My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Old Village Phase 7
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
02-21-23
>
#11 - Old Village Phase 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 8:24:06 PM
Creation date
9/28/2023 9:35:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT SCHEDULE <br />CITY OF LAKE ELMO <br /> <br /> <br /> <br />OLD VILLAGE PHASE 7 STREET AND UTILITY IMPROVEMENTS <br />PROJECT NO. 2022.119 <br /> <br />FOCUS ENGINEERING, inc. <br />Cara Geheren, P.E. 651.300.4261 <br />Jack Griffin, P.E. 651.300.4264 <br />Ryan Stempski, P.E. 651.300.4267 <br />Chad Isakson, P.E. 651.300.4283 <br /> <br /> <br />JUNE 21, 2022 Council authorizes Topographic Survey and Preliminary Design. <br /> <br /> <br />SEPTEMBER 6, 2022 Council authorizes preparation of the Feasibility Report. <br /> <br /> <br />NOVEMBER 1, 2022 Presentation of Preliminary Design and Feasibility Report. Council accepts Report <br />and calls Improvement Hearing. Council Orders the preparation of Plans and <br />Specifications. <br /> <br /> <br />NOVEMBER 16, 2022 Neighborhood informational meeting. <br /> <br /> <br />DECEMBER 6, 2022 Public Improvement Hearing. Council Orders the Improvement (4/5th Vote). <br /> <br /> <br />FEBRUARY 21, 2023 Council approves Plans and Specifications and orders Advertisement for Bids. <br /> <br />MARCH 7, 2023 Council calls Assessment Hearing. Publication in local paper March 10, 2023. <br /> <br />MARCH 23, 2023 Project Bid Date: Receive contractor bids. <br /> <br /> <br />APRIL 4, 2023 Council holds Assessment Hearing and adopts final assessment roll. Council <br />accepts bids and awards contract. <br /> <br /> <br />MAY 15, 2023 Conduct Pre-Construction Meeting and issue Notice to Proceed. <br />• OCTOBER 27, 2023 Substantial Completion. <br />• JUNE 28, 2024 Final Completion. <br /> <br /> <br />*Final Assessment Hearing Schedule TBD
The URL can be used to link to this page
Your browser does not support the video tag.