. Once the <br />construction has started, the City will not consider revisions to the phasing plan for <br />the purpose of issuing building permits. <br />B. The City may issue a single building permit for a “Model Home” if authorized by the <br />City Planning Director before the completion of the Subdivision Improvements <br />described in paragraph 26 (A) above, however, the Model Home Lot (as hereinafter <br />defined) shall have the following in place before the City will allow construction of <br />the Model Home to proceed: <br />1. Adequate safe public access for emergency services and contractors, including <br />a paved bituminous road to the building pad for the Model Home that is sufficient <br />to allow construction to proceed; <br />2. A grading as-built plan approved by the City for the lot identified (the “Model <br />Home Lot”) to include the Model Home and all downstream drainage facilities; <br />3. All storm water drainage facilities that include and are downstream from the <br />Model Home Lot are in place, meet the approved project plans, and are verified <br />by the City; and