My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-29
LakeElmo
>
Communications
>
Newsletter - The Fresh
>
2022 The Fresh Newsletters
>
2022-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 7:01:25 AM
Creation date
6/17/2024 1:37:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metro - I-94 Oakdale to St. Croix: <br />2022-2025 construction <br />Eastbound I-94 lane closure in <br />Washington County begins July 18 <br />Beginning at 5 a.m. Mon, July 18, eastbound I-94 will be reduced to two lanes of traffic between <br />Woodbury Dr. and the St. Croix River in the east metro through late October. <br />Construction crews will be reinforcing the road shoulders along this stretch of eastbound I-94 in <br />preparation for pavement resurfacing in 2023. Shoulder reinforcement includes removing the <br />current pavement and replacing it with a thicker layer of pavement that can withstand high traffic <br />volumes. Crews will use the road shoulders to maintain two lanes of traffic in each direction on I- <br />94 during next year’s construction. <br />No ramp closures are planned as part of this work in 2022. <br />Advance warning of stopped traffic on I-94 <br />This year, MnDOT will also install traffic monitoring censors along I-94 within the project area. The <br />censors will alert motorists to slow or stopped traffic ahead via roadside electronic message <br />boards. Their purpose is to help keep motorists, passengers, and construction crews safe in work <br />zones. During construction, plan your route in advance and expect delays during peak travel times. <br />All construction activities and traffic impacts are weather and schedule permitting and subject to <br />change. <br />More about this project <br />I-94 between Hwy 120/Century Ave. and the St. Croix River will undergo a two-and-a-half-year
The URL can be used to link to this page
Your browser does not support the video tag.