Laserfiche WebLink
QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />ITEM DESCRIPTION OF PAY ITEM UNIT <br />CONTRACT THIS PERIOD TOTAL TO DATE <br />114 LS 1 <br />$2,949.57 $2,949.57 0.00 $0.00 1.00 $2,949.57 <br />115 TN 1960 <br />$95.17 $186,533.20 0.00 $0.00 1,655.75 $157,577.73 <br />116 TN 2600 <br />$89.53 $232,778.00 0.00 $0.00 2,413.21 $216,054.69 <br />117 GAL 1520 <br />$0.01 $15.20 0.00 $0.00 1,520.00 $15.20 <br />118 SY 630 <br />$29.82 $18,786.60 0.00 $0.00 848.35 $25,297.80 <br />119 SY 60 <br />$29.82 $1,789.20 0.00 $0.00 87.10 $2,597.32 <br />120 LF 9200 <br />$17.72 $163,024.00 0.00 $0.00 9,131.00 $161,801.32 <br />121 LF 7910 <br />$17.44 $137,950.40 0.00 $0.00 7,940.00 $138,473.60 <br />122 LS 1 <br />$566.24 $566.24 0.00 $0.00 0.00 $0.00 <br />123 SF 230 <br />$7.00 $1,610.00 0.00 $0.00 272.00 $1,904.00 <br />124 SY 300 <br />$73.52 $22,056.00 0.00 $0.00 371.10 $27,283.27 <br />125 SY 40 <br />$106.35 $4,254.00 0.00 $0.00 40.00 $4,254.00 <br />126 SF 500 <br />$15.06 $7,530.00 0.00 $0.00 541.30 $8,151.98 <br />127 SF 136 <br />$56.62 $7,700.32 0.00 $0.00 124.00 $7,020.88 <br />128 SF 25 <br />$16.99 $424.75 0.00 $0.00 25.00 $424.75 <br />129 EA 16 <br />$168.47 $2,695.52 0.00 $0.00 15.00 $2,527.05 <br />$1,132,832.27 $242.48 $1,049,051.22 <br />130 EA 15 <br />$200.17 $3,002.55 0.00 $0.00 16.00 $3,202.72 <br />131 EA 15 <br />$1,857.47 $27,862.05 0.00 $0.00 16.00 $29,719.52 <br />132 SF 170 <br />$13.02 $2,213.40 0.00 $0.00 160.00 $2,083.20 <br />$33,078.00 $0.00 $35,005.44 <br />$1,458,524.06 $3,643.28 $1,246,445.30 <br />$143,952.32 $429.44 $98,601.93 <br />$473,641.72 $218.79 $467,312.08 <br />$15,315.23 $0.00 $17,503.12 <br />$292,613.79 $3,400.80 $162,388.64 <br />$1,132,832.27 $242.48 $1,049,051.22 <br />$33,078.00 $0.00 $35,005.44 <br />TOTALS ‐ BASE CONTRACT $2,091,433.33 $4,291.51 $1,829,862.44 <br />CO1‐1 EA 19                  $2,597.45 $49,351.55 0 $0.00 19 $49,351.55 <br />77 EA 19                  ‐$1,572.45 ‐$29,876.55 0 $0.00 0 $0.00 <br />$19,475.00 $0.00 $49,351.55 <br />CO2‐1 EA 1                     $4,704.20 $4,704.20 0 $0.00 1 $4,704.20 <br />CO2‐2 SY 1,725             $5.50 $9,487.50 0 $0.00 1,636 $8,998.00 <br />CO2‐3 SY 5,025             $5.50 $27,637.50 0 $0.00 4,380 $24,090.00 <br />CO2‐4 LS 1                     $1,120.94 $1,120.94 0 $0.00 1 $1,120.94 <br />CO2‐5 EA 8                     $1,600.00 $12,800.00 0 $0.00 8 $12,800.00 <br />CO2‐6 EA 5                     $1,800.00 $9,000.00 0 $0.00 5 $9,000.00 <br />CO2‐7 EA 1                     $2,270.00 $2,270.00 0 $0.00 1 $2,270.00 <br />CO2‐8 EA 12                  $185.00 $2,220.00 0 $0.00 12 $2,220.00 <br />$69,240.14 $0.00 $65,203.14 <br />TOTALS ‐ REVISED CONTRACT $2,180,148.47 $4,291.51 $1,944,417.13 <br />CHANGE ORDER NO. 2 <br />CONSTRUCT BLOCK / BARREL STRUCTURE ‐ CBMH 8 <br />SEED AND HYDROMULCH ‐ TANA RIDGE <br />SUBTOTAL ‐ CHANGE ORDER NO. 2 <br />SEED AND HYDROMULCH ‐ FIELDS OF ST CROIX 2ND <br />EXPLORATORY DIGGING <br />INSTALL HYDRANT EXTENSION ‐ 6 INCH <br />INSTALL HYDRANT EXTENSION ‐ 12 INCH <br />INSTALL HYDRANT EXTENSION ‐ 24 INCH <br />REPLACE GATE VALVE BOX TOP SECTION <br />TOTAL PART 3 ‐ TANA RIDGE WATER <br />TOTAL PART 4 ‐ THE FIELDS OF ST CROIX 2ND ADDITION GENERAL <br />TOTAL PART 5 ‐ THE FIELDS OF ST CROIX 2ND ADDITION STREETS <br />TRUNCATED DOME PANELS <br />CONCRETE APPROACH NOSE <br />TOTAL PART 5 ‐ THE FIELDS OF ST CROIX STREETS <br />TOTAL PART 1 ‐ TANA RIDGE GENERAL <br />TOTAL PART 2 ‐ TANA RIDGE STREET & STORM SEWER <br />CONCRETE MATURITY TESTING <br />5" CONCRETE SIDEWALK <br />6" CONCRETE DRIVEWAY PAVEMENT <br />7" CONCRETE VALLEY GUTTER <br />6" CONCRETE PEDESTRIAN RAMP <br />PART 6 ‐ THE FIELDS OF ST CROIX 2ND ADDITION WATER <br />REMOVE AND REPLACE HYDRANT FLAG <br />REMOVE AND REPLACE HYDRANT NOZZLE WITH 5" STORZ NOZZLE <br />CONCRETE HYDRANT SPLASH PAD <br />TOTAL PART 6 ‐ THE FIELDS OF ST CROIX 2ND ADDITION WATER <br />BITUMINOUS MATERIAL FOR TACK COAT <br />PATCH BITUMINOUS DRIVEWAY <br />PATCH BITUMINOUS TRAIL <br />B418 CONCRETE CURB AND GUTTER <br />SURMOUNTABLE CONCRETE CURB AND GUTTER <br />SALVAGE, STOCKPILE, AND RESPREAD RECLAIMED MATERIAL (UTILITY TRENCHES) <br />TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C] <br />TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C] <br />SUBTOTAL ‐ CHANGE ORDER NO. 1 <br />REMOVE AND REPLACE CASTING AND RINGS <br />ADJUST EXISTING VALVE BOX <br />CHANGE ORDER NO. 1 <br />REMOVE AND REPLACE MANHOLE TOP SLAB AND CASTING <br />TOTAL ‐ THE FIELDS OF ST CROIX 2ND ADDITION (PARTS 4, 5, & 6) <br />TOTAL PART 6 ‐ THE FIELDS OF ST CROIX 2ND ADDITION WATER