My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - Easton Village 6th & 7th Add DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
03-19-24
>
#05 - Easton Village 6th & 7th Add DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 11:59:05 AM
Creation date
8/16/2024 2:10:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />25 <br />LA515\89\721081.v13 <br />This breakdown is for historical reference; it is not a restriction on the use of the Security. <br />The City may draw down the Security, without notice, for any violation of the terms of this <br />Agreement or if the Security is allowed to lapse prior to the end of the required term. If the required <br />public Subdivision Improvements are not completed at least 30 days prior to the expiration of the <br />Security, the City may also draw it down. If the Security is drawn down, the proceeds shall be <br />used by the City to cure the default. <br />37. REDUCTION OF SECURITY. Upon written request by the Developer and upon receipt <br />of proof satisfactory to the City Engineer that work has been completed in accordance with the <br />approved Plans and the terms of this Agreement and that all financial obligations to the City have <br />been satisfied, the City Engineer may approve reductions in the Security in the following <br />instances: <br />A. Upon completion of grading operations, including temporary site restoration. The <br />Developer must submit an as-built grading survey to the City that at a minimum <br />establishes the as-built grades at all lot corners and downstream drainage <br />conveyance systems and storm water ponds. Upon inspection of the site and <br />approval of the as-built survey by the City, 100 percent, or $0, of the Security <br />associated with grading may be released. This Security reduction does not include <br />amounts related to erosion and sedimentation control. <br />B. Up to 75 percent of the Security associated with the itemization on Exhibit C may <br />be released upon completion of the following key milestones of the project as <br />determined by the City Engineer: <br />1. Construction Categories 2 and 3: The amount of $307,165 may be released <br />when all sanitary sewer and watermain utilities have been installed, all <br />testing and televising has been successfully completed, sanitary sewer as- <br />built inverts have been verified, and the utilities are considered ready for <br />use by the City Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.