<br /> <br />310 E 38th Street St #109, Minneapolis, MN 55409 | 612.568.2334 | <br />www.cooperativeenergyfutures.com <br /> <br />• That the technical foundation plan must be completed before we can submit a building <br />permit <br />• That the City Attorney will need time to draft the Stormwater Maintenance and Easement <br />Agreement. <br />• That building permit review, which may take three or more weeks, must be completed <br />and a permit issued before we are allowed to begin work on site. <br /> <br /> <br />Conclusion: <br /> <br />We are making good progress on all the conditions and building permit requirements, but we <br />were hindered by getting a late start that was not in our control. <br /> <br />Had legal and administrative functions not taken 7 months for us to close on this project with <br />One Energy, we would have easily met our April 4th deadline and would likely be well underway <br />with construction by now. We are very excited to get this project underway and completed so we <br />can provide residents of Lake Elmo with clean, affordable energy and membership in the <br />cooperative. <br /> <br />Please consider our request for a 3-month extension on our Conditional Use Permit. <br /> <br /> <br /> <br />Sincerely, <br /> <br /> <br />Dan Grantier <br />Solar Development Manager <br />Cooperative Energy Futures <br />509.304.4658 <br />dan@cooperativeenergyfutures.com <br /> <br /> <br /> <br />