Laserfiche WebLink
Current Legal Description: See article 1 <br /> <br />c) A listing of general information including: the proposed name of the subdivision, the <br />number of proposed lots, acreage dedicated for open space or public use, acreage <br />dedicated within rights of way; <br /> <br />Proposed Name of Subdivision: Bridgewater Village <br /> <br />Proposed Lots: Four commercial lots and multiple outlots for stormwater management and <br />future residential use. <br /> <br />Per meetings with City of Lake Elmo Parks Commission it was determined that this <br />subdivision is not to have a dedicated park or public open space. <br /> <br />Proposed lot areas listed below. Note areas have been rounded for clarity. Plat documents <br />show detailed acreages. <br /> <br />Overall Parcel Area: 1,051,398 SF 24.14 AC <br /> Lot 1, Block 1: 71,682 SF 1.65 AC <br /> Lot 1, Block 2: 71,302 SF 1.64 AC <br /> Lot 2, Block 2: 79,352 SF 1.82 AC <br /> Lot 3, Block 3: 82,871 SF 1.90 AC <br /> OUTLOT A: 30,790 SF 0.71 AC <br /> OUTLOT B: 52,569 SF 1.21 AC <br /> OUTLOT C: 67,100 SF 1.54 AC <br /> OUTLOT D: 280,169 SF 6.43 AC <br /> OUTLOT E: 101602 SF 2.33 AC <br />Dedicated ROW: 213963 SF 4.91 AC <br /> <br />i) Final exact area calculations of parks, trails, and any other dedicated public open <br />space; and estimated values of all dedicated land and improvements (trails, park <br />equipment, sports fields, etc.). <br /> <br />Per feedback from the City of Lake Elmo this site is not expected to be a favorable <br />location for a park and is not being proposed at this time. Trail is being added per city <br />direction within the proposed or existing public ROW area. <br />ii) Final exact area calculations of wetlands and buffers. <br /> <br />There are no wetlands or wetland buffers on site. <br />iii) Final proposed area calculations for all dedicated right-of-ways. <br />