Laserfiche WebLink
BLOCK 2LOT 1HWLHWLHWLHWLHWLHWL39TH STREET NORTH(PUBLIC RIGHT OF WAY)2,069 CY TOPSOIL STOCKPILENEARBY AHA OWNED 32 ACRE PARCEL TO BE USED FOR STOCKPILESROCK CONSTRUCTION ENTRANCESFSFSFSFSF <br />SFSF <br />SFSFSFSFSFSFSFSFSFSF <br />SFSF <br />SFSFSFSFLAKE ELMOTOWNHOMES 839TH STREET NORTHS <br />T <br />I <br />L <br />LWA <br />T <br />ER <br /> B <br />LVD <br />/H <br />IGHWAY <br /> <br />14PROTECT EXISTING FIRE HYDRANTDOUBLE SILT FENCEN:\0040496.00\DWG\CIVIL\0040496EC03.DWG <br />3821PROJECT NUMBER: 0040496.00LAKE ELMO, MN01/08/24CAWJSBCAW© 2023 Westwood Professional Services, Inc.LAKE ELMO TOWNHOMES 8OFF-SITE TOPSOILSTOCKPILE PLAN1289 GRAND AVENUEST. PAUL, MN 55105LAKE ELMO TOWNHOMES 812/06/225483201/08/24JOHN S. BLENKERAT HOME APARTMENTS, LLCCONSTRUCTION PLANSSHEET NUMBER:VERTICAL SCALE:DATE:PREPARED FOR:OFHORIZONTAL SCALE:DRAWN:CHECKED:DESIGNED:INITIAL ISSUE:REVISIONS:Phone(320) 253-94951900 Medical Arts Ave S, Suite 100Fax(320) 358-2001Sartell, MN 56377Toll Free(800) 270-9495DATE:LICENSE NO.I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTACommon Ground AllianceCall 48 Hours before digging:811 or call811.com50.00002'10' OR 5'0'50'100'150'1" = 50'02/13/2307/28/2308/10/2310/31/2301/08/24CITY COMMENTS - SKETCH PLAN RESUBMITTALPRELIMINARY PUD SUBMITTALWATERSHED SUBMITTALCITY & WATERSHED COMMENTSSTREET WIDTH REVISIONSPROPERTY LINEEXISTINGPROPOSEDINDEX CONTOURINTERVAL CONTOUREROSION CONTROL LEGENDEROSION CONTROL NOTES982980982980SILT FENCESFSTOSTORM SEWERTPFTREE PROTECTION FENCETREE LINERETAINING WALL (MODULAR BLOCK)GRADING LIMITSGL1.ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN-PLACE PRIOR TO ANYEXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURF OR GROUNDCOVER HAS BEEN ESTABLISHED. EXISTING SILT FENCE ON-SITE SHALL BE MAINTAINED AND ORREMOVED AND SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONTRACT. IT IS OFEXTREME IMPORTANCE TO BE AWARE OF CURRENT FIELD CONDITIONS WITH RESPECT TOEROSION CONTROL. TEMPORARY PONDING, DIKES, HAY BALES, ETC., REQUIRED BY THE CITYSHALL BE INCIDENTAL TO THE GRADING CONTRACT.2.ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THE END OF EACHWORKING DAY. A ROCK ENTRANCE TO THE SITE MUST BE PROVIDED ACCORDING TO DETAILSTO REDUCE TRACKING OF DIRT ONTO PUBLIC STREETS.3.REDUNDANT PERIMETER SEDIMENT CONTROLS ARE NECESSARY WHEN SOIL DISTURBANCE ISWITHIN 50 FEET OF SURFACE WATERS. REDUNDANT SEDIMENT CONTROLS COULD INCLUDE:3.1.TWO ROWS OF SILT FENCE (SEPARATED BY 8 FEET); OR3.2.SILT FENCE AND A TOPSOIL BERM (STABILIZE BERM WITH MULCH); OR3.3.SILT FENCE AND FIBER LOGS; OR3.4.TOPSOIL BERM AND FIBER LOGS (STABILIZE BERM WITH MULCH).4.REDUNDANT SEDIMENT CONTROLS MUST BE INSTALLED PRIOR TO DISTURBING WITHIN 50 FEETOF THE SURFACE WATER.5.TOPSOIL TO BE STOCKPILED AND RESERVED TO RESTORE THE SITE WITH 6" OF TOPSOIL. TOPSOIL TO CONTAIN NO LESS THAN 6% ORGANIC MATTER.6.TOPSOIL SHALL BE TESTED TO ENSURE IT MEETS MNDOT SPEC 3877ROCK CONSTRUCTION ENTRANCEEROSION CONTROL BLANKETTURF REINFORCEMENT MATPOND NORMAL WATER LEVELINLET PROTECTIONEROSION CONTROL CHECKS/BIOROLLSEMERGENCY OVERFLOWE.O.F.WETLAND LINEWETLAND FILLWETLAND BUFFERPOND ACCESS MAINTENANCE BENCHWETLAND BUFFER LIMITSWETLAND BUFFER MONUMENTDO NOT DISTURBDND