Laserfiche WebLink
>>>>>>>>||||||||||||||||||Feet06001200EXISTING STORM SEWEREX. WATER MAINLEGENDEX. HYDRANT|>>EXISTING STORM STRUCTURECITY OF LAKE ELMO,STILLWATER BOULEVARD CONNECTING WATERMAINPROJECT NO. 2023.113 JUNE, 2023FIGURE NO. 1PROPOSED IMPROVEMENTSMINNESOTADIRECTIONAL DRILL 14"HDPE DR11 WATERMAINALONG NORTH SIDE OFSTILLWATER BLVD(CSAH 14)12" DIP WATERMAIN(BY OTHERS)DIRECTIONAL DRILL 14"HDPE DR11 WATERMAINALONG SOUTH SIDE OFSTILLWATER BLVD(CSAH 14)DIRECTIONAL DRILL 14"HDPE DR11 WATERMAINALONG NORTH SIDE OFSTILLWATER LANECONNECT TO EX. 12" DIPWATERMAIN AT 9524STILLWATER BLVD NREMOVE APPROX. 1400LF OF EX. 4" DIPWATERMAIN ANDREPLACE WITH NEW 12"DIP WATERMAIN -REPLACE HYDRANTS /VALVES AS NECESSARYCONNECT TO EX. 12" DIPWATERMAIN AT 9434STILLWATER BLVD NPROPOSED WATER MAINPROPOSED HYDRANT|PROPOSED VALVEEX. VALVEPROPOSED WATER SERVICECONNECT TO EX 4" DIP WATERMAINEAST OF SERVICE CONNECTION TO9186 JAMACA CT N.EX. 4" DIP WATERMAIN WEST OF NEWCONNECTION TO REMAIN IN PLACE.