My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#28 - Bridgewater Village
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
01-02-24
>
#28 - Bridgewater Village
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 12:14:45 PM
Creation date
3/19/2024 9:45:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
projections by the County. The proposed public roadways meet City requirements for <br />commercial section and access for emergency needs. At ultimate build out there will be <br />multiple access points to the development for emergency vehicles. <br /> <br />Engineering traffic requirements have been incorporated into the typical sections to avoid <br />any additional impacts to the surrounding roadways. The development team will address <br />any other concerns pending city review of applications. <br /> <br />k) If applicable, provide a description of proposed lakeshore access (i.e. shared dock with <br />multiple slips, individual docks for each lot, etc.); <br /> <br />Not applicable to this project. <br /> <br />l) A description of proposed parks and/or open space. Please include a brief statement on <br />the proposed ownership and maintenance of said areas; <br /> <br />Per meetings with City of Lake Elmo Parks Commission it was determined that this <br />subdivision is not to have a dedicated park or public open space. Any open space in the <br />city ROW will be owned and maintained by the city. Any open space maintenance will be <br />the responsibility of the individual lot owner for the private parcels. <br /> <br />m) A proposed development schedule indicating the approximate date when construction of <br />the project, or stages of the same, can be expected to begin and be completed (including <br />the proposed phasing of construction of public improvements and recreational and <br />common space areas). <br /> <br />Expected construction schedule: <br /> <br />Public Improvements, public utilities, stormwater BMPs: June 2024 <br />Commercial pad prep & const. bank: aug / sept 2024 <br />Completion public infrastructure: 10/1 2024 <br />Bank complete: 9/1 2025 <br />Future construction of additional commercial lots and VMDR area: TBD <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.