Laserfiche WebLink
projections by the County. The proposed public roadways meet City requirements for <br />commercial section and access for emergency needs. At ultimate build out there will be <br />multiple access points to the development for emergency vehicles. <br /> <br />Engineering traffic requirements have been incorporated into the typical sections to avoid <br />any additional impacts to the surrounding roadways. The development team will address <br />any other concerns pending city review of applications. <br /> <br />k) If applicable, provide a description of proposed lakeshore access (i.e. shared dock with <br />multiple slips, individual docks for each lot, etc.); <br /> <br />Not applicable to this project. <br /> <br />l) A description of proposed parks and/or open space. Please include a brief statement on <br />the proposed ownership and maintenance of said areas; <br /> <br />Per meetings with City of Lake Elmo Parks Commission it was determined that this <br />subdivision is not to have a dedicated park or public open space. Any open space in the <br />city ROW will be owned and maintained by the city. Any open space maintenance will be <br />the responsibility of the individual lot owner for the private parcels. <br /> <br />m) A proposed development schedule indicating the approximate date when construction of <br />the project, or stages of the same, can be expected to begin and be completed (including <br />the proposed phasing of construction of public improvements and recreational and <br />common space areas). <br /> <br />Expected construction schedule: <br /> <br />Public Improvements, public utilities, stormwater BMPs: June 2024 <br />Commercial pad prep & const. bank: aug / sept 2024 <br />Completion public infrastructure: 10/1 2024 <br />Bank complete: 9/1 2025 <br />Future construction of additional commercial lots and VMDR area: TBD <br /> <br />