My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#06 - Northstar 1st Add DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
03-19-24
>
#06 - Northstar 1st Add DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 11:59:51 AM
Creation date
8/16/2024 2:10:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 18 <br />LA515\112\937837.v1 <br />responsibility for the coordination, liability and costs related to the construction of the <br />sidewalks and trails. The Developer must ensure that the sidewalks and trails that <br />are located in the front yards of lots are constructed, inspected, and accepted by the <br />City before any driveways for these lots are constructed. The Developer must also <br />construct the sidewalks and trails in such a manner so that they are constructed <br />continuously from end of street to end of street without any exceptions or gaps in the <br />sidewalk or trail. There must not be any building construction on any of the impacted <br />lots during the sidewalk and trail construction and their associated curing periods in <br />order to prevent any adverse impacts on them prior to City inspection and approval. <br />All boulevard grading and restoration re-work must be completed by the Developer <br />immediately following the sidewalk or trail construction. In the event that the <br />Developer does not adhere to the requirements in this paragraph, the Developer <br />must immediately complete corrective work to the sidewalks, trails, and boulevard <br />areas in the manner identified by the City at the Developer’s expense. All sidewalk <br />and trail corrections must be made by contractors under the direction of the <br />Developer in accordance with the approved plans and specifications for the <br />Subdivision. All corrective work must be inspected and approved by the City. The <br />Developer agrees that the failure by the Developer to immediately address <br />corrections identified by the City may result in the City immediately placing a stop <br />work order on all construction activity within the Subdivision until the corrections are <br />made to the satisfaction of the City. <br />I. No sewer and water connection permits may be issued until the streets needed for <br />access have been paved with a bituminous surface and the utilities are tested and <br />approved by the City Engineer. <br />28. RESPONSIBILITY FOR COSTS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.