Laserfiche WebLink
<br /> <br /> <br />A great place to live, work and play…today and tomorrow <br /> <br /> Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006 <br />P: 651-430-6001 | F: 651-430-6017 | TTY: 651-430-6246 <br />www.co.washington.mn.us <br /> <br />Washington County is an equal opportunity organization and employer <br /> <br />Additionally, the developer or the City will need to submit a drainage report and calculations for review of any <br />downstream impacts to the county drainage system. Along with the drainage calculations, we will request written <br />conclusions that the volume and rate of stormwater run-off into the county right of way will stay the same as part <br />of the project. <br />All utility connections to County highway right of way for the development require Washington County Right of <br />Way permits. Typically, these utility connection permits are the responsibility of the utility companies. <br />Thank you again for the opportunity to provide comments on the preliminary plat for Bridgewater. We look <br />forward to continuing to work with you and the City of Lake Elmo to ensure that development in this area is <br />successful and well-served by the transportation network. Thank you again for this opportunity to comment on <br />the plans for the project. If you have any questions, please get in touch with me at 651-430-4307 or <br />daniel.elder@co.washington.mn.us <br />Sincerely, <br /> <br /> <br /> <br />Daniel Elder <br />Planner II <br />Cc (email only): <br />Wayne Sandberg, Public Works Director/County Engineer <br />Frank Ticknor, Deputy Director Public Works <br />Lyssa Leitner, Public Works Planning Director <br />Joe Gustafson, Traffic Engineer <br />Kevin Peterson, Design Engineer <br /> <br /> <br /> <br /> <br /> <br /> <br />