Laserfiche WebLink
MEMORANDUM ITE Trip Generation (11th Edition) Land Use Units AM Peak Hour Trips PM Peak Hour Trips Total In Out Total In Out Single-Family Attached Housing (215) 48 23 6 17 27 16 11 Total 23 6 17 27 16 11 Pass-by Trips The ITE Trip Generation Manual provides estimates for the number of pass-by trips for the AM and PM Peak Hours for various land uses. These are the number of trips that will use the site roadway but are not new trips to the external roadway system. The ITE Trip Generation Manual shows that the proposed land use shown in the tables above have a 0% pass-by rate, meaning that all the trips within the proposed development will be new to the external roadway network. Summary The proposed development will change the land use from undeveloped to residential and therefore the proposed development will generate all new trips. The proposed development is estimated to generate 23 new roadway weekday morning peak hour trips (6 entering/17 exiting) and 27 new roadway weekday evening peak hour trips (16 entering/11 exiting), with a total of 346 new weekday roadway trips (173 entering/173 exiting).